The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location plan – (23/10/24); Proposed Block Plan and Elevations 011-DR Rev P01 (27/2/25) Green infrastructure Statement, Clwydian Planning (received 20/02/25) Bat and Nesting Bird Assessment, P J Ecological Solutions, Feb 2025 Fastensol-datasheet-tile-roof – (4/3/25) DAS-DH108ND-EN-435-465 Black Pro (003) – (4/3/25)
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Location plan – (23/10/24); Proposed Block Plan and Elevations 011-DR Rev P01 (27/2/25) Green infrastructure Statement, Clwydian Planning (received 20/02/25) Bat and Nesting Bird Assessment, P J Ecological Solutions, Feb 2025 Fastensol-datasheet-tile-roof – (4/3/25) DAS-DH108ND-EN-435-465 Black Pro (003) – (4/3/25)
The development thereby approved shall be carried out in strict accordance with Section 4.2 and Appendix 1: Precautionary Working Method Statement(Bats) of the submitted Bat and Nesting Bird Assessment (P J Ecological Solutions, Feb 2025) and shall be undertaken between 1st November and 31st March only.
The developer/applicant shall ensure that the bat and bird boxes shown on the approved plans (011-DR Rev P01) and detailed within the Green Infrastructure Statement (Clwydian Ecology) shall be of woodstone/woodcrete construction and installed in line with the timing set out in Appendix 1 of the submitted Bat and Nesting Bird Assessment (P J Ecological Solutions, Feb 2025).
The mounting system/means of fixing the approved solar panels to the roof of the building shall be coloured black or slate grey.
Rhaid cyflawni'r datblygiad a ganiateir drwy hynny yn gwbl unol ag Adran 4.2 ac Atodiad 1: Datganiad Dull Gweithio Rhagofalus (Ystlumod) o'r Asesiad Ystlumod ac Adar Nythu a gyflwynwyd (P J Ecological Solutions, Chwefror 2025) a bydd yn cael ei wneud rhwng 1 Tachwedd a 31 Mawrth yn unig.
Bydd rhaid i'r datblygwr/ymgeisydd sicrhau bod y blychau ystlumod ac adar a ddangosir ar y cynlluniau a gymeradwywyd (011-DR Rev P01) ac y manylir arnynt yn y Datganiad Seilwaith Gwyrdd (Clwydian Ecology) o wneuthuriad carreg bren/crete pren ac wedi’u gosod yn unol â’r amseriad a nodir yn Atodiad 1 yr Asesiad Ystlumod ac Adar Nythu (P J Ecological Solutions, Chwefror 205) a gyflwynwyd.
Rhaid i'r system fowntio/dull o osod y paneli solar a ganiateir ar do'r adeilad fod o liw du neu lechi llwyd.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and Planning Policy Wales.
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies and in particular policies 1, 6, A and Ff.
Er mwyn lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig Polisi D.
Sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri mabwysiedig a Pholisi Cynllunio Cymru.
Er mwyn sicrhau safon edrychiad boddhaol i'r datblygiad a'r defnydd o ddeunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig polisïau 1, 6, A a Ff.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.