The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Drawing No. - 316.01 – Location Plan • Drawing No. - 316.02 – Proposed Site Layout Plan and Longitudinal Section • Drawing No. - 316.03 – Proposed General Purpose Agricultural Building-Plan and Section • Drawing No. - 316.04 – Elevations • Green Infrastructure Statement - Dated June 2024 • Justification Statement - Dated 31 May 2024
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Drawing No. - 316.01 – Location Plan • Drawing No. - 316.02 – Proposed Site Layout Plan and Longitudinal Section • Drawing No. - 316.03 – Proposed General Purpose Agricultural Building-Plan and Section • Drawing No. - 316.04 – Elevations • Green Infrastructure Statement - Dyddiedig Mehefin 2024 • Justification Statement - Dyddiedig 31 Mai 2024
The building hereby approved shall only be used for the purposes of agriculture and shall not be used for any other purpose
Bydd yr adeilad a ganiateir drwy hyn yn cael ei ddefnyddio at ddibenion amaethyddiaeth yn unig ac ni chaiff ei ddefnyddio i unrhyw ddiben arall
The applicant/developer shall ensure that the mitigation and enhancement measures within Section 3 of the Green Infrastructure Statement - Dated June 2024, are followed and implemented in full
Bydd yr ymgeisydd/datblygwr yn sicrhau bod y mesurau lliniaru a gwella yn Adran 3 o'r 'Green Infrastructure Statement - Dyddiedig Mehefin 2024', yn cael eu dilyn a'u gweithredu'n llawn
No surface water and/or land drainage shall be allowed to connect directly or indirectly with the public sewerage network
Ni chaniateir i dd"{r wyneb a/neu ddraeniad tir gysylltu’n uniongyrchol neu’n anuniongyrchol â’r rhwydwaith carthffosiaeth cyhoeddus
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
For the avoidance of doubt as to the use of the approved development and to protect the character of the surrounding area in accordance with Eryri Local Development Plan Policies
I osgoi amheuaeth ynghylch defnydd y datblygiad a gymeradwywyd ac i warchod cymeriad yr ardal o gwmpas yn unol â Pholisïau Cynllun Datblygu Lleol Eryri
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig Polisi D
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig Polisi D
To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment
I atal gorlwytho hydrolig o'r system garthffosiaeth gyhoeddus, i ddiogelu iechyd a diogelwch trigolion presennol a sicrhau nad oes llygredd neu niwed i'r amgylchedd
The biodiversity enhancement measures shown on Drawing No. 316.02 Proposed Site Layout Plan and the Green Infrastructure Statement - Dated June 2024, shall be installed within 3 months of the substantial completion of the development hereby permitted
Bydd y mesurau gwella bioamrywiaeth a ddangosir ar 'Drawing No. 316.02 Proposed Site Layout Plan' a'r 'Green Infrastructure Statement - Dyddiedig Mehefin 2024', yn cael eu gosod o fewn 3 mis i gwblhau'n sylweddol y datblygiad a ganiateir drwy hyn
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.