The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • KM/GMB/51023 0/0: Location Plan • KM/GMB/51023 0/1: Proposed Elevations and Floor Plans • Preliminary Protected Species Survey (York Associates, April 2024)
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • KM/GMB/51023 0/0: Location Plan • KM/GMB/51023 0/1: Proposed Elevations and Floor Plans • Preliminary Protected Species Survey (York Associates, Ebrill 2024)
The applicant/developer shall ensure that the mitigation recommended in the bat survey report (York Associates, April 2024) are followed and implemented in full.
Rhaid i'r ymgeisydd / datblygwr sicrhau bod y mesurau lliniaru a argymhellir yn adroddiad yr arolwg ystlumod York Associates, Ebrill 2024) yn cael eu dilyn a’u rhoi ar waith yn llawn.
The external walls to the front elevation of the building shall be constructed of local natural stone to match those of the adjacent dwellinghouse
Rhaid i waliau allanol drychiad blaen yr adeilad gael eu hadeiladu o gerrig naturiol lleol i gydweddu â rhai'r t"} annedd cyfagos
The roof of the extension shall be covered in natural Welsh mineral slate or slates of the equivalent colour, texture and weathering characteristics as the slates on the main roof of the dwellinghouse and maintained thereafter
Rhaid gorchuddio to'r estyniad gyda llechi mwynol Cymreig naturiol neu lechi o'r un lliw, gwead a nodweddion hindreulio a'r llechi ar brif do'r t"} annedd a'u cynnal wedi hynny
The building hereby approved shall at no time be externally lit unless agreed to by submission of and approval of details by means of formal application to the Local Planning Authority
Ni chaniateir i'r adeilad a ganiateir drwy hyn gael ei oleuo'n allanol ar unrhyw adeg oni bai y cytunir drwy gyflwyno a chymeradwyo manylion trwy gais ffurfiol i'r Awdurdod Cynllunio Lleol
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policy D.
Er mwyn sicrhau safon foddhaol y datblygiad a lleihau'r risg o niwed neu ymyrraeth annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig Polisi D.
To ensure the satisfactory appearance of the development.
Er mwyn sicrhau edrychiad boddhaol y datblygiad
To ensure the satisfactory appearance of the development
Er mwyn sicrhau edrychiad boddhaol y datblygiad
To minimise the risk of unacceptable harm or disturbance to protected species or any adverse effect on the dark Skies Reserve designation in accordance with Eryri Local Development Plan Policies and in particular Policies D and 2.
Lleihau’r risg o niwed neu aflonyddwch annerbyniol i rywogaethau a warchodir neu unrhyw effaith andwyol ar y dynodiad Gwarchodfa Awyr dywyll yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig Polisïau D a 2
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.