The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Location Plan (S1.01 Rev D) (26/01/2026) • Proposed Elevations (S3.07 Rev E) (26/01/2026) • Proposed First Floor and Roof Plans (S2.06 Rev C) (04/07/2025) • Proposed Ground Floor Plans (S2.05 Rev C) (04/07/2025) • Proposed Sections Plans (S2.05 Rev D) (26/01/2026) • Proposed Site Plan (23.05a Rev E) (26/01/2026) • Green Infrastructure Statement (26/01/2026) • Ty’n y Ffynnon, Nant Peris, Proposed Building Renovation & Construction of a Porch, Preliminary Ecological Assessment, 14th October 2025
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Location Plan (S1.01 Rev D) (26/01/2026) • Proposed Elevations (S3.07 Rev E) (26/01/2026) • Proposed First Floor and Roof Plans (S2.06 Rev C) (04/07/2025) • Proposed Ground Floor Plans (S2.05 Rev C) (04/07/2025) • Proposed Sections Plans (S2.05 Rev D) (26/01/2026) • Proposed Site Plan (23.05a Rev E) (26/01/2026) • Green Infrastructure Statement (26/01/2026) • Ty’n y Ffynnon, Nant Peris, Proposed Building Renovation & Construction of a Porch, Preliminary Ecological Assessment, 14eg Hydref 2025
The external timber of the porch shall not be stained, painted or creosoted.
Ni chaniateir i bren allanol y ports gael ei staenio, ei baentio nag â chreosot.
The applicant/developer shall ensure that the mitigation recommended in the bat survey report 'Ty’n y Ffynnon, Nant Peris, Proposed Building Renovation & Construction of a Porch, Preliminary Ecological Assessment, 14th October 2025' are followed and implemented in full.
Rhaid i'r ymgeisydd / datblygwr sicrhau bod y mesurau lliniaru a argymhellir yn adroddiad yr arolwg ystlumod 'Ty’n y Ffynnon, Nant Peris, Proposed Building Renovation & Construction of a Porch, Preliminary Ecological Assessment, 14eg Hydref 2025' yn cael eu dilyn a’u rhoi ar waith yn llawn.
The biodiversity enhancement measures shown on drawing ‘Proposed Site Plan (23.05a Rev E) (26/01/2026)’ shall be implemented within the first available planting season and maintained thereafter
Dylid gweithredu'r mesurau gwella bioamrywiaeth a ddangosir ar y llun 'Proposed Site Plan (23.05a Rev E) (26/01/2026)' o fewn y tymor plannu cyntaf sydd ar gael a'u cynnal wedi hynny
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To allow the external timber to weather naturally and to safeguard the character and appearance of the immediate locality in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policies A, 1, 6 (and 7).
Er mwyn galluogi'r pren allanol i hindreulio yn naturiol ac er mwyn diogelu cymeriad ac edrychiad yr ardal gyfagos yn unol â Polisiau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig Polisiau A, 1 a 6 (a 7).
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policy D.
Er mwyn sicrhau safon foddhaol y datblygiad a lleihau'r risg o niwed neu ymyrraeth annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig Polisi D.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales
Er mwyn sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.