The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Location Plan 1873OSGLAS (25/11/2024) • Proposed Plans 1872 02B (Dated 26/03/2025) • Preliminary Ecological Appraisal, Cambrian Ecology, dated 24 October 2024 V3
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Location Plan 1873OSGLAS (25/11/2024) • Proposed Plans 1872 02B (Dyddiedig 26/03/2025) • Preliminary Ecological Appraisal, Cambrian Ecology, dyddiedig 24 October 2024 V3
The developer/applicant shall ensure that the mitigation and enhancement measures detailed in Sections 7 and 8 of the ‘Cambrian Ecology Preliminary Ecological Appraisal dated 24 October V3’ and shown on plan ‘1872 02B’ shall be implemented in accordance with the approved details. The proposed bee posts shall be installed within three months of the date of the completion of the development
Rhaid i'r datblygwr/ymgeisydd sicrhau bod y mesurau lliniaru a gwella a nodir yn Adrannau 7 ac 8 o'r 'Cambrian Ecology Preliminary Ecological Appraisal dated 24 October V3’ ac a ddangosir ar gynllun '1872 02B' yn cael eu gweithredu yn unol â'r manylion cymeradwy. Rhaid gosod y pyst gwenyn arfaethedig o fewn tri mis i ddyddiad cwblhau'r datblygiad
The roof of the extensions shall be covered in natural Welsh mineral slate or slates of the equivalent colour, texture and weathering characteristics as the slates on the main roof of the dwelling house and maintained thereafter.
Mae'n rhaid i do'r estyniadau gael ei orchuddio gyda llechi mwyn naturiol Cymreig, neu lechi gyda nodweddion lliw, gwead a hindreuliad tebyg fel y llechi ar brif do’r t"} ac wedyn ei gadw felly.
The external walls of the extensions, where shown as stone, shall be constructed throughout of local natural stone to match those of the existing building
Bydd rhaid i waliau allanol yr estyniadau, lle dangosir fel carreg, gael eu hadeiladu yn llwyr gyda cherrig naturiol lleol sy’n cydweddu a rhai'r adeilad presennol
No external lighting may be installed without the prior submission of a formal lighting plan written in accordance with document ‘Bats and Artificial Lighting at Night, Guidance Note 08/23’ by The Bat Conservation Trust and the Institution of Lighting Professionals. The lighting plan shall be submitted to and approved in writing by the Local Planning Authority by means of a formal application. The external lighting shall be installed in accordance with the approved details
Ni chaniateir gosod unrhyw oleuadau allanol heb gyflwyno cynllun goleuo ffurfiol ymlaen llaw a ysgrifennwyd yn unol â'r ddogfen 'Bats and Artificial Lighting at Night, Guidance Note 08/23’ gan 'The Bat Conservation Trust and the Institution of Lighting Professionals'. Rhaid cyflwyno'r cynllun goleuo i'r Awdurdod Cynllunio Lleol a'i gymeradwyo ganddo yn ysgrifenedig trwy gais ffurfiol. Rhaid gosod y goleuadau allanol yn unol â'r manylion cymeradwy
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To ensure that biodiversity enhancement is achieved in accordance with Eryri Local Development Plan Policies and in particular policies D, 1 and 2 and the requirement of part 6 of Planning Policy Wales
Sicrhau bod gwelliant bioamrywiaeth yn cael ei gyflawni yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol polisïau D, 1 a 2 a gofynion rhan 6 o Bolisi Cynllunio Cymru
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies 1, 6 and A.
Er mwyn sicrhau fod y datblygiad yn edrych yn foddhaol ac y defnyddir deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig polisïau 1, 6 ag A.
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies A, 1 & 6
Er mwyn sicrhau fod y datblygiad yn edrych yn foddhaol ac y defnyddir deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig polisïau A, 1 & 6
To ensure that the conservation objectives of the Meirionnydd Oakwoods and Bat Sites Special Area of Conservation (SAC) are not undermined in accordance with Eryri Local Development Plan Policies and in particular policies D, 1 and 2 and Regulation 63 of the Conservation of Habitats and Species Regulations 2017
Er mwyn sicrhau nad yw amcanion cadwraeth Ardal Cadwraeth Arbennig (ACA) Coedydd Derw a Safleoedd Ystlumod Meirionnydd yn cael eu tanseilio yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol polisïau D, 1 a 2 a Rheoliad 63 o Reoliadau Cadwraeth Cynefinoedd a Rhywogaethau 2017
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.