Council planning record

Variation of Condition 1 (Approved Drawings) of planning permission H/25/100267 (Proposed vehicular access from Grange Road for Existing Dwellings 48, 50 and 52 Grange Road together with gates and piers) to rotate proposed pedestrian gates 90 degrees to pier location.

50 GRANGE ROAD, NETLEY ABBEY, SOUTHAMPTON, SO31 5FE

Decided PermitReference: X/26/101407Eastleigh Borough Council

Application location

50 GRANGE ROAD, NETLEY ABBEY, SOUTHAMPTON, SO31 5FE

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Removal/variation of conditions
Received
15 May 2026
Validated
18 May 2026
Determination deadline
13 Jul 2026
Local authority
Eastleigh Borough Council

Application overview

Variation of Condition 1 (Approved Drawings) of planning permission H/25/100267 (Proposed vehicular access from Grange Road for Existing Dwellings 48, 50 and 52 Grange Road together with gates and piers) to rotate proposed pedestrian gates 90 degrees to pier location.

Proposal details

Reference
X/26/101407
Alternative references
14937707
Ward
Hamble & Netley Ward
Parish
Hound CP
Agent
CMC Design Architectural Services (Mr Chris McDermott)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
X_26_101407 PL_Final DecisionDecision Notice · PDF10 Jul 2026View
X_26_101407 Delegated Officer ReportOfficer Report · PDF10 Jul 2026View
Hound Parish Council responseConsultation Response · PDF16 Jun 2026View
Hampshire Highways responseConsultation Response · PDF11 Jun 2026View
Proposed Location, Site Layout and Gate Entrance PlansPlans · PDF15 May 2026View
Application Form RedactedApplication Form · PDF15 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
X_26_101407 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 1008.1/10/100, 1008/10/101 rev B and 1008/10/102. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years date of the grant of planning permission ref. H/25/100267. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the brick piers of the development hereby permitted shall match as closely as possible in type, colour and texture those used on the dwellinghouse to which the accesses relates. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. No use of the proposed vehicle access points shall start on site until the access, including the footway and/or verge crossing have been constructed and lines of sight of 2.0 metres by 43.0 metres are provided in accordance with the approved plans. The lines of sight splays shown on the approved plan numbered ‘1008/10/102’ shall be kept free of any obstruction exceeding 1 metre in height above the adjacent carriageway and shall be subsequently maintained so thereafter. Reason: To provide satisfactory access and in the interests of highway safety.
  5. Any gates provided shall be set back a distance of 6.0m from the edge of the carriageway of the adjoining highway. Reason: In the interests of highway safety.
  6. Before the end of the first planting season following the completion of the development hereby approved, ecological enhancements and soft landscaping shall be put in place and managed in accordance with the details set out in the ‘Landscape Management Plan and maintenance schedule’ (March 2026) and the Landscape Layout Plan and Biodiversity Net Improvement Plan as approved under DC/26/101073. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality, biodiversity and to safeguard the amenities of neighbouring residents.
  7. Note to Applicant: The applicant is reminded that, under the Conservation of Habitats and Species Regulations 2017 (as amended) and the Wildlife and Countryside Act 1981 (as amended), it is an offence to (amongst other things): deliberately capture, disturb, injure, or kill great crested newts; damage or destroy a breeding or resting place; intentionally or recklessly obstruct access to a resting or sheltering place. Planning permission for a development does not provide a defence against prosecution under this legislation. Should great crested newts be found at any stage of the development works, then all works should cease, and a professional and/or suitably qualified and experienced ecologist (or Natural England) should be contacted for advice on any special precautions before continuing, including the need for a licence.
  8. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.