Council planning record

Formation of staff car park, minibus parking area, retaining structures, stairs, footpath, revised junction geometry, access road regrading, access road and car park resurfacing, barriers, lighting, landscape and associated works

Outward Bound Centre, Bryn Eithin, Aberdyfi. LL35 0RA

All consultations completeReference: NP5/50/10QEryri National Park

Last published check: 4 Oct 2026, 09:44. Check the council record for more recent changes.

Application location

Outward Bound Centre, Bryn Eithin, Aberdyfi. LL35 0RA

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Full
Received
12 Aug 2025
Validated
Not published
Determination deadline
6 Oct 2025
Local authority
Eryri National Park

Application overview

Formation of staff car park, minibus parking area, retaining structures, stairs, footpath, revised junction geometry, access road regrading, access road and car park resurfacing, barriers, lighting, landscape and associated works

Proposal details

Reference
NP5/50/10Q
Alternative references
PP-14037810
Ward
Aberdyfi ED
Parish
Aberdovey
Agent
Mr. D. Brown
UPRN
10070358234

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 44 of 44

DocumentPublishedAction
TS Appendix 3 Swept Paths.pdfNot publishedView
TS Appendix 2 Proposed Site Layout.pdfNot publishedView
Tree Report.pdfNot publishedView
Tree Planting Plan.pdfNot publishedView
Transport Statement-1-11.pdfNot publishedView
Topo Survey Sheet 4 S-1718G.pdfNot publishedView
Topo Survey Sheet 3 S-1718G.pdfNot publishedView
Topo Survey Sheet 2 S-1718G.pdfNot publishedView
Topo Survey S-1718G 01.pdfNot publishedView
Site Investigation Report.pdfNot publishedView
PEA and GIS Report (2025 Final).pdfNot publishedView
P-1718K 04 Proposed Layout Tile 3.pdfNot publishedView
P-1718J 01 Proposed Site Layout.pdfNot publishedView
P-1718H 03 Proposed Layout Tile 2.pdfNot publishedView
P-1718H 02 Proposed Layout Tile 1.pdfNot publishedView
P-1718G 13 Masterplan.pdfNot publishedView
P-1718G 07 Long Sections.pdfNot publishedView
P-1718G 06 Site Sections.pdfNot publishedView
P-1718G 05 Swept Paths.pdfNot publishedView
P-1718A 14 Arboricultural.pdfNot publishedView
Lighting Assessment.pdfNot publishedView
Landscape and Visual Appraisal.pdfNot publishedView
202504 LVA AppD.pdfNot publishedView
202504 LVA AppC.pdfNot publishedView
202504 LVA AppB.pdfNot publishedView
202504 LVA AppA.pdfNot publishedView
OS-1718E Location Plan.pdfNot publishedView
ApplicationFormRedacted.pdfNot publishedView
S - CNC / NRW 27.08.2527 Aug 2025View
S - Gwasanaeth Tân & Achub / Fire & Rescue Service 29.08.2529 Aug 2025View
S - D"{r Cymru / Welsh Water 02.09.253 Sept 2025View
S - YGC9 Sept 2025View
S - Heneb 10.09.2510 Sept 2025View
S - Iechyd Amgylchedd / Environmental Health 18.09.2519 Sept 2025View
S - Ecoleg / Ecology 22.09.2523 Sept 2025View
S - Network Rail2 Oct 2025View
Drainage_Plan.pdf16 Oct 2025View
Drainage_Statement.pdf16 Oct 2025View
Site_Testing_Report.pdf16 Oct 2025View
Arb_Method_Statement_and_Planting_Maintenance_Redacted.pdf24 Oct 2025View
Outward_Bound_Tree_Drawings.pdf24 Oct 2025View
S - D"{r Cymru / Welsh Water 03.11.253 Nov 2025View
S - YGC 04.11.255 Nov 2025View
RhP.pdf28 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan 0S-1718E Existing Site Layout (GA) P-1718 Rev G 01 Existing Site Layout Plan (Tile 1) P-1718 Rev G 02 Existing Site Layout Plan (Tile 2) P-1718 Rev G 03 Existing Site Layout Plan (Tile 3) P-1718 Rev G 04 Masterplan with Planting Zones P-1718 Rev A 14 Bus and Coach Swept Paths P-1718 Rev A 05 Proposed Section S01 to S05 P-1718 Rev G 06 Proposed Section Through Access Road and Steps P-1718 Rev G 07 Masterplan P-1718 Rev H 13 Proposed Site Layout Plan (Tile 1) P-1718 Rev H 02 Proposed Site Layout Plan (Tile 2) P-1718 Rev H 03 Proposed Site Layout Plan (GA) P-1718 Rev J 01 Proposed Site Layout Plan (Tile 3) P-1718 Rev K 04 Tree Replacement Plan WAL_24_032_04 Rev D Arboricultural Method Statement & Planting Maintenance (14.11.25) West Coast Arboriculture & Land Planning Ltd. Arboricultural Planning Assessment (13.05.25) West Coast Arboriculture & Land Planning Ltd. Preliminary Ecological Assessment Report (25.07.25)(v2) Cambrian Ecology Ltd. Exterior Lighting Design and Lighting Impact Assessment (20.05.25) Miller Goodall Exterior Lighting Design (12.05.25) Miller Goodall
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Location Plan 0S-1718E Existing Site Layout (GA) P-1718 Rev G 01 Existing Site Layout Plan (Tile 1) P-1718 Rev G 02 Existing Site Layout Plan (Tile 2) P-1718 Rev G 03 Existing Site Layout Plan (Tile 3) P-1718 Rev G 04 Masterplan with Planting Zones P-1718 Rev A 14 Bus and Coach Swept Paths P-1718 Rev A 05 Proposed Section S01 to S05 P-1718 Rev G 06 Proposed Section Through Access Road and Steps P-1718 Rev G 07 Masterplan P-1718 Rev H 13 Proposed Site Layout Plan (Tile 1) P-1718 Rev H 02 Proposed Site Layout Plan (Tile 2) P-1718 Rev H 03 Proposed Site Layout Plan (GA) P-1718 Rev J 01 Proposed Site Layout Plan (Tile 3) P-1718 Rev K 04 Tree Replacement Plan WAL_24_032_04 Rev D Arboricultural Method Statement & Planting Maintenance (14.11.25) West Coast Arboriculture & Land Planning Ltd. Arboricultural Planning Assessment (13.05.25) West Coast Arboriculture & Land Planning Ltd. Preliminary Ecological Assessment Report (25.07.25)(v2) Cambrian Ecology Ltd. Exterior Lighting Design and Lighting Impact Assessment (20.05.25) Miller Goodall Exterior Lighting Design (12.05.25) Miller Goodall
  5. Prior to the occupation of the development hereby approved, the invasive species identified in Figure 11 of the Preliminary Ecological Assessment Report (25.07.25) (v2), Cambrian Ecology Ltd. (PEA) shall be eradicated in accordance with the PEA.
  6. Cyn meddiannu'r datblygiad a gymeradwyir drwy hyn, rhaid dileu'r rhywogaeth ymledol a nodwyd yn Ffigur 11 o'r 'Preliminary Ecological Assessment Report (25.07.25) (v2), Cambrian Ecology Ltd. (PEA)' yn unol â'r PEA
  7. All planting comprised in the approved landscaping details shown on drawing ‘WAL_24_032_04 Rev D’ shall be carried out in the first planting and seeding seasons following the occupation of the development or the completion of the development, whichever is sooner; and any trees or plants which within the period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species
  8. Rhaid cynnal yr holl blannu sydd wedi'i gynnwys yn y manylion tirlunio cymeradwy a ddangosir ar luniad 'WAL_24_032_04 Rev D' yn ystod y tymhorau plannu a hadu cyntaf yn dilyn meddiannu'r datblygiad neu gwblhau'r datblygiad, pa un bynnag sydd gyntaf; a rhaid disodli unrhyw goed neu blanhigion sydd, o fewn y cyfnod o 5 mlynedd o gwblhau'r datblygiad, yn y tymor plannu nesaf gydag eraill o faint a rhywogaeth debyg
  9. The installation of all external lighting in connection with the development hereby approved shall be carried out strictly in accordance with drawing ‘Exterior Lighting Design (12.05.25) Miller Goodall (Approved Specification)’, and the Approved Specification shall be retained for the lifetime of the development hereby approved
  10. Rhaid gosod yr holl oleuadau allanol mewn cysylltiad â'r datblygiad a gymeradwyir drwy hyn yn unol yn llwyr â'r gynllun 'Exterior Lighting Design (12.05.25) Miller Goodall (Approved Specification)', a rhaid cadw'r Fanyleb Gymeradwy am oes y datblygiad a gymeradwyir drwy hyn.
  11. No surface water from any increase in the impermeable surfaces within the development shall be allowed to drain directly or indirectly to the public highway
  12. Ni chaniateir i unrhyw dd"{r wyneb o unrhyw gynnydd yn yr arwynebau anhydraidd o fewn y datblygiad ddraenio'n uniongyrchol nac yn anuniongyrchol i'r briffordd gyhoeddus
  13. The car parking and turning areas hereby approved shall be laid out in accordance with the approved plans before their use, and they shall not thereafter be used for any other purpose
  14. Rhaid gosod y mannau parcio ceir a throi a gymeradwyir drwy hyn yn unol â'r cynlluniau cymeradwy cyn eu defnyddio, ac ni chânt eu defnyddio at unrhyw ddiben arall wedi hynny
  15. 8) The construction of the stone wall(s) in the development hereby approved shall not commence until the following details have been submitted to and approved in writing by the Local Planning Authority: - Height of the stone wall(s). - Source of the local natural stone to be used in the construction of the stone wall or natural stones with equivalent colour, texture and weathering characteristics. - Full details of how the stonework will be laid, coursed and pointed. The approved details shall then be implemented in full and shall be retained for the lifetime of the development.
  16. Ni fydd adeiladu'r wal(iau) cerrig yn y datblygiad a gymeradwyir drwy hyn yn dechrau nes bod y manylion canlynol wedi'u cyflwyno i'r Awdurdod Cynllunio Lleol a'u cymeradwyo'n ysgrifenedig ganddo: - Uchder y wal(iau) cerrig. - Ffynhonnell y garreg naturiol leol i'w defnyddio wrth adeiladu'r wal garreg neu gerrig naturiol gyda nodweddion lliw, gwead a thywydd cyfatebol. - Manylion llawn sut y bydd y gwaith cerrig yn cael ei osod, ei osod mewn cwrs a'i bwyntio. Yna bydd y manylion cymeradwy yn cael eu gweithredu'n llawn a'u cadw am oes y datblygiad.
  17. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  18. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  19. To define the permission and for the avoidance of doubt.
  20. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
  21. To provide biodiversity enhancements in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and Planning Policy Wales
  22. Darparu gwelliannau bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a Pholisi Cynllunio Cymru a fabwysiadwyd
  23. To ensure the provision of biodiversity and landscape enhancements in accordance with policy DP 6 of the Eryri Local Development Plan 2016-2031
  24. Sicrhau bod gwelliannau bioamrywiaeth a thirwedd yn cael eu darparu yn unol â pholisi DP 6 o Gynllun Datblygu Lleol Eryri 2016-2031
  25. To minimise disturbance to bats, which are European Protected Species and the amenities of the area in accordance with Eryri Local Development Plan Policies and in particular Policy D and DP 1
  26. Er mwyn lleihau'r aflonyddwch i ystlumod, sy'n Rhywogaethau Gwarchodedig Ewropeaidd a mwynderau'r ardal yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D a DP 1
  27. In the interest of highway safety, in accordance with Eryri Local Development Plan Policies, and particularly Policy 1
  28. Er budd diogelwch y priffyrdd, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri, ac yn benodol Polisi 1
  29. In the interest of highway safety & convenience, in accordance with Eryri Local Development Plan Policies and in particular Policy 1
  30. Er mwyn diogelwch a chyfleustra'r briffordd, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi 1
  31. To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies and in particular policies 1, 6 and A
  32. Er mwyn sicrhau safon foddhaol o ran ymddangosiad y datblygiad a defnyddio deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol polisïau 1, 6 ac A
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.