ApprovedCouncil status: Decided Consent To Tree Works For
T1 Crown lift to 6m from ground level by removing epicormic growth under 50mm diameter. T2 Crown lift to 6m from ground level by removing secondary lateral growth and epicormic growth under 50mm in diameter. T3 - Crown lift to 6m from ground level by removing secondary lateral growth and epicormic growth under 50mm in diameter. Remove lowest reduced lateral over rear garden.
T1 Crown lift to 6m from ground level by removing epicormic growth under 50mm diameter. T2 Crown lift to 6m from ground level by removing secondary lateral growth and epicormic growth under 50mm in diameter. T3 - Crown lift to 6m from ground level by removing secondary lateral growth and epicormic growth under 50mm in diameter. Remove lowest reduced lateral over rear garden.
Reference
T/12/70313
Ward
Fair Oak and Horton Heath
Parish
Fair Oak and Horton Heath CP
Agent
Mr Martin Shawyer
Sign in to view all collected council fields and recorded changes.
(1) The works hereby approved must be completed within a period of two years beginning with the date on which this consent is granted. Reason: To enable the Local Planning Authority to review the situation in the light of changed circumstances. (2) All work carried out must be in accordance with the 2010 British Standard for Tree Works BS3998. Reason: To safeguard the health and amenity of the trees. Note to applicant: All works hereby consented should be carried out by a suitably qualified tree surgeon. Note to applicant: Copy of Decision Notice for Tree Surgeon.
(1) Works completed within 2 years
Note to Applicant: It is considered that, subject to compliance with the conditions attached to this permission, the proposed tree work is acceptable because it will not materially harm the character of the area, the amenity of neighbours or highway safety, and is in accordance with the policies and proposals of the development plan and after due regard to all other relevant material considerations the local planning authority is of the opinion that permission should be granted.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.