Note to Applicant: The proposed felling of Oak(1) would result in an adverse impact upon the visual amenity and wildlife of the surrounding area.
Consent to- 1 x Oak (2) - Fell
Note to Applicant: It is considered that, subject to compliance with the conditions attached to this permission, the proposed tree work is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and is in accordance with the policies and proposals of the development plan and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted. Note to applicant: All works hereby consented should be carried out by a suitably qualified tree surgeon. A copy of the decision notice should be given to the Tree Surgeon.
(1) The tree works hereby consented shall be completed within 2 years of the date of this permission and shall be carried out in accordance with the approved details and to British Standard for Tree Work BS3998:2010. Reason: To preserve the special amenity value of the tree.
(2)Details of replacement tree planting (including quantity, species, position, size and a time frame for completion) must be submitted and approved prior to commencement of tree works. Tree planting must take place as soon as possible after the tree removal and no later than the start of the following planting season (October - April). The replacement tree shall be 1 x English Oak and be of a minimum of 1.5m in height.
For a period of no less than 5 years after planting, any trees which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.