The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • National Trust – PYB/PM/01 – Location Plan • National Trust – PYB/PM/02 – Site Plan • PYB/PM/03 – Roof Plan – Dated 09/04/2025 • PYB/PM/04 – Elevations – Dated 11/06/2025 • Johnston, A. 2025. Protected Species Survey Report – for Pen y Bont Corn Barn, Penmachno, Conwy, LL24 0RA – Undertaken by A L Johnston Ecology – Report date 15th July 2025. • Details received from applicant via correspondence dated the 20th October 2025. • Heritage Impact Assessment – Proposed re-roofing of hipped roof covering to hay barn at Pen y Bont Farm, Penmachno – Dated 08/04/2025 – revision B – Received 30/09/2025 • Access Statement – Proposed re-roofing of hipped roof covering to hay barn at Pen y Bont Farm, Penmachno – Dated 09/04/2025
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • National Trust – PYB/PM/01 – Location Plan • National Trust – PYB/PM/02 – Site Plan • PYB/PM/03 – Roof Plan – Dyddiedig 09/04/2025 • PYB/PM/04 – Elevations – Dyddiedig 11/06/2025 • Johnston, A. 2025. Protected Species Survey Report – for Pen y Bont Corn Barn, Penmachno, Conwy, LL24 0RA – Undertaken by A L Johnston Ecology – Dyddiad yr Adroddiad 15ed Gorffennaf 2025. • Manylion a dderbyniwyd gan yr ymgeisydd drwy ohebiaeth dyddiedig 20fed Hydref 2025. • Heritage Impact Assessment – Proposed re-roofing of hipped roof covering to hay barn at Pen y Bont Farm, Penmachno – Dyddiedig 08/04/2025 – revision B – Derbynwyd 30/09/2025 • Access Statement – Proposed re-roofing of hipped roof covering to hay barn at Pen y Bont Farm, Penmachno – Dyddiedig 09/04/2025
The existing slate shall be retained and re-used wherever possible. Replacement slates shall be of an equivalent colour, texture, size, and weathering characteristics as the existing and retained thereafter
Dylid cadw ac ail-ddefnyddio'r llechi presennol lle bynnag y bo modd. Dylai llechi newydd fod o liw, gwead, maint a nodweddion tywyddio cyfatebol â'r rhai presennol a'u cadw wedi hynny
The applicant/developer shall ensure that the mitigation measures and recommendations set out in Section 7 of the protected species survey report (Johnston, A. 2025. Protected Species Survey Report – for Pen y Bont Corn Barn, Penmachno, Conwy, LL24 0RA – Undertaken by A L Johnston Ecology – Report date 15th July 2025) are followed and implemented in full as per the report
Rhaid i'r ymgeisydd/datblygwr sicrhau bod y mesurau lliniaru a'r argymhellion a nodir yn Adran 7 o adroddiad arolwg y rhywogaethau gwarchodedig (Johnston, A. 2025. Protected Species Survey Report – for Pen y Bont Corn Barn, Penmachno, Conwy, LL24 0RA – Undertaken by A L Johnston Ecology – Dyddiad yr adroddiad 15 Gorffennaf 2025) yn cael eu dilyn a'u gweithredu'n llawn yn unol â'r adroddiad
On completion of the hereby approved works, a plan illustrating the locations of the access gaps retained for bats, as stipulated in Section 7.3 of the submitted protected species survey report (Johnston, A. 2025. Protected Species Survey Report – for Pen y Bont Corn Barn, Penmachno, Conwy, LL24 0RA – Undertaken by A L Johnston Ecology – Report date 15th July 2025), shall be submitted to and approved in writing by the Local Planning Authority by means of a formal application
Ar ôl cwblhau'r gwaith a gymeradwywyd drwy hyn, rhaid cyflwyno cynllun yn dangos lleoliadau'r bylchau mynediad a gedwir ar gyfer ystlumod, fel y nodir yn Adran 7.3 o'r adroddiad arolwg rhywogaethau gwarchodedig a gyflwynwyd (Johnston, A. 2025. Protected Species Survey Report – for Pen y Bont Corn Barn, Penmachno, Conwy, LL24 0RA – Undertaken by A L Johnston Ecology – Dyddiad yr adroddiad 15 Gorffennaf 2025), i'r Awdurdod Cynllunio Lleol a'i gymeradwyo ganddo yn ysgrifenedig trwy gais ffurfiol
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To ensure a satisfactory standard of development and to safeguard the character and appearance of the listed building in accordance with policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031
Er mwyn sicrhau safon foddhaol o ddatblygiad a diogelu cymeriad ac ymddangosiad yr adeilad rhestredig yn unol â pholisïau A, Ff, 1, 6 a 7 o Gynllun Datblygu Lleol Eryri 2016-2031
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.