The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • 3236:25:1 - Location plan • 3236:25:5B – Proposed site plan • 3236:25:6f – Proposed floor plans • 3236:25:7C – Proposed elevations • 3236:25:8 – Proposed garage drawings • Bat Activity Survey, Clwydian Ecology, 18th July 2025
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • 3236:25:1 - Location plan • 3236:25:5B – Proposed site plan • 3236:25:6f – Proposed floor plans • 3236:25:7C – Proposed elevations • 3236:25:8 – Proposed garage drawings • Bat Activity Survey, Clwydian Ecology, 18th July 2025
The applicant/developer shall ensure that the mitigation recommended in the bat survey report by Clwydian Ecology, 18/07/2025 are followed and implemented in full.
Rhaid i'r ymgeisydd / datblygwr sicrhau bod y mesurau lliniaru a argymhellir yn adroddiad yr arolwg ystlumod gan Clwydian Ecology, 18/07/2025 yn cael eu dilyn a’u rhoi ar waith yn llawn.
The roof of the extensions shall be covered in natural Welsh mineral slate or slates of the equivalent colour, texture and weathering characteristics as the slates on the main roof of the dwelling house and maintained thereafter.
Mae'n rhaid i do'r estyniadau gael ei orchuddio gyda llechi mwyn naturiol Cymreig, neu lechi gyda nodweddion lliw, gwead a hindreuliad tebyg fel y llechi ar brif do’r t"} ac wedyn ei gadw felly.
Prior to any stonework commencing on the site, a trial stonework panel including pointing not less than 2.00 m² shall be constructed. No building operations in stone shall be carried out on the site unless and until the trial panel has been inspected and approved by means of a formal application to the Local Planning Authority. The stonework of the dwellinghouse/ building / extension shall be built in accordance with the approved sample.
Cyn i unrhyw waith cerrig ddechrau ar y safle, mae'n rhaid adeiladu panel o waith cerrig o nid llai na 2m sgwâr a'i bwyntio. Nid oes unrhyw waith adeiladu mewn cerrig i'w gyflawni ar y safle oni bai a hyd nes bod yr Awdurdod Cynllunio Lleol wedi archwilio a chymeradwyo'r panel drwy gais ffurfiol. Mae'n rhaid adeiladu gwaith cerrig yr estyniad yn unol â'r panel a gymeradwywyd.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policy D.
Er mwyn sicrhau safon foddhaol y datblygiad a lleihau'r risg o niwed neu ymyrraeth annerbyniol i rywogaethau a warchodir yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig Polisi D.
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies 1, 6 and A.
Er mwyn sicrhau fod y datblygiad yn edrych yn foddhaol ac y defnyddir deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig polisïau 1, 6 ag A.
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies A, 1, 6 (and 7 if applicable).
Er mwyn sicrhau fod y datblygiad yn edrych yn foddhaol ac y defnyddir deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig polisïau A, 1, 6 (a 7 os yn berthnasol).
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.