Council planning record

Construction of a lean-to extension to existing energy shed and retrospective consent for previously constructed wood chip store

Llyn Gwynant Campsite, Nant Gwynant. LL55 4NW

All consultations completeReference: NP2/11/715LEryri National Park

Last published check: 3 Oct 2026, 00:36. Check the council record for more recent changes.

Application location

Llyn Gwynant Campsite, Nant Gwynant. LL55 4NW

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Full
Received
23 Jan 2026
Validated
Not published
Determination deadline
19 Mar 2026
Local authority
Eryri National Park

Application overview

Construction of a lean-to extension to existing energy shed and retrospective consent for previously constructed wood chip store

Proposal details

Reference
NP2/11/715L
Alternative references
PP-14522554
Ward
Glaslyn ED
Parish
Beddgelert
UPRN
10070362005

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
E1Not publishedView
C2Not publishedView
C1Not publishedView
CSNot publishedView
LLNot publishedView
FFNot publishedView
S - CNC / NRW9 Feb 2026View
Rh.P1 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Dispatch date

    Published milestoneCouncil source
  6. Decision date

    Published milestoneCouncil source
  7. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan (01/12/25). Floor Plan 01 C1-01 Rev 2 (27/03/26). Elevations – Existing Building with Chip Store 02 C1-02 Rev 2 (27/03/26). Elevations – with proposed lean to and chip store 03 C1-03 Rev 2 (27/03/26). Design and Access Statement for lean to existing energy shed and existing chip store (27/03/26). Green Infrastructure Statement & Biodiversity Scheme (27/03/26).
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Location Plan (01/12/25). Floor Plan 01 C1-01 Rev 2 (27/03/26). Elevations – Existing Building with Chip Store 02 C1-02 Rev 2 (27/03/26). Elevations – with proposed lean to and chip store 03 C1-03 Rev 2 (27/03/26). Design and Access Statement for lean to existing energy shed and existing chip store (27/03/26). Green Infrastructure Statement & Biodiversity Scheme (27/03/26).
  5. The biodiversity enhancement measures outlined within “Green Infrastructure Statement & Biodiversity Scheme (27/03/26)” shall be implemented within the first available planting season and maintained thereafter.
  6. The design and materials for the proposed buildings (lean-to extension and chip store) shall be as set out within the submitted and hereby approved 'Design and Access Statement for lean to existing energy shed and existing chip store (27/03/26)' and as shown on the hereby approved plans.
  7. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  8. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  9. To identify the precise route of the pipeline in order to protect the (site specific)...in accordance with policy D of the Eryri Local Development Plan 2016-2031.
  10. Er mwyn pennu union lwybr y biblinell i ddiogelu'r (safle penodol)...yn unol â pholisi D o Gynllun Datblygu Lleol Eryri.
  11. To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales.
  12. To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials in accordance with Eryri Local Development Plan Policies and in particular Policies 1 & 6.
  13. Dylid gweithredu'r mesurau gwella bioamrywiaeth a amlinellir yn y “Datganiad Seilwaith Gwyrdd a Chynllun Bioamrywiaeth (27/03/26)” o fewn y tymor plannu cyntaf sydd ar gael a'u cynnal wedi hynny.
  14. Rhaid i'r dyluniad a'r deunyddiau ar gyfer yr adeiladau arfaethedig (estyniad croes a storfa sglodion) fod fel y'u nodir yn y 'Datganiad Dylunio a Mynediad ar gyfer sied ynni bresennol croes a storfa sglodion bresennol (27/03/26)' a gyflwynwyd ac a gymeradwywyd drwy hyn ac fel y dangosir ar y cynlluniau a gymeradwywyd drwy hyn.
  15. Er mwyn sicrhau gwelliant mewn bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru.
  16. Er mwyn sicrhau safon foddhaol o ran ymddangosiad y datblygiad a defnyddio deunyddiau adeiladu lleol priodol yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisïau 1 a 6.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.