The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Site OS Plan (Drawing A.00.01) • Site Block Plan (Drawing A.00.02) • Proposed Site Layout (Drawing A.00.04 Rev 01 – WIP) • Proposed Garage and Store (Drawing A.02.01) • Preliminary Ecological Assessment – Cambrian Ecology Ltd – 14th October 2024 • Green Infrastructure Statement – Fenton & Reece
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Site OS Plan (Drawing A.00.01) • Site Block Plan (Drawing A.00.02) • Proposed Site Layout (Drawing A.00.04 Rev 01 – WIP) • Proposed Garage and Store (Drawing A.02.01) • Preliminary Ecological Assessment – Cambrian Ecology Ltd – 14th October 2024 • Green Infrastructure Statement – Fenton & Reece
The roof of the building shall be covered in natural Welsh mineral slate or slates of the equivalent colour, texture and weathering characteristics as the slates on the main roof of the dwelling house and maintained thereafter.
Mae'n rhaid i do'r adeilad gael ei orchuddio gyda llechi mwyn naturiol Cymreig, neu lechi gyda nodweddion lliw, gwead a hindreuliad tebyg fel y llechi ar brif do’r t"} ac wedyn ei gadw felly.
The external walls of the building shall be constructed throughout of local natural stone to match those of the existing dwellinghouse.
Bydd rhaid i waliau allanol yr adeilad gael eu hadeiladu yn llwyr gyda cherrig naturiol lleol sy’n cydweddu a rhai'r t"} presennol.
The applicant/developer shall ensure that the mitigation recommended in Section 7 of the ‘Preliminary Ecological Assessment (Cambrian Ecology Ltd. – 14th October 2024)’ are followed and implemented in full.
Rhaid i'r ymgeisydd / datblygwr sicrhau bod y mesurau lliniaru a argymhellir yn Rhan 7 o'r ‘Preliminary Ecological Assessment (Cambrian Ecology Ltd. – 14th October 2024)’ yn cael eu dilyn a’u rhoi ar waith yn llawn.
The biodiversity enhancement measures shown on ‘Proposed Site Layout Drawing A.00.04 Rev 1 – WIP’ and ‘Proposed Garage and Store Drawing A.02.01’ and contained in Section 8 of the ‘Preliminary Ecological Assessment (Cambrian Ecology Ltd. – 14th October 2024)’ shall take place within 3 months of the substantial completion of the development hereby permitted
Bydd rhaid i'r mesurau gwelliant bioamrywiaeth a ddangosir ar gynllun ‘Proposed Site Layout Drawing A.00.04 Rev 1 – WIP’ a ‘Proposed Garage and Store Drawing A.02.01’ a gynhwysir yn Adran 8 o’r ‘Preliminary Ecological Assessment (Cambrian Ecology Ltd. – 14th October 2024)’ gael eu gwneud o fewn 3 mis o gwblhau'n sylweddol y datblygiad a ganiateir yma.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies 1, 6 and A.
Er mwyn sicrhau fod y datblygiad yn edrych yn foddhaol ac y defnyddir deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig polisïau 1, 6 ag A.
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies A, 1, 6 (and 7 if applicable).
Er mwyn sicrhau fod y datblygiad yn edrych yn foddhaol ac y defnyddir deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig polisïau A, 1, 6 (a 7 os yn berthnasol).
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policy D.
Er mwyn sicrhau safon foddhaol y datblygiad a lleihau'r risg o niwed neu ymyrraeth annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig Polisi D.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales.
Er mwyn sicrhau gwelliannau bioamrywiaeth yn unol â Polisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a paragraff 6.4.5 o Bolisi Cynllunio Cymru.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.