The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • 23236 S3.00 rev G: Location Plan • 23236 S3.06 rev G: Site Plan • 23236 S3.11 rev H: Proposed NE & SE elevations • 23236 S3.10 rev H: Proposed SW & NW elevations • 23236 S3.07 rev G: Proposed Floor Plans - Ground • 23236 S3.08 rev G: Proposed Floor Plans - First • 23236 S3.09 rev H: Proposed Floor Plans - Roof • 23236 S3.15 rev E: Proposed Section A • Green Infrastructure Statement rev C, 08 July 2025
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod • 23236 S3.00 rev G: Location Plan • 23236 S3.06 rev G: Site Plan • 23236 S3.11 rev H: Proposed NE & SE elevations • 23236 S3.10 rev H: Proposed SW & NW elevations • 23236 S3.07 rev G: Proposed Floor Plans - Ground • 23236 S3.08 rev G: Proposed Floor Plans - First • 23236 S3.09 rev H: Proposed Floor Plans - Roof • 23236 S3.15 rev E: Proposed Section A • Green Infrastructure Statement rev C, 08 July 2025
The applicant/developer shall ensure that the compensation/mitigation recommended in the Green Infrastructure Statement (Evergreen Architects, 08 July 2025) are followed and implemented in full.
Rhaid i'r ymgeisydd/datblygwr sicrhau bod y camau iawndal/lliniaru a argymhellir yn y Datganiad Seilwaith Gwyrdd (Evergreen Architects, 08 Gorffennaf 2025) yn cael eu dilyn a'u gweithredu'n llawn.
The roof of the extension and porch shall be covered in natural Welsh mineral slate or slates of the equivalent colour, texture and weathering characteristics as the slates on the main roof of the dwelling house and maintained thereafter.
Mae'n rhaid i do'r estyniad a'r ports gael ei orchuddio gyda llechi mwyn naturiol Cymreig, neu lechi gyda nodweddion lliw, gwead a hindreuliad tebyg fel y llechi ar brif do’r t"} ac wedyn ei gadw felly.
The external timber to the existing dwelling and extension hereby approved shall not be stained, painted or creosoted.
Ni chaniateir i bren allanol yr annedd presennol gael ei staenio, ei baentio nag â chreosot.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policy D.
Er mwyn sicrhau safon foddhaol y datblygiad a lleihau'r risg o niwed neu ymyrraeth annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig Polisi D.
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies 1, 6 and A.
Er mwyn sicrhau fod y datblygiad yn edrych yn foddhaol ac y defnyddir deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig polisïau 1, 6 ag A.
To allow the external timber to weather naturally and to safeguard the character and appearance of the immediate locality in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policies A, 1, 6.
Er mwyn galluogi'r pren allanol i hindreulio yn naturiol ac er mwyn diogelu cymeriad ac edrychiad yr ardal gyfagos yn unol â Polisiau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig Polisiau A, 1 a 6.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.