Council planning record

Hybrid Planning Application for the phased redevelopment for a) full planning permission for the demolition of existing buildings and structures, site wide remediation and the erection of five residential buildings (ranging between 8-12 storeys), new access arrangements, parking, hard and soft landscaping, open space and other associated works and b) severable outline planning permission, with all matters reserved except access, for the separate development demolition and re-provision of a Performing Arts Centre and Education building, hard and soft landscaping and other associated works

Land And Buildings At Former Gas Holder Station East Street Epsom Surrey

DecidedReference: 24/01107/FULEpsom and Ewell Borough Council

Application location

Land And Buildings At Former Gas Holder Station East Street Epsom Surrey

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
Not published
Validated
20 Aug 2024
Determination deadline
Not published
Local authority
Epsom and Ewell Borough Council

Application overview

Hybrid Planning Application for the phased redevelopment for a) full planning permission for the demolition of existing buildings and structures, site wide remediation and the erection of five residential buildings (ranging between 8-12 storeys), new access arrangements, parking, hard and soft landscaping, open space and other associated works and b) severable outline planning permission, with all matters reserved except access, for the separate development demolition and re-provision of a Performing Arts Centre and Education building, hard and soft landscaping and other associated works

Proposal details

Reference
24/01107/FUL
Ward
Town
Agent
Montagu Evans

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 182 of 182

DocumentPublishedAction
S106 AgreementLegal Agreement · PDF16 Jan 2026View
PEFULZDecision · PDF14 Jan 2026View
Draft Section 106Supporting Information · PDF17 Dec 2025View
Committee ReportDecision · PDF25 Apr 2025View
Committee Report Appendix 1Decision · PDF25 Apr 2025View
Committee Report UpdateDecision · PDF25 Apr 2025View
Active Travel England commentsConsultation response · PDF9 Apr 2025View
Highways Officer commentsConsultation response · PDF20 Mar 2025View
Highways Officer commentsConsultation response · PDF27 Feb 2025View
Thames Water commentsConsultation response · PDF12 Feb 2025View
Additional Thames Water commentsConsultation response · PDF12 Feb 2025View
Thames Water Capacity LetterCorrespondence · PDF10 Feb 2025View
Existing Ground Floor Site PlanPlans - Superseded · PDF24 Jan 2025View
Proposed Ground Floor Site PlanPlans - Superseded · PDF24 Jan 2025View
Proposed Block C Ground Floor PlanPlans - Superseded · PDF24 Jan 2025View
Proposed Block D Ground Floor PlanPlans - Superseded · PDF24 Jan 2025View
Proposed Block E Ground Floor PlanPlans - Superseded · PDF24 Jan 2025View
Proposed Block F Ground Floor PlanPlans - Superseded · PDF24 Jan 2025View
Proposed Block G Ground Floor PlanPlans - Superseded · PDF24 Jan 2025View
Site Plan Ground Floor PlanPlans · PDF24 Jan 2025View
Site Plan Typical Floor Plan 01,03,05,07Plans · PDF24 Jan 2025View
Site Plan Typical Floor Plan 02, 04,06Plans · PDF24 Jan 2025View
Site Plan Typical Floor Plan Level 8Plans · PDF24 Jan 2025View
Site Plan Typical Floor Plan Level 11Plans · PDF24 Jan 2025View
Site Plan Typical Floor Plan Level 12Plans · PDF24 Jan 2025View
Site Plan Roof PlanPlans · PDF24 Jan 2025View
Block C Ground Floor PlanPlans · PDF24 Jan 2025View
Block D Ground Floor PlanPlans · PDF24 Jan 2025View
Block E Ground Floor PlanPlans · PDF24 Jan 2025View
Block F Ground Floor PlanPlans · PDF24 Jan 2025View
Block G Ground Floor PlanPlans · PDF24 Jan 2025View
Block C Floor Plan 01,03.05 & 07Plans · PDF24 Jan 2025View
Block D Floor Plan 01-10Plans · PDF24 Jan 2025View
Block E Floor Plan 01-07Plans · PDF24 Jan 2025View
Block F Floor Plan 01-11Plans · PDF24 Jan 2025View
Block G Floor Plan Levels 01,03,05 & 07Plans · PDF24 Jan 2025View
Block C Floor Plan Levels 02, 04 & 06Plans · PDF24 Jan 2025View
Block G Floor Plan Levels 02, 04, 06 & 08Plans · PDF24 Jan 2025View
Block C Roof PlanPlans · PDF24 Jan 2025View
Block E Roof PlanPlans · PDF24 Jan 2025View
Block G Roof PlanPlans · PDF24 Jan 2025View
Block D Roof Terrace PlanPlans · PDF24 Jan 2025View
Block D Roof PlanPlans · PDF24 Jan 2025View
Block F Roof Terrace PlanPlans · PDF24 Jan 2025View
Block F Roof PlanPlans · PDF24 Jan 2025View
Highways Officer commentsConsultation response · PDF25 Nov 2024View
BNG Baseline PlanSupporting Information · PDF20 Nov 2024View
Ecological AssessmentSupporting Information · PDF20 Nov 2024View
Glare Occurance ReportSupporting Information · PDF20 Nov 2024View
Contaminated Land Officer commentsConsultation response · PDF23 Oct 2024View
Epsom Civic Society (Objection)Correspondence · PDF16 Oct 2024View
Grest Crested Newt Officer commentsConsultation response · PDF8 Oct 2024View
Network Rail commentsConsultation response · PDF30 Sept 2024View
Waste Officer commentsConsultation response · PDF27 Sept 2024View
Objection (Wormington)Correspondence · PDF24 Sept 2024View
Strategic Housing Manager commentsConsultation response · PDF23 Sept 2024View
Active Travel England commentsConsultation response · PDF23 Sept 2024View
Representation (Badger)Correspondence · PDF23 Sept 2024View
Support (Saunders)Correspondence · PDF22 Sept 2024View
Representation (Saunders)Correspondence · PDF22 Sept 2024View
Objection (Henman)Correspondence · PDF20 Sept 2024View
Objection (Stagecoach Pension Fund)Correspondence · PDF19 Sept 2024View
Objection (Alexander)Correspondence · PDF19 Sept 2024View
Thames Water commentsConsultation response · PDF18 Sept 2024View
Thames Water comments 1Consultation response · PDF18 Sept 2024View
Objection (Joris)Correspondence · PDF18 Sept 2024View
Objection (Coles)Correspondence · PDF18 Sept 2024View
Objection (Huebner)Correspondence · PDF18 Sept 2024View
Objection (Broder)Correspondence · PDF17 Sept 2024View
Objection (Sweeney)Correspondence · PDF17 Sept 2024View
Objection (Duval)Correspondence · PDF17 Sept 2024View
Objection (Jones)Correspondence · PDF16 Sept 2024View
Natural England commentsConsultation response · PDF13 Sept 2024View
Objection (Roberts)Correspondence · PDF10 Sept 2024View
Archaeological Officer commentsConsultation response · PDF6 Sept 2024View
Highways Officer commentsConsultation response · PDF6 Sept 2024View
Historic England commentsConsultation response · PDF5 Sept 2024View
Addendum to Statement of Community InvolvementSupporting Information · PDF5 Sept 2024View
Fire Safety Officer commentsConsultation response · PDF3 Sept 2024View
Waste Officer commentsConsultation response · PDF3 Sept 2024View
SuDS Officer commentsConsultation response · PDF2 Sept 2024View
Further Designing Out Crime Officer commentsConsultation response · PDF30 Aug 2024View
Designing Out Crime Officer commentsConsultation response · PDF29 Aug 2024View
Neighbour Consultation LetterCorrespondence · PDF28 Aug 2024View
NEIGHLISTNeighbour Notification List · PDF28 Aug 2024View
GUAR_EPlanning Notice · PDF28 Aug 2024View
MAJR-ESite Notice · PDF27 Aug 2024View
ACKNCorrespondence · PDF27 Aug 2024View
Application Form - without Personal dataApplication Form · PDF20 Aug 2024View
Schedule of Application DrawingsSupporting Information · PDF20 Aug 2024View
Accommodation ScheduleSupporting Information · PDF20 Aug 2024View
Arboricultural Impact AssessmentSupporting Information · PDF20 Aug 2024View
Design and Access Part 1Supporting Information · PDF20 Aug 2024View
Design and Access Part 2Supporting Information · PDF20 Aug 2024View
Design and Access Part 3Supporting Information · PDF20 Aug 2024View
Design and Access Part 4Supporting Information · PDF20 Aug 2024View
Design and Access Part 5Supporting Information · PDF20 Aug 2024View
Design and Access Part 6Supporting Information · PDF20 Aug 2024View
Planning StatementSupporting Information · PDF20 Aug 2024View
Heritage, Townscape and Visual Impact AssessmentSupporting Information · PDF20 Aug 2024View
Archaeology StatementSupporting Information · PDF20 Aug 2024View
Preliminary Ecological AppraisalSupporting Information · PDF20 Aug 2024View
Biodiversity Net GainSupporting Information · PDF20 Aug 2024View
Geotechnical and Geo-Environmental Desk Study Part 1Supporting Information · PDF20 Aug 2024View
Geotechnical and Geo-Environmental Desk Study Part 2Supporting Information · PDF20 Aug 2024View
Geotechnical and Geo-Environmental Desk Study Part 3Supporting Information · PDF20 Aug 2024View
Geotechnical and Geo-Environmental Desk Study Part 4Supporting Information · PDF20 Aug 2024View
Geotechnical and Geo-Environmental Desk Study Part 5Supporting Information · PDF20 Aug 2024View
Daylight and Sunlight ReportSupporting Information · PDF20 Aug 2024View
Daylight and Sunlight - Proposed Accommodation Light AssessmentSupporting Information · PDF20 Aug 2024View
Flood Risk Assessment Part 1Supporting Information · PDF20 Aug 2024View
Flood Risk Assessment Part 2Supporting Information · PDF20 Aug 2024View
Drainage StrategySupporting Information · PDF20 Aug 2024View
Drainage LayoutSupporting Information · PDF20 Aug 2024View
Air Quality AssessmentSupporting Information · PDF20 Aug 2024View
Energy and Overheating ReportSupporting Information · PDF20 Aug 2024View
Transport Assessment Part 1Supporting Information · PDF20 Aug 2024View
Transport Assessment Part 2Supporting Information · PDF20 Aug 2024View
Travel PlanSupporting Information · PDF20 Aug 2024View
Remediation Implementation and Construction Logistics PlanSupporting Information · PDF20 Aug 2024View
General Arrangement Plan - Phase 1Plans · PDF20 Aug 2024View
General Arrangement Plan - Roof Terrace - Phase 1Plans · PDF20 Aug 2024View
Statement of Community InvolvementSupporting Information · PDF20 Aug 2024View
Gateway One Fire StatementSupporting Information · PDF20 Aug 2024View
RIBA Stage 2 Fire StrategySupporting Information · PDF20 Aug 2024View
CIL Additional Information FormSupporting Information · PDF20 Aug 2024View
Existing First Floor Site PlanPlans · PDF20 Aug 2024View
Existing Site Section B-B and C-CPlans · PDF20 Aug 2024View
Existing Site Section G-GPlans · PDF20 Aug 2024View
Existing Site Section D-DPlans · PDF20 Aug 2024View
Existing Site Section F-FPlans · PDF20 Aug 2024View
Notice ScheduleSupporting Information · PDF20 Aug 2024View
Site Location PlanPlans · PDF20 Aug 2024View
Proposed Floor Level 08 Site PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Level 09 & 10 Site PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Level 11 Site PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Level 12 Site PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Block C Level 01, 03, 05 & 07 PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Block D Level 01-10 PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Block E Level 01-07 PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Block F Level 01-11Plans · PDF20 Aug 2024View
Proposed Floor Block G Level 01, 03, 05 & 07 PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Block C Level 02, 04 & 06 PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor Block G Level 2, 4 6 & 8 PlanPlans - Superseded · PDF20 Aug 2024View
Building Parameter PlanPlans · PDF20 Aug 2024View
Proposed Sections A-A & BBPlans · PDF20 Aug 2024View
Proposed Section C-CPlans · PDF20 Aug 2024View
Proposed Block C Elevation 1Plans · PDF20 Aug 2024View
Proposed Block D Elevation 1Plans · PDF20 Aug 2024View
Proposed Block E Elevation 1Plans · PDF20 Aug 2024View
Proposed Block F Elevation 1Plans · PDF20 Aug 2024View
Proposed Block G Elevation 1Plans · PDF20 Aug 2024View
Proposed Section D-D 1 and 2Plans · PDF20 Aug 2024View
Proposed Block C Elevation 2Plans · PDF20 Aug 2024View
Proposed Block D Elevation 2Plans · PDF20 Aug 2024View
Proposed Block E Elevation 2Plans · PDF20 Aug 2024View
Proposed Block F Elevation 2Plans · PDF20 Aug 2024View
Proposed Block G Elevation 2Plans · PDF20 Aug 2024View
Proposed Site E-E & F-F ElevationsPlans · PDF20 Aug 2024View
Proposed Block C Elevations 3 & 4Plans · PDF20 Aug 2024View
Proposed Block D Elevation 3Plans · PDF20 Aug 2024View
Proposed Block D Elevations 3 & 4Plans · PDF20 Aug 2024View
Proposed Block F Elevation 3Plans · PDF20 Aug 2024View
Proposed Block G Elevations 3 & 4Plans · PDF20 Aug 2024View
Proposed Block D Elevation 4Plans · PDF20 Aug 2024View
Proposed Block F Elevation 4Plans · PDF20 Aug 2024View
Cover LetterSupporting Information · PDF20 Aug 2024View
Proposed Floor 01, 03, 05 & 07 Site PlanPlans - Superseded · PDF20 Aug 2024View
Proposed Floor 02, 04 & 06 Site PlanPlans - Superseded · PDF20 Aug 2024View
Schedule of Application DocumentationSupporting Information · PDF20 Aug 2024View
Statutory Biodiversity MetricSupporting Information20 Aug 2024View
Condition Assessment Sheets - BNGSupporting Information20 Aug 2024View
Letter from AgentCorrespondence · PDF20 Aug 2024View
Acoustic AssessmentSupporting Information · PDF20 Aug 2024View
Proposed Roof Site PlanPlans - Superseded · PDF24 Jan 2024View
Proposed Roof Block C PlanPlans - Superseded · PDF24 Jan 2024View
Proposed Roof Block E PlanPlans - Superseded · PDF24 Jan 2024View
Proposed Roof Block G PlanPlans - Superseded · PDF24 Jan 2024View
Proposed Roof Terrace Block D PlanPlans - Superseded · PDF24 Jan 2024View
Proposed Roof Block D PlanPlans - Superseded · PDF24 Jan 2024View
Proposed Roof Terrace Block F PlanPlans - Superseded · PDF24 Jan 2024View
Proposed Roof Block F PlanPlans - Superseded · PDF24 Jan 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Validated Date

    Published milestoneCouncil source
  2. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Actual Committee Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
PEFULZ Committee Report Committee Report Appendix 1 Committee Report Update
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.