Crown lift various trees to a height of 5.2m (area 1) Removal of T1 (no replacement necessary) and the removal of rubbing branch only from T2 back to source. (1) The works hereby approved must be completed within a period of two years beginning with the date on which this consent is granted. Reason: To enable the Local Planning Authority to review the situation in the light of changed circumstances. (2) All work carried out must be in accordance with the 2010 British Standard for Tree Works BS3998. Reason: To safeguard the health and amenity of the trees. (3) The crown lift in Area 1 must not remove any branches greater than 5cm in diameter. Reason: In the future interests of the health of the trees. Note to Applicant: It is considered that, subject to compliance with the conditions attached to this permission, the proposed tree work is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and is in accordance with the policies and proposals of the development plan and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted: Note to applicant: All works hereby consented should be carried out by a suitably qualified tree surgeon. Note to applicant: Copy of Decision Notice for Tree Surgeon. And hereby REFUSE CONSENT for the following: Felling of Beech Tree (T2) For the following reasons: The proposed works are considered unjustified and will be of detriment to the health and appearance of the trees. The works would therefore result in an adverse impact upon the visual amenity, ecology, wildlife, shelter and screening of the surrounding area.
() Works to be started within 2 years and carried out to British Standard
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.