1 no. Oak (T1)- Suppressed Oak, reduce lateral crown growth by 1/2m to suitable growth points. Reduce height of crown by approximately 2/3m to suitable growth points. 1 no. Oak (T2) - Reduce 1 x lowest lateral limb by 2/3m to suitable growth points. 1 no. Oak (T3) - Reduce 1 x lowest lateral limb by 2/3m to suitable growth points.
27 ASCOT ROAD, HORTON HEATH, EASTLEIGH, SO50 7JP
Decided Consent To Tree Works ForReference: T/23/94901Eastleigh Borough Council
Last published check: 8 Oct 2026, 03:13. Check the council record for more recent changes.
Application location
27 ASCOT ROAD, HORTON HEATH, EASTLEIGH, SO50 7JP
This record has no verified map location.
Application summary
Status
Decided Consent To Tree Works For
Application type
Consent under Tree Preservation Orders
Received
20 Mar 2023
Validated
27 Mar 2023
Determination deadline
22 May 2023
Local authority
Eastleigh Borough Council
Application overview
1 no. Oak (T1)- Suppressed Oak, reduce lateral crown growth by 1/2m to suitable growth points. Reduce height of crown by approximately 2/3m to suitable growth points. 1 no. Oak (T2) - Reduce 1 x lowest lateral limb by 2/3m to suitable growth points. 1 no. Oak (T3) - Reduce 1 x lowest lateral limb by 2/3m to suitable growth points.
Proposal details
Reference
T/23/94901
Alternative references
12028075
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
Shawyers (Mr Martin Shawyer)
Sign in to view all collected council fields and recorded changes.
CONSENT TO: 1 no. Oak (T1)- Suppressed Oak, reduce lateral crown growth by 1/2m to suitable growth points. Reduce height of crown by approximately 2/3m to suitable growth points. 1 no. Oak (T2) - Reduce 1 x lowest lateral limb by 2/3m to suitable growth points. 1 no. Oak (T3) - Reduce 1 x lowest lateral limb by 2/3m to suitable growth points. Cuts sizes must not exceed 50mm in diameter.
The tree works hereby consented shall be completed within 2 years of the date of this permission and shall be carried out in accordance with the approved details and to British Standard for Tree Work BS3998:2010
Note to Applicant: It is considered that, subject to compliance with the conditions attached to this permission, the proposed tree works are acceptable because they will not materially harm the character of the area, the amenity of neighbours or highway safety, and are in accordance with the policies and proposals of the development plan and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. Note to applicant: All works hereby consented should be carried out by a suitably qualified and insured tree surgeon. A copy of the decision notice should be given to the Tree Surgeon. Note to applicant: Deadwood may be removed at any time without an application. Note to applicant: Please be advised that the Wildlife and Countryside Act 1981 as amended, the Countryside and Rights of Way Act 2000 and the Conservation (Natural Habitats) Regulations 1994 protect ALL wild birds, their nests (whether in use or being built) and eggs and other wild animals including bats and their roosts in or adjacent to trees. Note to applicant: The granting of consent does not give the applicant or their agent a legal right to enter land without the owner’s permission. Note to applicant: Advice regarding overhead utilities should be sought with the relevant service provider prior to commencing works. Note to applicant: Please follow current recommended Bio-security measures - Further advice can be found at https://www.trees.org.uk/News-Blog/News/Biosecurity-in-Arboriculture-and-Urban-Forestry-Po Note to applicant: Deadwood within trees provides a rich and important habitat; it can be a natural part of the trees life cycle. Consider retention of deadwood where it is safe to do so.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.