1no. Oak - Reduce in height by up to 2 meters and reduce lateral growth on northern side of high trees by up to 2 meters. The tree is in a cycle of pruning. The tree works is being carried out back to previous growth points to provide adequate clearance of the building.
19 MALLOW ROAD, HEDGE END, SOUTHAMPTON, SO30 4TQ
Decided Part Consent Part Refuse TreesReference: T/26/100763Eastleigh Borough Council
Last published check: 14 Oct 2026, 04:29. Check the council record for more recent changes.
Application timeline
Council milestones and published deadlines. A deadline passing does not confirm a decision.
1no. Oak - Reduce in height by up to 2 meters and reduce lateral growth on northern side of high trees by up to 2 meters. The tree is in a cycle of pruning. The tree works is being carried out back to previous growth points to provide adequate clearance of the building.
Proposal details
Reference
T/26/100763
Alternative references
14626099
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
WGS Tree Services (Wesley Skinner)
Sign in to view all collected council fields and recorded changes.
The Council REFUSES CONSENT for the following work: 2 no. oak – Reduce in height by 2m. REASON FOR REFUSAL: The application proposes to reduce the height of both trees on the basis that they are in a cycle of pruning. There are no obvious reduction points in the upper parts of either tree. As such, there is no cycle of pruning that would justify a reduction in height. Such work would diminish their current natural and flowing outline therefore would be detrimental to public, visual amenity.
CONSENT TO: 2 no. oak – Reduce lateral growth on northern side of trees, by approximately 2m back to previous reduction points. The consented work is subject to the following condition:
The tree works hereby consented shall be completed within 2 years of the date of this permission and shall be carried out in accordance with the approved details and to British Standard for Tree Work BS3998:2010. Reason: To ensure consented work is carried out in accordance with good arboricultural practice.
Note to Applicant: It is considered that, subject to compliance with the conditions attached to this permission, the proposed tree works are acceptable because they will not materially harm the character of the area, the amenity of neighbours or highway safety, and are in accordance with the policies and proposals of the development plan and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. Note to applicant: All works hereby consented should be carried out by a suitably qualified and insured tree surgeon. A copy of the decision notice should be given to the Tree Surgeon. Note to applicant: Deadwood may be removed at any time without an application. Note to applicant: Please be advised that the Wildlife and Countryside Act 1981 as amended, the Countryside and Rights of Way Act 2000 and the Conservation (Natural Habitats) Regulations 1994 protect ALL wild birds, their nests (whether in use or being built) and eggs and other wild animals including bats and their roosts in or adjacent to trees. Note to applicant: The granting of consent does not give the applicant or their agent a legal right to enter land without the owner’s permission. Note to applicant: Advice regarding overhead utilities should be sought with the relevant service provider prior to commencing works. Note to applicant: Please follow current recommended Bio-security measures - Further advice can be found at https://www.trees.org.uk/News-Blog/News/Biosecurity-in-Arboriculture-and-Urban-Forestry-Po Note to applicant: Deadwood within trees provides a rich and important habitat; it can be a natural part of the trees life cycle. Consider retention of deadwood where it is safe to do so.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.