Council planning record

Submission of Reserved Matters relating to Layout, Scale, Appearance, and Landscaping pursuant to Condition 4 (RM Requirements) of Outline Planning Permission O/20/89498 for the erection of 357 dwellings within Phases 13A and 14 (The Holme and Homestal), with associated public open space, landscaping, and cycle and vehicular parking, to include details relevant to the following conditions: • Condition 16 (Arb Assessment) • Condition 21 (Design Code Compliance) • Condition 25 (Refuse) • Condition 31 (Higher Access Standards) • Condition 32 (Internal Space Standards) • Condition 35 (Built Heritage) • Condition 58 (Flood Mitigation) • Condition 61 (SUDs) • Condition 64 (EMMP) • Condition 71 (BNG) • Condition 72 (New Forest Protected Sites Mitigation) • Condition 76 (Nutrient Neutrality) (Outline application subject to Environmental Impact Assessment) (amended description)

Land West of Burnetts Lane, Horton Heath, Eastleigh, SO30 2HH

Decided Approve The Reserved MattersReference: RM/25/100615Eastleigh Borough Council

Last published check: 14 Oct 2026, 06:03. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Approve The Reserved Matters
Application type
Reserved matters
Received
12 Dec 2025
Validated
22 Dec 2025
Determination deadline
30 Apr 2026
Local authority
Eastleigh Borough Council

Application overview

Submission of Reserved Matters relating to Layout, Scale, Appearance, and Landscaping pursuant to Condition 4 (RM Requirements) of Outline Planning Permission O/20/89498 for the erection of 357 dwellings within Phases 13A and 14 (The Holme and Homestal), with associated public open space, landscaping, and cycle and vehicular parking, to include details relevant to the following conditions: • Condition 16 (Arb Assessment) • Condition 21 (Design Code Compliance) • Condition 25 (Refuse) • Condition 31 (Higher Access Standards) • Condition 32 (Internal Space Standards) • Condition 35 (Built Heritage) • Condition 58 (Flood Mitigation) • Condition 61 (SUDs) • Condition 64 (EMMP) • Condition 71 (BNG) • Condition 72 (New Forest Protected Sites Mitigation) • Condition 76 (Nutrient Neutrality) (Outline application subject to Environmental Impact Assessment) (amended description)

Proposal details

Reference
RM/25/100615
Alternative references
14551435
Agent
Stantec UK Limited (Pete Tanner)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land West of Burnetts Lane, Horton Heath, Eastleigh, SO30 2HH

This record has no verified map location.

Documents 240 of 240

DocumentPublishedAction
Committee ReportOfficer Report · PDF1 May 2026View
Committee Update Paper HHDMC 23 April 2026 · PDF1 May 2026View
Decision NoticeDecision Notice · PDF29 Apr 2026View
Conditions letter The Holme and Homestal One Horton Heath 280426Discharge Of Conditions Decision Notice · PDF28 Apr 2026View
Lead Local Flood Authority final commentsConsultation Response · PDF23 Apr 2026View
Drainage Update from applicant consultant · PDF23 Apr 2026View
Amended Landscape General Arrangement Plan Homestal · PDF21 Apr 2026View
Amended Landscape General Arrangement Plan The Holme · PDF21 Apr 2026View
Applicant further response to LLFA queries · PDF15 Apr 2026View
Drawing List, 9 April 20269 Apr 2026View
Lead Local Flood Authority further comments April 2026 (1)_RedactedConsultation Response · PDF8 Apr 2026View
Further Landscape Officer comments April 2026Consultation Response · PDF7 Apr 2026View
Amended Planting Plan Area 2 HomestalLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Sheet 4 HomestalLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Area 4 The HolmeLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Sheet 4 The HolmeLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Sheet 3 HomestalLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Overview Plan HomestalLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Homestal Area 1Landscape Plan · PDF2 Apr 2026View
Amended Planting Plan Overview The Holme Area 2Landscape Plan · PDF2 Apr 2026View
Amended Planting Plan Sheet 1 The HolmeLandscape Plan · PDF2 Apr 2026View
Amended Planting Schedule The HolmeLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Area 6 HomestalLandscape Plan · PDF2 Apr 2026View
Amended Tree Planting Plan HomestalLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Sheet 3 The HolmeLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Overview The Holme Area 1Landscape Plan · PDF2 Apr 2026View
Amended Planting Plan Sheet 2 HomestalLandscape Plan · PDF2 Apr 2026View
Amended Tree Planting Plan The HolmeLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Homestal Area 3Landscape Plan · PDF2 Apr 2026View
Amended Tree Planting Schedule Holme and HomestalLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Overview The HolmeLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan The Holme Area 5Landscape Plan · PDF2 Apr 2026View
Amended Hard Landscape Plan Homestal -Landscape Plan · PDF2 Apr 2026View
Amended Planting Plan Sheet 2 The HolmeLandscape Plan · PDF2 Apr 2026View
Amended Planting specification HomestalLandscape Plan · PDF2 Apr 2026View
Amended Planting Plan Homestal Sheet 2Landscape Plan · PDF2 Apr 2026View
H&H Swept Path Analysis (3.5T Panel Van)Supporting Documents · PDF30 Mar 2026View
HCC HighwaysConsultation Response · PDF30 Mar 2026View
Urban Design further comments March 2026Consultation Response · PDF26 Mar 2026View
Further Landscape Officer comments March 2026Consultation Response · PDF25 Mar 2026View
Hampshire Highways consultation response March 2026Consultation Response · PDF24 Mar 2026View
Amended Proposed Accommodation & House Types Plan · PDF20 Mar 2026View
Amended The Homestal Zone 01 Plan · PDF20 Mar 2026View
Amended The Homestal Zone 03 Plan · PDF20 Mar 2026View
Amended The Homestal Zone 05 Plan · PDF20 Mar 2026View
Amended The Holme Zone 05 Plan · PDF20 Mar 2026View
Amended The Homestal Zone 02 Plan · PDF20 Mar 2026View
Amended The Homestal Zone 04 Plan · PDF20 Mar 2026View
Amended The Holme Zone 01 Plan · PDF20 Mar 2026View
Amended The Holme Zone 06 Plan · PDF20 Mar 2026View
Amended The Holme Zone 04 Plan · PDF20 Mar 2026View
Amended The Holme Zone 02 Plan · PDF20 Mar 2026View
Amended The Holme Zone 03 Plan · PDF20 Mar 2026View
Amended The Homestal Zone 06 Plan · PDF20 Mar 2026View
Agent summary of design changes The Holme and Homestal · PDF20 Mar 2026View
Amended The Homestal - Green Spine West Street Elevation · PDF19 Mar 2026View
Amended The Homestal - Green Spine East Street Elevations · PDF19 Mar 2026View
Amended The Homestal - Greenway Street Elevations · PDF19 Mar 2026View
Design and Access Statement ADDENDUM-P1 · PDF19 Mar 2026View
Amended The Holme - Gateway Road Street Elevations · PDF19 Mar 2026View
Amended The Holme - Tertiary Road Street Elevations · PDF19 Mar 2026View
Amended Parcel Plan · PDF19 Mar 2026View
Amended House Type JJ 4B6P Plans & Elevations · PDF19 Mar 2026View
Amended The Holme - Spine Road Street Elevations · PDF19 Mar 2026View
Amended The Homestal - Eastern Edge · PDF19 Mar 2026View
Amended The Homestal - Western Edge · PDF19 Mar 2026View
Amended The Homestal - Northern Edge · PDF19 Mar 2026View
Amended The Homestal - Northern Edge 2 · PDF19 Mar 2026View
Amended Proposed Site Plan · PDF19 Mar 2026View
Amended The Holme - Foxwood Road Street Elevations · PDF19 Mar 2026View
Amended The Homestal - Southern Edge · PDF19 Mar 2026View
Amended The Homestal - Tertiary Road Street Elevations · PDF19 Mar 2026View
Amended Draft Landscape Boundary Treatment Homestal STA-14-ZZ-DR-L-2202 B · PDF17 Mar 2026View
Amended Hard Landscape The Holme STA-13-ZZ-DR-L-2103 B · PDF17 Mar 2026View
Amended Planting Plan Homestal Sheet 1 STA-14-ZZ-DR-L-2511 C · PDF17 Mar 2026View
Summary of Landscape Changes The Holme and Homestal March 26 · PDF17 Mar 2026View
Amended Draft Landscape Boundary Treatments The Holme STA-13-ZZ-DR-L-2203 B · PDF17 Mar 2026View
SUPERSEDED Amended Planting Plan Homestal Sheet 3 STA-14-ZZ-DR-L-2513 C · PDF17 Mar 2026View
The H+H Highways Response Technical Note with Plans · PDF13 Mar 2026View
The H+H Highways Response Technical Note · PDF13 Mar 2026View
Applicant response to LLFA comments The Holme and Homestal and The Folds · PDF10 Mar 2026View
Updated Flood Risk Assessment and Surface Water Drainage Strategy Report H and H - RedactedFlood Risk Assessment · PDF10 Mar 2026View
Environment Agency further comments H and HConsultation Response · PDF26 Feb 2026View
Landscape Officer comments The Holme and HomestalConsultation Response · PDF20 Feb 2026View
Fair Oak Parish Council comments H and HConsultation Response · PDF10 Feb 2026View
Applicant response to Noise Comments Jan26 · PDF5 Feb 2026View
Ecology Repsonse 02.02.26 RM.25.100614Consultee Response · PDF5 Feb 2026View
Urban Design comments The Holme and HomestalConsultation Response · PDF4 Feb 2026View
Tree Officer commentsConsultee Response · PDF3 Feb 2026View
Applicant response to Environment Agency comments 30 Jan 26 · PDF30 Jan 2026View
Botley Parish Council commentsConsultation Response · PDF30 Jan 2026View
Highway Authority response Holme and HomestalConsultation Response · PDF29 Jan 2026View
NatureSpace Great Crested Newt responseConsultation Response · PDF27 Jan 2026View
REVISED Bat Survey Technical Note V4.0 · PDF23 Jan 2026View
Environmental Health contaminated land comments The Folds, Holme and HomestalConsultation Response · PDF15 Jan 2026View
Natural England response Holme and HomestalConsultation Response · PDF14 Jan 2026View
Heritage Consultant commentsConsultation Response · PDF14 Jan 2026View
Environmental Health comments on noise Holme and HomestalConsultation Response · PDF13 Jan 2026View
Active Travel England standing adviceConsultation Response · PDF13 Jan 2026View
Factual Ground Investigation Report - Parkside_compressed_REDACTEDSupporting Documents · PDF13 Jan 2026View
Hedge End Town Council commentsConsultation Response · PDF12 Jan 2026View
Consultation Response Letter from Hampshire and Isle of Wight ConstabularyConsultation Response · PDF8 Jan 2026View
Eastleigh Ramblers commentsConsultation Response · PDF6 Jan 2026View
Public Art Officer commentsConsultation Response · PDF6 Jan 2026View
County Archaeologist commentsConsultation Response · PDF6 Jan 2026View
Bat Survey Technical NoteSupporting Documents · PDF22 Dec 2025View
SUPERSEDED Planting Plan Sheet 2 Homestal · PDF18 Dec 2025View
SUPERSEDED Planting Plan Overview Plan Homestal · PDF18 Dec 2025View
Apartment 03 Elevations-P07 · PDF18 Dec 2025View
Apartment 05 Elevations-P07 · PDF18 Dec 2025View
SUPERSEDED The Homestal Zone 04 Plan-P05 · PDF18 Dec 2025View
House Type C 2B4P Plans & Elevations-P05 · PDF18 Dec 2025View
Apartment 03 Plans-P07 · PDF18 Dec 2025View
SUPERSEDED The Holme - Foxwood Road Street Elevations-P07 · PDF18 Dec 2025View
Apartment 01 & 06 Elevations-P07 · PDF18 Dec 2025View
SUPERSEDED Planting Plan: Overview Character Area 3 Homestal · PDF18 Dec 2025View
Apartment 04 Plans-P07 · PDF18 Dec 2025View
SUPERSEDED Planting Plan Sheet 3 Holme · PDF18 Dec 2025View
SUPERSEDED The Homestal Zone 02 Plan-P05 · PDF18 Dec 2025View
SUPERSEDED Planting Plan Sheet 4 Homestal · PDF18 Dec 2025View
SUPERSEDED Planting Plan Overview The Holme · PDF18 Dec 2025View
SUPERSEDED Landscape General Arrangement Homestal · PDF18 Dec 2025View
SUPERSEDED General Planting Specification Holme and Homestal · PDF18 Dec 2025View
The Holme Zone 06 Plan-P05 · PDF18 Dec 2025View
SUPERSEDED Planting Plant Overview Plan Holme · PDF18 Dec 2025View
SUPERSEDED Planting Plan Sheet 3 Homestal · PDF18 Dec 2025View
SUPERSEDED The Homestal - South Elevation-P07 · PDF18 Dec 2025View
SUPERSEDED Planting Plan: Overview Plan Holme · PDF18 Dec 2025View
SUPERSEDED Parcel Plan-P03 · PDF18 Dec 2025View
SUPERSEDED Proposed Site Plan-P07Site Layout Plan · PDF18 Dec 2025View
SUPERSEDED The Homestal Zone 03 Plan-P05 · PDF18 Dec 2025View
SUPERSEDED The Holme Zone 05 Plan-P05 · PDF18 Dec 2025View
SUPERSEDED House Type JJ 4B6P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED The Homestal - West Elevation-P07 · PDF18 Dec 2025View
SUPERSEDED Planting Plan Sheet 4 Holme · PDF18 Dec 2025View
SUPERSEDED Planting Plan Homestal · PDF18 Dec 2025View
SUPERSEDED Hard Landscape Holme · PDF18 Dec 2025View
Apartment 05 Typical Upper Floor Plans-P07 · PDF18 Dec 2025View
RM BoundariesPlan · PDF18 Dec 2025View
SUPERSEDED Proposed Accommodation & House Types Plan-P07 · PDF18 Dec 2025View
SUPERSEDED The Homestal - North Elevation 2-P02 · PDF18 Dec 2025View
House Type F 3B5P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED Planting Plan: Overview Plan Holme · PDF18 Dec 2025View
-House Type LL 3-4 4B7P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED Planting Plan Overview Plan Holme · PDF18 Dec 2025View
SUPERSEDED The Homestal - Tertiary Road Street Elevations-P07 · PDF18 Dec 2025View
SUPERSEDED The Holme - Gateway Road Street Elevations-P07 · PDF18 Dec 2025View
SUPERSEDED Planting Plan Overview Plan Homestal · PDF18 Dec 2025View
House Type M 1B2P & N2B4P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED Planting Plan Sheet 2 Holme · PDF18 Dec 2025View
SUPERSEDED Planting Plan: Overview Plan Holme · PDF18 Dec 2025View
Garages and Bin Store Plans & Elevations-P03 · PDF18 Dec 2025View
SUPERSEDED Planting Plan Sheet 1 · PDF18 Dec 2025View
SUPERSEDED Landscape Boundary Treatments Holme · PDF18 Dec 2025View
Apartment 02 Plans-P07 · PDF18 Dec 2025View
House Type NN 1-5 3B6P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED Planting Plan: Overview Plan Character Area 2 Homestal · PDF18 Dec 2025View
House Type LL 1-2 4B7P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED The Homestal Zone 05 Plan-P05 · PDF18 Dec 2025View
House Type NN 6-7 3B6P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED Landscape General Arrangement Holme · PDF18 Dec 2025View
SUPERSEDED The Holme Zone 01 Plan-P04 · PDF18 Dec 2025View
SUPERSEDED Planting Plan: Overview Plan Character Area 6 Homestal · PDF18 Dec 2025View
SUPERSEDED The Homestal - Green Spine West Street Elevation-P07 · PDF18 Dec 2025View
SUPERSEDED Tree Planting Plan The Holme · PDF18 Dec 2025View
SUPERSEDED The Homestal - Greenway Street Elevations-P07 · PDF18 Dec 2025View
SUPERSEDED Planting Plan Sheet 1 Holme · PDF18 Dec 2025View
SUPERSEDED The Holme Zone 03 Plan-P05 · PDF18 Dec 2025View
Apartment 04 Elevations-P07 · PDF18 Dec 2025View
Site Context Plan · PDF18 Dec 2025View
House Type KK 4B6P Plans & Elevations-P05 · PDF18 Dec 2025View
Apartment 05 Elevations-P07 · PDF18 Dec 2025View
SUPERSEDED Landscape Boundary Treatments Homestal · PDF18 Dec 2025View
SUPERSEDED The Homestal Zone 06 Plan-P05 · PDF18 Dec 2025View
SUPERSEDED The Holme - Spine Road Street Elevations-P07 · PDF18 Dec 2025View
House Type B4&B5 2B4P Plans & Elevations-P02 · PDF18 Dec 2025View
SUPERSEDED Tree Planting Plan Homestal · PDF18 Dec 2025View
House Type O 2B4P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED The Homestal - East Elevation-P07 · PDF18 Dec 2025View
SUPERSEDED The Holme Zone 02 Plan-P05 · PDF18 Dec 2025View
Apartment 01 & 06 Plans-P07 · PDF18 Dec 2025View
SUPERSEDED The Holme Zone 04 Plan-P05 · PDF18 Dec 2025View
House Type B 2B4P Plans & Elevations-P05 · PDF18 Dec 2025View
SUPERSEDED The Homestal - North Elevation-P07 · PDF18 Dec 2025View
Apartment 05 Ground Floor-P07 · PDF18 Dec 2025View
Apartment 02 Elevations-P07 · PDF18 Dec 2025View
SUPERSEDED The Homestal Zone 01 Plan-P05 · PDF18 Dec 2025View
SUPERSEDED The Holme - Tertiary Road Street Elevations-P07 · PDF18 Dec 2025View
Apartment 05 Roof Plan-P07 · PDF18 Dec 2025View
SUPERSEDED Hard Landscape Homestal · PDF18 Dec 2025View
Preliminary Ground Investigation ReportContaminated Land Study · PDF17 Dec 2025View
LVIA Site Photographs_Part1 · PDF17 Dec 2025View
Flood Risk Assessment (FRA) and Drainage Strategy - RedactedFlood Risk Assessment · PDF17 Dec 2025View
Mitigation to New Forest Protected Sites report · PDF17 Dec 2025View
FRA supporting plan Holme finished floor levels · PDF17 Dec 2025View
LVIA Appendix A Methodology · PDF17 Dec 2025View
Planning StatementPlanning Statement · PDF17 Dec 2025View
LVIA Appendix B-Published Landscape Character Assessment · PDF17 Dec 2025View
Landscape and Visual Impact AssessmentLandscape Assessment · PDF17 Dec 2025View
FRA supporting plan Holme Horizontal Alignment · PDF17 Dec 2025View
FRA supporting plan Holme Proposed Long Sections 1 of 2 · PDF17 Dec 2025View
LVIA Appendix D_ Visual Effects-final · PDF17 Dec 2025View
FRA supporting plan Homestal Long Sections 1 of 2 · PDF17 Dec 2025View
Noise Impact Assessment · PDF17 Dec 2025View
Travel Plan · PDF17 Dec 2025View
LVIA Site Appraisal Plan · PDF17 Dec 2025View
FRA supporting plan - Homestal Typical Cross Sections 1 of 2 · PDF17 Dec 2025View
LVIA Landscape Character Plan-A1 · PDF17 Dec 2025View
Environmental Impact Assessment Statement of Conformity · PDF17 Dec 2025View
LVIA Site Context Plan · PDF17 Dec 2025View
FRA supporting plan Homestal Long Sections 2 of 2 · PDF17 Dec 2025View
Energy Statement Technical Addendum · PDF17 Dec 2025View
LVIA Topography Plan · PDF17 Dec 2025View
Outline Permission Location Plan · PDF17 Dec 2025View
LVIA Site Photographs_Part2 · PDF17 Dec 2025View
Design and Access StatementDesign And Access Statement · PDF17 Dec 2025View
Built Heritage Impact Assessment · PDF17 Dec 2025View
LVIA Zone of Theoretical Visibility (ZTV) Plan-A1Plan · PDF17 Dec 2025View
Statement of Community Involvement · PDF17 Dec 2025View
Nutrient Neutraility Study · PDF17 Dec 2025View
BNG Metric V3.017 Dec 2025View
Nutrient Neutrality Appendices 1 to 5 · PDF17 Dec 2025View
Homestal Typical Cross Sections 2 of 2 · PDF17 Dec 2025View
Transport AssessmentTransport Assessment · PDF17 Dec 2025View
Ecological Mitigation and Management PlanEcological Assessment · PDF17 Dec 2025View
Overarching Energy and Sustainability Statement · PDF17 Dec 2025View
LVIA Appendix C_ Landscape effects-final · PDF17 Dec 2025View
Archaeology Statement · PDF17 Dec 2025View
Biodiversity Net Gain (BNG) ReportEcological Assessment · PDF17 Dec 2025View
Homestal Horizontal Alignment · PDF17 Dec 2025View
LVIA Visual Appraisal Plan · PDF17 Dec 2025View
Ecological Impact AssessmentEcological Assessment · PDF17 Dec 2025View
Nutrient Neutrality Appendix 7 & References - Redacted · PDF17 Dec 2025View
FRA supporting plan Homestal finished floor levels · PDF17 Dec 2025View
FRA supporting plan Holme Proposed Long Sections 2 of 2 · PDF17 Dec 2025View
Public Art Statement · PDF17 Dec 2025View
Arboricultural Impact Assessment and Method StatementTree Info · PDF17 Dec 2025View
Covering LetterSupporting Documents · PDF12 Dec 2025View
Location PlanLocation Plan · PDF12 Dec 2025View
Application Form RedactedApplication Form · PDF12 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve The Reserved Matters
Decision Notice Conditions letter The Holme and Homestal One Horton Heath 280426
Planning conditions
  1. Approved plans The development hereby permitted shall be implemented in accordance with the plans listed in the ‘Drawing List’ dated 9 April 2026. Reason: For the avoidance of doubt and in the interest of proper planning.
  2. Materials No development beyond slab level of each sub-phase shall start until details and samples of the materials to be used in the construction of the external surfaces of that phase have been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area in accordance with policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  3. Protected species enhancements No development above slab phase of the development of the reserved matters phase shall occur until full details of species-specific enhancements, including bat roost features, hazel dormouse nest boxes, swift bricks/boxes, hibernacula for great crested newts and reptiles, and domes for hedgehogs shall be submitted to and approved in writing by the Local Planning Authority. This shall include the specification, number, and locations of all species-specific enhancements for the reserved matters phase, timings for works to be completed, and details of how the enhancement measures have been considered on a site wide holistic basis to achieve appropriate outcomes. Development shall be carried out in accordance with the approved details and timings for works. Reason: To accord with the submitted Ecological Impact Assessment and to ensure that species-based enhancements that are not part of Biodiversity Net Gain calculations/BNG delivery are incorporated within the development in a well-planned manner taking account of the wider development area in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016 – 2036).
  4. Landscaping details Further to the requirements of conditions 66 and 67 of the Outline Permission O/20/89498 full details of landscaping shall be submitted to and approved in writing within six months of development commencing. The details shall be broadly in accordance with the Landscape General Arrangement Plans listed in the ‘Drawing List’ dated 9 April 2026 as hereby approved. The details shall include; a) Further refined details of the open space north of the Green Spine and the area to the rear of Apartment Block 04; b) All boundary treatments and means of enclosure including any retaining structures/walls plus enclosure details for the northern attenuation basin; c) Hard surfacing materials; d) Existing and proposed finished levels and contours; e) Street furniture and structures (e.g. refuse or other storage units, signs and lighting); f) Details of the location of below ground services and lighting columns to ensure that conflicts are not created; g) Planting plans at 1:200 scale (for new trees, hedges and other planting) including schedules of plants, noting species, plant sizes, numbers and densities; h) A schedule of tree planting to include details of specialised tree cell planting pits where specified on the Landscape General Arrangement Plans; i) Details of any irrigation or drainage infrastructure and tree root barriers (if required); j) Details of tree staking/support systems; k) Written specifications (including cultivation and other operations associated with plant and grass establishment); l) Landscape maintenance plan. The hard and soft landscaping details shall be accompanied by an implementation programme. All hard and soft landscape works shall be carried out in accordance with the approved details prior to the occupation of any part of the development or in accordance with the timetable agreed with the Local Planning Authority and to the appropriate British Standard. Any trees or plants which, within a period of ten years after planting, are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of species, size and number as originally approved, to be agreed in writing by the Local Planning Authority. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents and for compliance with Policy DM1 of the Eastleigh Borough Local Plan (2016 – 2036).
  5. Parking and Traffic Management Plan Prior to first occupation of the development hereby approved, a Parking and Traffic Management Plan to include measures to prevent obstructive parking on internal access roads, junctions, turning areas and refuse/emergency vehicle routes, and any necessary parking controls and signage, shall be submitted to and approved in writing by the Local Planning Authority. The Parking and Traffic Management Plan shall thereafter be implemented in accordance with the approved details. Reason: To ensure that satisfactory access, manoeuvring, and parking management are provided and maintained in the interest of highway safety and the amenity of future residents, in accordance with policies DM1, DM13 and DM14 of the Eastleigh Borough Local Plan (2016-2036).
  6. Flood Risk and Drainage Strategy The development hereby permitted shall be carried out in accordance with the details set out in the Flood Risk Assessment and Surface Water Drainage Strategy prepared by Stantec, ref. 332612639, February 2026 (other than where these relate to foul drainage details covered by Condition 59 of the outline permission O/20/89498). Reason: To ensure appropriate drainage in the interest of managing flood risk and water quality, in accordance with Policies DM5 and DM6 of the Eastleigh Borough Local Plan (2016-2036).
  7. Ecological Mitigation and Biodiversity Net Gain The development hereby permitted shall be carried out in accordance with the recommendations of the Ecological Impact Assessment (Johns Associates, ref. 1735/Version V4.0, dated 12 December 2025), and the Biodiversity Net Gain (BNG) Report (Johns Associates, ref. 1735/Version 3.0, dated 11 December 2025). Reason: To accord with the submitted Ecological Impact Assessment and to ensure that Biodiversity Net Gain enhancements are delivered in the planned manner in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  8. Visibility splays All visibility splays shall remain clear of any obstruction over 0.6m in height in perpetuity. Reason: In the interest of highway safety in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.