Variation of Condition 1 (approved plans) of application F/24/97188 (Creation of headquarters for Hampshire Isle of Wight Air Ambulance (HIOWAA) and other healthcare services to include offices; the creation of a helipad; change of use and minor alterations to existing building to form a mixed use comprising B2, B8, E(e) and E(g); and other associated works.) approved on 30th July 2024. The proposed changes are to the fenestration to the rear elevation.
UNIT H, GEORGE CURL WAY, EASTLEIGH, SO18 2RX
Decided PermitReference: X/25/99432Eastleigh Borough Council
Last published check: 22 Sept 2026, 02:53. Check the council record for more recent changes.
Application timeline
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Variation of Condition 1 (approved plans) of application F/24/97188 (Creation of headquarters for Hampshire Isle of Wight Air Ambulance (HIOWAA) and other healthcare services to include offices; the creation of a helipad; change of use and minor alterations to existing building to form a mixed use comprising B2, B8, E(e) and E(g); and other associated works.) approved on 30th July 2024. The proposed changes are to the fenestration to the rear elevation.
Proposal details
Reference
X/25/99432
Alternative references
13976092 manual
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Agent
Southern Planning (Miss Alice Drew)
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be implemented in accordance with the following plans numbered: RR24-008-00-GA-247-000001, RR24-008-00-GA-247-000002, RR24-008-00- GA-247-000010, RR24-008-00-GA-247-000011, RR24-008-00-SE-247- 000001 (only in so far as it relates to the western elevation), 245_057 080 Rev 01, RR24-008-00-SE-247-000002, RR24-008-00-SE-247-000011, RR24- 008-00-SE-247-000012, E-AD-486.01A, E-AD-486.02A, and E-AD-486.03C. Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of the decision of application F/24/87188. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall not be occupied until a Landscape and Ecology Management Plan (LEMP) has been submitted to and approved in writing by the Local Planning Authority. The LEMP shall include detail in broad accordance to the submitted Biodiversity Net Gain Metric (V2) and Report (April 2024 V2). This plan shall include details of any habitat to be created/ retained on site; details and extent of new planting; details of maintenance regime and management responsibilities; details of proposed species enhancements; and details of treatment of site boundaries. The development shall be carried out in accordance with the approved details, which shall be carried out no later than the first planting season following the first occupation of the development, or first approval of the submitted LEMP, whichever is the later. In accordance with the provisions in the Environment Act (2021) the habitats must be maintained in the proposed condition for a minimum of 30 years after the completion of development. Reason: To ensure the protection biodiversity net gain features added to this site, of existing habitat features for wildlife found on the site wider enhancement of the nature conservation value of the site.
Cycle Parking shall be amended and provided in accordance with submitted F/24/97188 Discharge of Condition 4 Hampshire Isle of Wight Air Ambulance - 20 May 2025 rev 00 document prior to first use of the development hereby permitted, and thereafter retained in accordance with the approved details./ Reason: To ensure the adequate provision of onsite facilities.
The development hereby permitted shall be carried out and thereby operated in accordance with the submitted and hereby approved Wildlife Hazard Management Airside Operational Instruction (AOI) 15 (v3.3)(February 2024) but in respect of Southampton Airport and AOI 019 Wildlife Hazard Control document (dated 25th September 2020 – review date 30 June 2024)(SIAL 001/20). Reason: To minimise the development’s attractiveness to birds which could endanger the safe movement of aircraft and the operation of Southampton Airport.
The development hereby permitted shall not be occupied until full details of soft and water landscaping works have been submitted to and approved in writing by the Local Planning Authority in consultation with Southampton Airport. Details must comply with Advice Note 3 – Wildlife Hazards (available at https://www.aoa.org.uk/policycampaigns/operations-safety/). These details shall include: • any earthworks • grassed areas • the species, number and spacing of trees and shrubs • details of any water features • drainage details including SUDS - a timetable for completion of the works, which shall be no later than the first planting season following the first occupation. Development shall take place in accordance with the approved details. No subsequent alterations to the approved landscaping scheme are to take place.. Reason: In the interests of aerodrome safeguarding.
Before development commences details of the permanent lighting scheme(s) for the development shall be submitted to the Local Planning Authority for their written approval in consultation with Southampton Airport. Lighting schemes required during construction and for the completed development shall be of a flat glass, full cut off design, mounted horizontally, and shall ensure that there is no light spill above the horizontal. Development shall take place in accordance with the approved details. Reason: In the interests of aerodrome safeguarding where the development is close to the aerodrome and/or aircraft taking off from or landing.
No development shall take place until Southampton Airport and the Civil Aviation Authority (CAA) have approved the development plans and the appropriate stage of the CAP 791 (procedures for changes to aerodrome infrastructure) has been completed to the satisfaction of both the airport and the CAA. Reason: In the interests of aerodrome safeguarding.
Prior to first operation, details of the measures taken to intercept fuel spillage on site, including a schedule for installation, shall be submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details in accordance with the approved schedule for installation. Reason: To ensure the proposal would not have potential for significant pollution to land or surface water.
The helicopter operating from the site shall be restricted to one Airbus EC135 T3, except when unavailable due maintenance needs or in emergencies. In these circumstances, a Eurocopter EC135 T2+ helicopter or an Airbus H145 D2 helicopter may operate from the site. In any event, only one helicopter shall be operational from the site at any one time. Reason: To protect the amenities of the neighbouring commercial units and residential dwellings in accordance with policy DM8 of the Eastleigh Borough Local Plan 2016 – 2036.
No building or structure of the development hereby permitted shall exceed the height of the current ‘htec’ building and in any event the final height of any structure must be approved by Southampton Airport. Reason: In the interests of aerodrome safeguarding.
No existing individual trees, shrubs or stands of trees and shrubs on the application site and/or no trees and shrubs planted on the application site as part of the approved landscaping scheme shall be permitted without approval from Southampton Airport. Reason: In the interests of aerodrome safeguarding.
The development hereby approved shall follow the recommendations of the submitted BREEAM Pre-Assessment (dated March 2024), and within 12 months of first use of the development, a BREEAM ‘very good’ final stage certificate/ a final Non-Domestic Building Energy Performance Certificate shall be submitted to the Local Planning Authority, demonstrating that the completed development has achieved a minimum BREEAM ‘very good’ / ‘B’ energy performance rating. Reason: To ensure the development meets the general principles of the adopted Supplementary Planning Document ‘Environmentally Sustainable Development’.
The development hereby approved shall be used only for the purposes of general industrial, storage and distribution, provision of medical or health services, offices, research & development, and industrial processes (Classes B2, B8, E(e) and E(g)) of the Schedule to the Town and Country Planning [Use Classes] Order 1987 and The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020, [or in any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification] and for no other purposes. Reason: In the interests of highway safety and local amenity.
The development hereby approved shall accord in full to the submitted Noise Impact Assessment (ref C11045/NIA/1.5a), including Section 5 (mitigation). Reason: To ensure suitable management of the proposed use
Note to Applicant: For further information on lighting near an aerodrome please refer to Advice Note 2 - Lighting (available at https://www.aoa.org.uk/policy-campaigns/operations-safety/).
Note to Applicant: This planning permission does not convey the right for the development to encroach over, under or on land, which is not within your ownership, without the consent of the landowner.
Note to Applicant: Given the nature of the proposed development it is possible that a crane may be required during its construction. We would, therefore, draw the applicant’s attention to the requirement within the British Standard Code of Practice for the safe use of Cranes, for crane operators to consult the aerodrome before erecting a crane in close proximity to an aerodrome. This is explained further in Advice Note 4 – Cranes (available at https://www.aoa.org.uk/policycampaigns/operations-safety/).
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (Dec 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Environment Act 2021 The development shall accord in full to the biodiversity gain plan (ref April 2024 V2) submitted and approved by the Local Planning Authority under application F/24/97188. Reason: To accord with the Environment Act 2021, Schedule 14
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.