Council planning record

Partial discharge of Condition 23 (Surface Water Drainage Scheme) and Condition 24 (Foul Water Disposal) pursuant to outline application reference EDC/16/0004 relating to the Triangle Site.

Former Northfleet Cement Works The Shore Northfleet Gravesend Kent DA11 9AN

Awaiting decisionReference: EDC/25/0061Ebbsfleet Development Corporation

Last published check: 27 Sept 2026, 16:06. Check the council record for more recent changes.

Application location

Former Northfleet Cement Works The Shore Northfleet Gravesend Kent DA11 9AN

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Condition Discharge
Received
17 Apr 2025
Validated
23 Apr 2025
Determination deadline
18 Jun 2025
Local authority
Ebbsfleet Development Corporation

Application overview

Partial discharge of Condition 23 (Surface Water Drainage Scheme) and Condition 24 (Foul Water Disposal) pursuant to outline application reference EDC/16/0004 relating to the Triangle Site.

Proposal details

Reference
EDC/25/0061
Alternative references
PP-13952517
Ward
Northfleet And Springhead
Parish
Non-Parish Area
Agent
Savills

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 40 of 40

DocumentPublishedAction
ENVIRONMENT AGENCYConsultation Responses · PDF22 Sept 2025View
KCC LEAD LOCAL FLOOD AUTHORITYConsultation Responses · PDF22 Sept 2025View
SOUTHERN WATERConsultation Responses · PDF3 Sept 2025View
REVISED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE GENERAL ARRANGEMENT-SHEEDrawings · PDF2 Sept 2025View
REVISED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE GENERAL ARRANGEMENT-SHEEDrawings · PDF2 Sept 2025View
REVISED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE GENERAL ARRANGEMENT-SHEEDrawings · PDF2 Sept 2025View
TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CONSTRUCTION DETAILS-SHEDrawings · PDF2 Sept 2025View
TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CONSTRUCTION DETAILS-SHEDrawings · PDF2 Sept 2025View
TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CONSTRUCTION DETAILS-SHEDrawings · PDF2 Sept 2025View
TRIANGLE SITE WATER ATTENUATION INFILTRATION TANK CONSTRUCTION DETAILSDrawings · PDF2 Sept 2025View
REVISED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CATCHMENT AREAS-SHEET 1Drawings · PDF2 Sept 2025View
REVISED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CATCHMENT AREAS-SHEET 2Drawings · PDF2 Sept 2025View
REVISED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CATCHMENT AREAS-SHEET 3Drawings · PDF2 Sept 2025View
TRIANGLE SITE SURFACE WATER MANHOLE SCHEDULEDrawings · PDF2 Sept 2025View
TRIANGLE SITE FOUL WATER MANHOLE SCHEDULEDrawings · PDF2 Sept 2025View
HYDRAULIC CONDUCTIVITY - TESTING - IDOM 09.05.2024Supporting Documents · PDF2 Sept 2025View
NORTHFLEET MIXED USE DRAINAGE MAINTENANCE STRATEGY - REV ASupporting Documents · PDF2 Sept 2025View
NORTHFLEET MIXED USE FOUL DRAINAGE MAINTENANCE MANUALSupporting Documents · PDF2 Sept 2025View
TECHNICAL NOTE FOUL WATER DISPOSAL - RLTSupporting Documents · PDF2 Sept 2025View
SWM2A4D - DRAINAGE SIMULATION RESULTS - 04.07.2025Supporting Documents · PDF2 Sept 2025View
SWM4D36 - DRAINAGE SIMULATION RESULTS - 04.07.2025Supporting Documents · PDF2 Sept 2025View
SWM91FB - DRAINAGE SIMULATION RESULTS - 04.07.2025Supporting Documents · PDF2 Sept 2025View
SWMF5BF - DRAINAGE SIMULATION RESULTS - 04.07.2025Supporting Documents · PDF2 Sept 2025View
KCC LEAD LOCAL FLOOD AUTHORITYConsultation Responses · PDF15 May 2025View
ENVIRONMENT AGENCYConsultation Responses · PDF14 May 2025View
SOUTHERN WATERConsultation Responses · PDF8 May 2025View
SOUTHERN WATER - MAPConsultation Responses · PDF8 May 2025View
APPLICATIONFORMREDACTEDApplication Form · PDF17 Apr 2025View
SUPERSEDED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE GENERAL ARRANGEMENT-SDrawings · PDF17 Apr 2025View
SUPERSEDED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE GENERAL ARRANGEMENT-SDrawings · PDF17 Apr 2025View
SUPERSEDED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE GENERAL ARRANGEMENT-SDrawings · PDF17 Apr 2025View
SUPERSEDED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CATCHMENT AREAS-SHEETDrawings · PDF17 Apr 2025View
SUPERSEDED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CATCHMENT AREAS-SHEETDrawings · PDF17 Apr 2025View
SUPERSDED TRIANGLE SITE HARDSTANDING AND SURFACE DRAINAGE CATCHMENT AREAS-SHEETDrawings · PDF17 Apr 2025View
NETWORK 1 - DRAINAGE SIMULATION RESULTSSupporting Documents · PDF17 Apr 2025View
NETWORK 2 - DRAINAGE SIMULATION RESULTSSupporting Documents · PDF17 Apr 2025View
NETWORK 3 - DRAINAGE SIMULATION RESULTSSupporting Documents · PDF17 Apr 2025View
NETWORK 4 - DRAINAGE SIMULATION RESULTSSupporting Documents · PDF17 Apr 2025View
SK82-TRIANGLE SITE DRAINAGE NETWORKSDrawings · PDF17 Apr 2025View
COVERING LETTER - TRIANGLE VINEYARD PIT - DISCHARGE OF CONDITION 23 AND 24Supporting Documents · PDF17 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.