The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Site Plan (27/11/2025) • Location Plan (26/11/2025) • Waste Processing Shed to House Ecobot and Cardboard Shredder 01 – C2-01 (10/02/2026) • Waste Processing Shed – Elevations 02 – C2-02 (10/02/2026) • Waste Processing Shed – 3D View with Ancillary Equipment including Ecobot 03 – C2-03 (10/02/2026) • Waste Processing Shed – Plan View with Ancillary Equipment including Ecobot 04 – C2-04 (10/02/2026) • Waste Processing Shed – Drainage Plan 05 – C2-05 (10/02/2026) • Y Bragdy Canopy – Floor Plan 01 – C3-01 (17/12/2025) • Y Bragdy Canopy – Proposed Elevations 02 C3-02 (17/12/2025) • Y Bragdy Canopy – Overview 04 C3-04 (17/12/2025) • Cegin Storage Area – 01 C1-01 (17/12/2025) • Cegin Storage Area – 02 C1-02 (17/12/2025) • Design and Access Statement (26/11/2025) • Green Infrastructure Statement (26/11/2025) • Green Plan landscaping and biodiversity at Llyn Gwynynt Campsite (25/11/2025)
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Site Plan (27/11/2025) • Location Plan (26/11/2025) • Waste Processing Shed to House Ecobot and Cardboard Shredder 01 – C2-01 (10/02/2026) • Waste Processing Shed – Elevations 02 – C2-02 (10/02/2026) • Waste Processing Shed – 3D View with Ancillary Equipment including Ecobot 03 – C2-03 (10/02/2026) • Waste Processing Shed – Plan View with Ancillary Equipment including Ecobot 04 – C2-04 (10/02/2026) • Waste Processing Shed – Drainage Plan 05 – C2-05 (10/02/2026) • Y Bragdy Canopy – Floor Plan 01 – C3-01 (17/12/2025) • Y Bragdy Canopy – Proposed Elevations 02 C3-02 (17/12/2025) • Y Bragdy Canopy – Overview 04 C3-04 (17/12/2025) • Cegin Storage Area – 01 C1-01 (17/12/2025) • Cegin Storage Area – 02 C1-02 (17/12/2025) • Design and Access Statement (26/11/2025) • Green Infrastructure Statement (26/11/2025) • Green Plan landscaping and biodiversity at Llyn Gwynynt Campsite (25/11/2025)
The biodiversity enhancement measures outlined within the submitted ‘Green Infrastructure Statement (26/11/2025)’ and ‘Green Plan landscaping and biodiversity at Llyn Gwynynt Campsite (25/11/2025)’ shall be implemented within the first available planting season and maintained thereafter
Dylid gweithredu'r mesurau gwella bioamrywiaeth a amlinellir yn y 'Green Infrastructure Statement (26/11/2025)' a gyflwynwyd a'r 'Green Plan landscaping and biodiversity at Llyn Gwynynt Campsite (25/11/2025)’ o fewn y tymor plannu cyntaf sydd ar gael a'u cynnal wedi hynn
The design and materials for the proposed buildings (Waste processing shed, cegin store room, the Cegin stretch canopy and the bragdy veranda) shall be as set out within the submitted and hereby approved ‘Design and Access Statement (26/11/2025)’ and as shown on the hereby approved plans
Rhaid i'r dyluniad a'r deunyddiau ar gyfer yr adeiladau arfaethedig (sied prosesu gwastraff, ystafell storio Cegin, canopi ymestynnol Cegin a feranda bragdy) fod fel y'u nodir yn y 'Design and Access Statement (26/11/2025)' a gyflwynwyd ac a gymeradwywyd drwy hyn ac fel y dangosir ar y cynlluniau a gymeradwywyd drwy hyn
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales
Er mwyn sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials in accordance with Eryri Local Development Plan Policies and in particular Policies 1 & 6
Er mwyn sicrhau safon foddhaol o ran ymddangosiad y datblygiad a defnyddio deunyddiau adeiladu lleol priodol yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisïau 1 a 6
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.