ApprovedCouncil status: Decided Permit Variation

Variation of conditions 16 & 17 of planning permission F/14/74922 to meet code level 4 of the code for sustainable homes for water and energy only

ROMANY WAY, HEATH HOUSE LANE, HEDGE END, SOUTHAMPTON, SO30 0LB

Eastleigh Borough CouncilReference X/16/78095Removal/variation of conditions

Last published check: 13 Nov 2026, 04:46. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 13 Nov 2026, 04:46 (UK)

  1. DoneReceived23 Feb 2016
  2. DoneValidated23 Feb 2016
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date19 Apr 2016
  5. DecidedPermit Variation12 Apr 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Removal/variation of conditions
Ward
Bursledon and Old Netley
Parish
Bursledon CP
Documents
10 published

Proposal

Variation of conditions 16 & 17 of planning permission F/14/74922 to meet code level 4 of the code for sustainable homes for water and energy only

Reference
X/16/78095
Ward
Bursledon and Old Netley
Parish
Bursledon CP
Agent
Paul Thomas - WYG Planning & Environment

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Decision Notice (1719842)Decision Notice12 Apr 2016View
  • Officer Report (1719776)Officer Report12 Apr 2016View
  • Parish Response (1710509)Parish Response29 Mar 2016View
  • Supporting Documents (1688881)Supporting Documents19 Feb 2016View
  • Application Form (1688847)Application Form19 Feb 2016View
  • Supporting Documents (1688878)Supporting Documents19 Feb 2016View
  • Location Plan (1688851)Location Plan19 Feb 2016View
  • Supporting Documents (1688886)Supporting Documents19 Feb 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit Variation
Decision Notice (1719842)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: L01 & 501 Rev P4. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) With the exception of Conditions 16 & 17, the development hereby permitted shall comply with the conditions imposed on the grant of the planning permission reference F/14/74922 which was permitted on 19th December 2014. Reason: To secure properly planned development.
  3. (3) Prior to commencement, details of how the approved dwellings will achieve Code level 4 equivalent requirements for energy and water [or equivalent requirements that are set out in national legislation or policy], with reference to design stage SAP data and the BRE water calculator, as well as evidence that the relevant ESD requirements 2-8 inclusive of the Council’s adopted Environmentally Sustainable Development SPD are being met shall be submitted to, and approved in writing by, the Local Planning Authority. No dwelling shall be occupied until written confirmation thatthese works have been completed, and the ‘as built’ stage SAP data and a confirmation of the water calculation, has been submitted for that dwelling. Reason: To ensure the development meets the requirements of the national technical standards for energy and water consumption and the Council’s adopted environmentally Sustainable Development SPD in residential development.

    (3) Energy and water requirements for new dwellings

  4. Note to Applicant: The information submitted with this application is considered sufficient to meet the requirements of Condition 3 above and as such no further information needs to be submitted.
  5. Note to Applicant: It is considered that, subject to compliance with the conditions and any obligations attached to this permission, the proposed development is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety and it is in accordance with the policies and proposals of the development plan, comprising the Eastleigh Borough Local Plan Review 2001-2011, and after due regard to all other relevant material considerations including the National Planning Policy Framework and the Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014 the Submitted Local Plan comprising: the Revised Pre-submission Eastleigh Borough Local Plan 2011 - 2029, published February 2014; and the Schedule of Proposed Minor Changes, submitted to the Secretary of State in July 2014’, the local planning authority is of the opinion that permission should be granted. The following development plan saved policies and emerging draft local plan policies are relevant to this decision and the conditions attached to it: Eastleigh Borough Local Plan Review [2001-2011], saved Policy 34.ES Submitted Eastleigh Borough Local Plan 2011 - 2029, July 2014, the Submitted Local Plan, Policy DM2 In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.