Council planning record

Erection of single storey side extension, single storey plant room, glazed link corridor, glazed conservatory, reconfigured front porch, erection of rear porch, erection of timber log store

Snowdon View, Dolwyddelan. LL25 0UJ

All consultations completeReference: NP4/16/37BEryri National Park

Last published check: 2 Oct 2026, 20:49. Check the council record for more recent changes.

Application location

Snowdon View, Dolwyddelan. LL25 0UJ

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Full
Received
23 Oct 2024
Validated
Not published
Determination deadline
17 Dec 2024
Local authority
Eryri National Park

Application overview

Erection of single storey side extension, single storey plant room, glazed link corridor, glazed conservatory, reconfigured front porch, erection of rear porch, erection of timber log store

Proposal details

Reference
NP4/16/37B
Alternative references
PP-13346901
Development type
Minor
Ward
Betws-y-Coed and Trefriw ED
Parish
Dolwyddelan
Agent
Mr. John Jones
UPRN
10035301148

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
FF21 Aug 2024View
C121 Aug 2024View
C221 Aug 2024View
C321 Aug 2024View
C421 Aug 2024View
C521 Aug 2024View
C621 Aug 2024View
C721 Aug 2024View
C821 Aug 2024View
C921 Aug 2024View
C1021 Aug 2024View
C1121 Aug 2024View
C1221 Aug 2024View
CS121 Aug 2024View
LL21 Aug 2024View
E121 Aug 2024View
E221 Aug 2024View
E54 Sept 2024View
E44 Sept 2024View
E34 Sept 2024View
C1423 Sept 2024View
C1323 Sept 2024View
E723 Sept 2024View
E623 Sept 2024View
S - Dwr Cymru / Welsh Water7 Nov 2024View
Rh.P7 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Site notice date

    Published milestoneCouncil source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: 723-05-24-11 Location Plan 713-01-24-10 Proposed Block Plan 723-05-24 -07-01 Rev A Proposed Elevations 723-05-24 -07-02 Rev A Proposed Elevations 723-05-24 – 06-01 Proposed Ground Floor 723-05-24-06-02 Proposed Ground Floor 723-05-24-08-01Proposed Section 723-05-24-08-02 Proposed Section 723-05-24-09-01 Proposed Section 723-05-24-09-02 Proposed Section Protected Species Survey and Biodiversity Enhancement Plan (Sally Clifton, Ecological Consultant, October 2024) Green Infrastructure Statement Planning Supporting Statement – JPJ Design
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: 723-05-24-11 Location Plan 713-01-24-10 Proposed Block Plan 723-05-24 -07-01 Rev A Proposed Elevations 723-05-24 -07-02 Rev A Proposed Elevations 723-05-24 – 06-01 Proposed Ground Floor 723-05-24-06-02 Proposed Ground Floor 723-05-24-08-01Proposed Section 723-05-24-08-02 Proposed Section 723-05-24-09-01 Proposed Section 723-05-24-09-02 Proposed Section Protected Species Survey and Biodiversity Enhancement Plan (Sally Clifton, Ecological Consultant, October 2024) Green Infrastructure Statement Planning Supporting Statement – JPJ Design
  5. The applicant/developer shall ensure that the mitigation recommended in Sections 5.3 – 5.5 of the Protected Species Survey and Biodiversity Enhancement Plan (Sally Clifton, Ecological Consultant, October 2024) are followed and implemented in full.
  6. Rhaid i'r ymgeisydd / datblygwr sicrhau bod y mesurau lliniaru a argymhellir yn adran 5.3-5.5 o adroddiad Protected Species Survey and Biodiversity Enhancement Plan (Sally Clifton, Ecological Consultant, October 2024) yn cael eu dilyn a’u rhoi ar waith yn llawn.
  7. The biodiversity enhancement measures contained in section 6 of the Protected Species Survey and Biodiversity Enhancement Plan (Sally Clifton, Ecological Consultant, October 2024) and section 7 of the Green Infrastructure Statement shall take place within 3 months of the substantial completion of the development hereby permitted.
  8. Bydd rhaid i'r mesurau gwelliant bioamrywiaeth yn adran6 o adroddiad Protected Species Survey and Biodiversity Enhancement Plan (Sally Clifton, Ecological Consultant, October 2024) ac adran 7 or Datganiad Seilwaith Gwyrdd gael eu gwneud o fewn 3 mis o gwblhau'n sylweddol y datblygiad a ganiateir yma.
  9. No surface water from any increase in roof area of the building / or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system.
  10. Ni chaniateir i dd"{r wyneb o unrhyw gynnydd yn ardal to yr adeilad / neu arwynebau anhydraidd o fewn ei gwrtil ddraenio'n uniongyrchol neu'n anuniongyrchol i'r system garthffosiaeth gyhoeddus.
  11. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  12. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  13. To define the permission and for the avoidance of doubt.
  14. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
  15. To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policy D.
  16. Er mwyn sicrhau safon foddhaol y datblygiad a lleihau'r risg o niwed neu ymyrraeth annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig Polisi D.
  17. To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and Planning Policy Wales.
  18. Er mwyn sicrhau gwelliannau bioamrywiaeth yn unol â Polisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a Polisi Cynllunio Cymru.
  19. To prevent hydraulic overloading of the public sewerage system, to protect health and safety of existing residents and ensure no pollution of or detriment to the environment.
  20. I atal gorlwytho hydrolig y system garthffosiaeth gyhoeddus, i ddiogelu iechyd a diogelwch preswylwyr presennol a sicrhau nad oes llygredd neu niwed i'r amgylchedd.
  21. Advisory Note: 1. Please refer to the Advisory Notes in the letter from DCWW dated 06.11.2024
  22. Nodyn cynghori : 1. Cyfeiriwch at y Nodiadau Cynghori yn y llythyr gan DCWW dyddiedig 06.11.2024
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.