Council planning record

Submission of Reserved Matters relating to Layout, Scale, Appearance, and Landscaping pursuant to Condition 4 (RM Requirements) of Outline Planning Permission O/20/89498 for the erection of 424 dwellings within Phase 10 (The Upper Acre), with associated public open space, landscaping, and cycle and vehicular parking, to include details relevant to the following Outline Planning Permission conditions: • Condition 16 (Arb Assessment) • Condition 21 (Design Code Compliance) • Condition 25 (Refuse) • Condition 31 (Higher Access Standards) • Condition 32 (Internal Space Standards • Condition 58 (Flood Mitigation) • Condition 61 (SUDs) • Condition 64 (EMMP) • Condition 71 (BNG) • Condition 72 (New Forest Protected Sites) Mitigation) • Condition 76 (Nutrient Neutrality)

ONE HORTON HEATH, UPPER ACRE, HORTON HEATH, FAIR OAK, EASTLEIGH

Decided Approve The Reserved MattersReference: RM/25/100575Eastleigh Borough Council

Last published check: 14 Oct 2026, 10:50. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Approve The Reserved Matters
Application type
Reserved matters
Received
3 Dec 2025
Validated
9 Dec 2025
Determination deadline
31 Mar 2026
Local authority
Eastleigh Borough Council

Application overview

Submission of Reserved Matters relating to Layout, Scale, Appearance, and Landscaping pursuant to Condition 4 (RM Requirements) of Outline Planning Permission O/20/89498 for the erection of 424 dwellings within Phase 10 (The Upper Acre), with associated public open space, landscaping, and cycle and vehicular parking, to include details relevant to the following Outline Planning Permission conditions: • Condition 16 (Arb Assessment) • Condition 21 (Design Code Compliance) • Condition 25 (Refuse) • Condition 31 (Higher Access Standards) • Condition 32 (Internal Space Standards • Condition 58 (Flood Mitigation) • Condition 61 (SUDs) • Condition 64 (EMMP) • Condition 71 (BNG) • Condition 72 (New Forest Protected Sites) Mitigation) • Condition 76 (Nutrient Neutrality)

Proposal details

Reference
RM/25/100575
Alternative references
14539339
Agent
Stantec UK Limited (Pete Tanner)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

ONE HORTON HEATH, UPPER ACRE, HORTON HEATH, FAIR OAK, EASTLEIGH

This record has no verified map location.

Documents 296 of 296

DocumentPublishedAction
RM_25_100575 PL_Final DecisionDecision Notice · PDF19 Mar 2026View
Condition Discharge LetterDecision Notice18 Mar 2026View
UpdateCommittee Report · PDF17 Mar 2026View
ReportCommittee Report · PDF17 Mar 2026View
HCC Local Lead Flood Authority IIConsultation Response · PDF9 Mar 2026View
260305 Amended Plan ScheduleSupporting Info · PDF6 Mar 2026View
EHO - Air QualityConsultation Response3 Mar 2026View
Urban Design IIConsultation Response3 Mar 2026View
Hampshire Highways IIConsultation Response · PDF2 Mar 2026View
Environment Agency IIConsultation Response26 Feb 2026View
Eastleigh RamblersConsultation Response23 Feb 2026View
UAOHH-BSL-A5-03-DR-A-3004-G2_Apartment Block 05 Proposed Third Floor PlanPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0301 Proposed Planting Strategy PlanPlan · PDF13 Feb 2026View
OHH-HED-ZZ-XX-PR-A-0001-P1 Design Statement (Revision 04)Plan · PDF13 Feb 2026View
UAOHH-BSL-A5-XX-DR-A-4001-G2_Apartment Block 05 Proposed ElevationsPlan · PDF13 Feb 2026View
UAOHH-BSL-A5-01-DR-A-3002-G2_Apartment Block 05 Proposed First Floor PlanPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0107 Hard Landscape Detail Area Plan 2 of 3Plan · PDF13 Feb 2026View
UAOHH-BSL-A2-01-DR-A-3002-G2_Apartment Block 02 Proposed First Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A3-03-DR-A-3004-G2_Apartment Block 03 Proposed Third Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A2-03-DR-A-3004-G2_Apartment Block 02 Proposed Third Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2009-G2-Principal Plan-Cycle ParkingPlan · PDF13 Feb 2026View
UAOHH-BSL-A4-00-DR-A-3001-G2_Apartment Block 04 Proposed Ground Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A3-XX-DR-A-4001-G2_Apartment Block 03 Proposed ElevationsPlan · PDF13 Feb 2026View
UAOHH-BSL-A3-00-DR-A-3001-G2_Apartment Block 03 Proposed Ground Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A4-XX-DR-A-4001-G2_Apartment Block 04 Proposed ElevationsPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0106 Hard Landscape Detail Area Plan 1 of 3Plan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2010-G2-Principal Plan-Refuse StoragePlan · PDF13 Feb 2026View
260126_UAOHH-BSL-L-ZZ-DR-APlan · PDF13 Feb 2026View
Amended Plan SchedulePlan · PDF13 Feb 2026View
UAOHH-BSL-A1-04-DR-A-3005-G2_Apartment Block 01 Proposed Roof PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A4-02-DR-A-3003-G2_Apartment Block 04 Proposed Second Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A1-01-DR-A-3002-G2_Apartment Block 01 Proposed First Floor PlanPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0103 Landscape Detail Area Plan 2 of 3Plan · PDF13 Feb 2026View
UAOHH-BSL-A2-02-DR-A-3003-G2_Apartment Block 02 Proposed Second Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2002-G2-Principal PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A4-01-DR-A-3002-G2_Apartment Block 04 Proposed First Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2008-G2-Principal Plan-ParkingPlan · PDF13 Feb 2026View
UAOHH-BSL-A3-04-DR-A-3005-G2_Apartment Block 03 Proposed Roof PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A2-XX-DR-A-4001-G2_Apartment Block 02 Proposed ElevationsPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0101 Landscape General Arrangement PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2007-G2-Principal Plan-Building HeightsPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2050-G2-Principal Plan-Private Amenity SpacePlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-ZZ-DR-A-5001-G2-Street Scene AA Chalcroft TollsPlan · PDF13 Feb 2026View
UAOHH-BSL-A3-01-DR-A-3002-G2_Apartment Block 03 Proposed First Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2005-G2-Principal Plan-AccommodationPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0100 Illustrative Landscape MasterplanPlan · PDF13 Feb 2026View
UAOHH-BSL-A3-02-DR-A-3003-G2_Apartment Block 03 Proposed Second Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A1-02-DR-A-3003-G2_Apartment Block 01 Proposed Second Floor PlanPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0105 Proposed Hard Landscape PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A4-03-DR-A-3004-G2_Apartment Block 04 Proposed Third Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2012-G2-Principal Plan-Facing Materials and Details PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2013-G2-Principal Plan Boundary TreatmentsPlan · PDF13 Feb 2026View
UAOHH-BSL-A4-04-DR-A-3005-G2_Apartment Block 04 Proposed Roof PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A5-04-DR-A-3005-G2_Apartment Block 05 Proposed Roof PlanPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0108 Hard Landscape Detail Area Plan 3 of 3Plan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-ZZ-DR-A-5003-G2-Street Scene CC MewsPlan · PDF13 Feb 2026View
UAOHH-BSL-A5-02-DR-A-3003-G2_Apartment Block 05 Proposed Second Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A2-00-DR-A-3001-G2_Apartment Block 02 Proposed Ground Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-XX-ZZ-DR-A-2011-G2_Principal Plan-Character AreasPlan · PDF13 Feb 2026View
UAOHH-BSL-A2-04-DR-A-3005-G2_Apartment Block 02 Proposed Roof PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-A5-00-DR-A-3001-G2_Apartment Block 05 Proposed Ground Floor PlanPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0102 Landscape Detail Area Plan 1 of 3Plan · PDF13 Feb 2026View
UAOHH-BSL-A1-XX-DR-A-4001-G2_Apartment Block 01 Proposed ElevationsPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-ZZ-DR-A-5004-P1-Street Scene DD Foxwood RoadPlan · PDF13 Feb 2026View
UAOHH-BSL-A1-03-DR-A-3004-G2_Apartment Block 01 Proposed Third Floor PlanPlan · PDF13 Feb 2026View
UAOHH-BSL-ZZ-XX-DR-A-2004-G2_Principal Plan-ColourPlan · PDF13 Feb 2026View
UAOHH-BSL-A1-00-DR-A-3001-G2_Apartment Block 01 Proposed Ground Floor PlanPlan · PDF13 Feb 2026View
1560-HED-XX-ZZ-DR-L-0104 Landscape Detail Area Plan 3 of 3Plan · PDF13 Feb 2026View
Statement on Pedestrian Crossings on Burnetts LaneSupporting Documents · PDF12 Feb 2026View
RM_25_100575 - OHH - Upper Acre - Response to Eastleigh Rambler's CommentsSupporting Documents12 Feb 2026View
APPENDIX 1.4 - TECHNICAL DRAWING PACK (5 OF 8)Supporting Info · PDF11 Feb 2026View
APPENDIX 1.0 - TECHNICAL DRAWING PACK (1 OF 8)Supporting Info · PDF11 Feb 2026View
APPENDIX 1.3 - TECHNICAL DRAWING PACK (4 OF 8)Supporting Info · PDF11 Feb 2026View
260211 EA Responses Covering Letter SUBMISSIONSupporting Info · PDF11 Feb 2026View
JOA-10-XX-RP-E-0003 Upper Acre EcIA V3.0Supporting Info · PDF11 Feb 2026View
APPENDIX 4.0 - DRAINAGE MAINTENANCE MANUALSupporting Info · PDF11 Feb 2026View
APPENDIX 1.7 - TECHNICAL DRAWING PACK (8 OF 8)Supporting Info · PDF11 Feb 2026View
JOA-10-XX-RP-E-0002 Upper Acre Statutory BNG Report V5.0Supporting Documents · PDF11 Feb 2026View
APPENDIX 1.5 - TECHNICAL DRAWING PACK (6 OF 8)Supporting Info · PDF11 Feb 2026View
JOA-10-XX-RP-E-0001 Upper Acre BNG Metric V5.0Supporting Info11 Feb 2026View
APPENDIX 2.0 - UK SUDS GREENFIELD RUNOFF CALCULATIONSupporting Info · PDF11 Feb 2026View
APPENDIX 1.2 - TECHNICAL DRAWING PACK (3 OF 8)Supporting Info · PDF11 Feb 2026View
AAL390 - DESIGNER'S RESPONSE TO LLFA COMMENTSSupporting Info · PDF11 Feb 2026View
Statement on Biodiversity Net GainSupporting Info · PDF11 Feb 2026View
APPENDIX 1.1 - TECHNICAL DRAWING PACK (2 OF 8)Supporting Info · PDF11 Feb 2026View
APPENDIX 1.6 - TECHNICAL DRAWING PACK (7 OF 8)Supporting Info · PDF11 Feb 2026View
APPENDIX 3.0 - SURFACE WATER DRAINAGE CALCULATIONSSupporting Info · PDF11 Feb 2026View
Env HealthConsultation Response9 Feb 2026View
OHH Upper Acre - EBC EHO Noise ResponseSupporting Documents · PDF5 Feb 2026View
OHH Upper Acre - TN02 Technical Note HCC RebuttalSupporting Documents · PDF5 Feb 2026View
EcologyConsultation Response · PDF21 Jan 2026View
Environmental Health (Contaminated Land)Consultation Response15 Jan 2026View
Tree OfficerConsultation Response · PDF15 Jan 2026View
Factual Ground Investigation ReportSupporting Documents · PDF14 Jan 2026View
HCC Local Lead Flood AuthorityConsultation Response · PDF12 Jan 2026View
Neighbour Letter_ ObjectionNeighbour Correspondence · PDF12 Jan 2026View
Hedge End Town CouncilConsultation Response12 Jan 2026View
Environmental HealthConsultation Response12 Jan 2026View
HCC HighwaysConsultation Response · PDF8 Jan 2026View
Urban DesignConsultation Response7 Jan 2026View
Natural EnglandConsultation Response6 Jan 2026View
Environment AgencyConsultation Response31 Dec 2025View
Hampshire SwiftsConsultation Response · PDF18 Dec 2025View
Consultation Response Letter from Eastleigh Ramblers REDACTEDConsultation Response · PDF18 Dec 2025View
Public Art Steering GroupConsultation Response17 Dec 2025View
Active Travel EnglandConsultation Response17 Dec 2025View
EIA Statement of Conformity - Upper AcreSupporting Documents · PDF17 Dec 2025View
Energy Statement Technical AddendumSupporting Documents · PDF16 Dec 2025View
HCC ArchaeologyConsultation Response15 Dec 2025View
Lighting Assessment · PDF5 Dec 2025View
Drainage and Flood Risk StrategyFlood Risk Assessment · PDF5 Dec 2025View
Supporting InformationSupporting Info · PDF5 Dec 2025View
Planning StatementPlanning Statement · PDF5 Dec 2025View
Proposed Floor PlanFloor Plan · PDF5 Dec 2025View
Drainage DetailsSupporting Info · PDF5 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Drainage General Arrangement PlanDrainage Plan · PDF3 Dec 2025View
Overarching Energy and Sustainability StrategySupporting Info · PDF3 Dec 2025View
Levels Overview PlanPlan · PDF3 Dec 2025View
Preliminary Ground Investigation ReportSupporting Documents · PDF3 Dec 2025View
Tree SurveyTree Info · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Tree Pit and Planting DetailsSupporting Info · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Proposed Planting Strategy PlanLandscape Plan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Landscape SpecificationSupporting Info · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Mitigation to New Forest Protected SitesSupporting Documents · PDF3 Dec 2025View
Propose Elevations and Floor PlansPlans · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Street SceneSupporting Info · PDF3 Dec 2025View
Apartments Precedent Images and ConceptsSupporting Info · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Drainage DetailsDrainage Plan · PDF3 Dec 2025View
Principal Plan · PDF3 Dec 2025View
Drainage General Arrangement · PDF3 Dec 2025View
Levels Overview PlansPlans · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Schedule of MaterialsSupporting Info · PDF3 Dec 2025View
Landscape Detail Area PlanLandscape Plan · PDF3 Dec 2025View
Principal PlanPlan · PDF3 Dec 2025View
Spine Road SuDS Strategy PlanDrainage Plan · PDF3 Dec 2025View
Proposed Elevations and Floor Plans · PDF3 Dec 2025View
Drainage Sheet PlanDrainage Plan · PDF3 Dec 2025View
Drainage PlanDrainage Plan · PDF3 Dec 2025View
Hard Landscape Detail Area PlanLandscape Plan · PDF3 Dec 2025View
Ecological Impact AssessmentEcological Assessment · PDF3 Dec 2025View
Application Form RedactedApplication Form · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Drainage DetailsSupporting Documents · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Travel PlanSupporting Documents · PDF3 Dec 2025View
Plots ScheduleSupporting Info · PDF3 Dec 2025View
Spine Road SuDS StrategySupporting Documents · PDF3 Dec 2025View
Proposed Elevations PlansElevations Plan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Nutrient Neutrality Report_RedactedSupporting Documents · PDF3 Dec 2025View
Proposed Elevations PlansElevations Plan · PDF3 Dec 2025View
Transport AssessmentTransport Assessment · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Levels Overview PlanPlan · PDF3 Dec 2025View
UAOHH-BSL-ZZ-XX-DR-A-0101-P1_Site Location Plan_.pdf · PDF3 Dec 2025View
Principal Parking PlanPlan · PDF3 Dec 2025View
Hard Landscape Detail Area PlanLandscape Plan · PDF3 Dec 2025View
Proposed First Floor Plan · PDF3 Dec 2025View
Proposed Roof PlanRoof Plan · PDF3 Dec 2025View
Proposed Roof PlanRoof Plan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Drainage and Flood Risk AssessmentFlood Risk Assessment · PDF3 Dec 2025View
Schedule AccommodationSupporting Info · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Submission Drawing Issue RegisterAttachment Summary · PDF3 Dec 2025View
Landscape Detail Area PlanLandscape Plan · PDF3 Dec 2025View
Proposed Elevations PlansElevations Plan · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
BNG MetricSupporting Documents3 Dec 2025View
Facing Materials and Details Schedule - HousesSupporting Documents · PDF3 Dec 2025View
Illustrative Landscape MasterplanLandscape Plan · PDF3 Dec 2025View
Location PlanLocation Plan · PDF3 Dec 2025View
Proposed Elevations and Floor Plans · PDF3 Dec 2025View
Levels OverviewSupporting Info · PDF3 Dec 2025View
Drainage NotesSupporting Info · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Appendix 7Flood Risk Assessment · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Apartments Block ScheduleSupporting Info · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Drainage PlanDrainage Report · PDF3 Dec 2025View
Street SceneSupporting Info · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Drainage PlanDrainage Plan · PDF3 Dec 2025View
Drainage PlanDrainage Plan · PDF3 Dec 2025View
Proposed Street SceneSupporting Info · PDF3 Dec 2025View
Water Management Strategy Plan Appendix 6Supporting Documents · PDF3 Dec 2025View
Proposed Elevations PlansPlans · PDF3 Dec 2025View
Hard Surface DetailsSupporting Documents · PDF3 Dec 2025View
Proposed Floor PlansElevations Plan · PDF3 Dec 2025View
Location PlanLocation Plan · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Air Quality AssessmentAir Quality Report · PDF3 Dec 2025View
Covering Letter.pdf · PDF3 Dec 2025View
Landscape General Arrangement PlanLandscape Plan · PDF3 Dec 2025View
Statement of Community InvolvementSupporting Info · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Ridge and Partners spine Roads SuDS Strategy- Appendix 2.0 RedactedDrainage Report · PDF3 Dec 2025View
Technical drawing PackSupporting Info · PDF3 Dec 2025View
Hard Landscape Detail Area PlanLandscape Plan · PDF3 Dec 2025View
Levels Overview PlanPlan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Proposed floor PlanFloor Plan · PDF3 Dec 2025View
Appendix 5 APPENDIX 1.2 - PFA OUTLINE PLANNING FRA & DS (3 OF 6)Supporting Documents · PDF3 Dec 2025View
Levels Overview PlanPlan · PDF3 Dec 2025View
House Types_Drawing Issue RegisterAttachment Summary · PDF3 Dec 2025View
Roof PlanRoof Plan · PDF3 Dec 2025View
Drainage DetailsSupporting Info · PDF3 Dec 2025View
Principal Plan · PDF3 Dec 2025View
DetailedTopographical SurveySupporting Documents · PDF3 Dec 2025View
Drainage PlanDrainage Plan · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Proposed Roof PlanRoof Plan · PDF3 Dec 2025View
Flood Risk AssessmentFlood Risk Assessment · PDF3 Dec 2025View
Proposed Elevations PlansElevations Plan · PDF3 Dec 2025View
Hard Surface DetailsSupporting Documents · PDF3 Dec 2025View
Proposed Elevations PlansElevations Plan · PDF3 Dec 2025View
Drainage DetailsDrainage Plan · PDF3 Dec 2025View
Levels OverviewSupporting Info · PDF3 Dec 2025View
_Apartments Materials ScheduleSupporting Info · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Principal PlanPlan · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Principal Plan-Plan · PDF3 Dec 2025View
Fence and Boundary Details PlanPlan · PDF3 Dec 2025View
Appendix A Flood Risk AssessmentFlood Risk Assessment · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Noise AssessmentNoise Report · PDF3 Dec 2025View
Submission Apartments Drawing Issue RegisterAttachment Summary · PDF3 Dec 2025View
Drainage Details PlanDrainage Plan · PDF3 Dec 2025View
Principal Plan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Drainage Details PlanDrainage Plan · PDF3 Dec 2025View
Surface Water Drainage CalculationsSupporting Info · PDF3 Dec 2025View
Plots ScheduleSupporting Info · PDF3 Dec 2025View
Design and Access StatementDesign And Access Statement · PDF3 Dec 2025View
Level Overview PlanPlan · PDF3 Dec 2025View
Principal PlanPlan · PDF3 Dec 2025View
Site Location PlanLocation Plan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Drainage Overland Flow Route PlanDrainage Plan · PDF3 Dec 2025View
Principal PlanPlans · PDF3 Dec 2025View
Principal PlanSupporting Documents · PDF3 Dec 2025View
BNG ReportSupporting Documents · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Bridge & Stepping Stones DetailsSupporting Info · PDF3 Dec 2025View
Proposed Floor Plan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Principal PlanPlan · PDF3 Dec 2025View
Proposed Hard Landscape PlanLandscape Plan · PDF3 Dec 2025View
Overall Site Context PlanSite Layout Plan · PDF3 Dec 2025View
Overall Site with ContextSite Layout Plan · PDF3 Dec 2025View
Drainage Maintenance ManualSupporting Documents · PDF3 Dec 2025View
Public Art StatementSupporting Info · PDF3 Dec 2025View
UAOHH-BSL-CC-ZZ-DR-A-3002-G1Plans · PDF3 Dec 2025View
Drainage Plan · PDF3 Dec 2025View
Proposed Roof PlanRoof Plan · PDF3 Dec 2025View
Proposed Elevations PlansElevations Plan · PDF3 Dec 2025View
Proposed Floor PlanFloor Plan · PDF3 Dec 2025View
Landscape General Arrangement PlanLandscape Plan · PDF3 Dec 2025View
Proposed Elevations PlansElevations Plan · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Levels Overview PlanPlan · PDF3 Dec 2025View
Landscape Detail Area PlanLandscape Plan · PDF3 Dec 2025View
Principal PlanPlan · PDF3 Dec 2025View
Proposed Floor PlansFloor Plan · PDF3 Dec 2025View
Hard Landscape Detail Area PlanLandscape Plan · PDF3 Dec 2025View
Landscape and Visual Impact AssessmentSupporting Documents · PDF3 Dec 2025View
Drainage DetailsSupporting Documents · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Levels Overview · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View
Drainage Catchment PlanDrainage Plan · PDF3 Dec 2025View
Levels Overview PLANPlan · PDF3 Dec 2025View
Proposed Street SceneSupporting Info · PDF3 Dec 2025View
Drainage Catchment PlanDrainage Plan · PDF3 Dec 2025View
Proposed Elevations PlansElevations Plan · PDF3 Dec 2025View
Ecological Mitigation and Management PlanSupporting Documents · PDF3 Dec 2025View
Proposed Elevations and Floor PlansPlans · PDF3 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve The Reserved Matters
RM_25_100575 PL_Final Decision Condition Discharge Letter
Planning conditions
  1. Approved plans The development hereby permitted shall be implemented in accordance with the Stantec Appendix B – Drawing List dated 5th March 2026. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. Materials No development beyond slab level of each sub-phase shall start until details and samples of the materials to be used in the construction of the external surfaces of that phase have been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area in accordance with Policy DM1 of the Eastleigh Borough Local Plan 2016 – 2036.
  3. Protected species enhancements No development above slab phase of the development of the reserved matters phase shall occur until full details of species-specific enhancements, including bat roost features, hazel dormouse nest boxes, swift bricks/boxes, hibernacula for great crested newts and reptiles, and domes for hedgehogs shall be submitted to and approved in writing by the Local Planning Authority. This shall include the specification, number, and locations of all species-specific enhancements for the reserved matters phase, timings for works to be completed, and details of how the enhancement measures have been considered on a site wide holistic basis to achieve appropriate outcomes. Development shall be carried out in accordance with the approved details and timings for works. Reason: To accord with the submitted Ecological Impact Assessment and to ensure that species-based enhancements that are not part of Biodiversity Net Gain calculations/BNG delivery are incorporated within the development in a well-planned manner taking account of the wider development area in accordance with Policy DM11 of the Eastleigh Borough Local Plan 2016 – 2036.
  4. Ecological mitigation and BNG The development hereby permitted shall be carried out in accordance with the recommendations of the Ecological Impact Assessment (Johns Associates, December 2025) and Biodiversity Net Gain Strategy (John’s Associates, December 2025) which have been submitted to and approved by the Local Planning Authority in accordance with paragraph 14(2) of Schedule 7A of the Town and Country Planning Act 1990. Reason: To accord with the submitted Ecological Impact Assessment and to ensure that Biodiversity Net Gain enhancements are delivered in planned manner in accordance with Policy DM11 of the Eastleigh Borough Local Plan 2016 – 2036.
  5. Drainage strategy The development hereby permitted shall be carried out in accordance with the details in the Drainage Strategy (Arch Associates, November 2025) and Designers Response to LLFA comments (Arch Associates, February 2026) (other than where these relate to condition 59 of the Outline Permission O/20/89498) which has been submitted to and approved by the Local Planning Authority in accordance with paragraph 14(2) of Schedule 7A of the Town and Country Planning Act 1990 and shall be implemented in accordance with the approved details. Reason: To accord with the submitted Drainage Strategy and ensure that appropriate drainage pathways are formed with suitable flow rates in accordance with Policy DM5 of the Eastleigh Borough Local Plan 2016 – 2036.
  6. Landscaping details Further to the requirements of conditions 66 and 67 of the Outline Permission O/20/89498 full details of landscaping shall be submitted to and approved in writing within six months of development commencing. The details shall be in broad accordance with the Illustrative Landscape Masterplan (1560-HED-XX-ZZ-DR-L-0100 REV 04), as hereby approved. The details shall include; a) planting plans with specification (including cultivation and other operations associated with plant and grass establishment); b) a schedule of plants noting species, plant sizes and proposed numbers/ densities; c) a schedule of tree planting to include the specification of tree planting pits where appropriate with details of any irrigation or drainage infrastructure, tree root barriers (if necessary) to prevent damage or disruption to any proposed hard surfacing or underground services, drains or other infrastructure; d) details of measures to soften the impact of bin stores and sub stations. e) details of the location of below ground services and lighting columns to ensure that conflicts are not created. f) notwithstanding the submitted plans an alternative landscape arrangement in the triangular area to the south of Block 3 (west of Foxwood Road). The hard and soft landscaping details shall be accompanied by an implementation programme. All hard and soft landscape works shall be carried out in accordance with the approved details prior to the occupation of any part of the development or in accordance with the timetable agreed with the Local Planning Authority and to the appropriate British Standard. Any trees or plants which, within a period of ten years after planting, are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of species, size and number as originally approved, to be agreed in writing by the Local Planning Authority. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents and for compliance with Policy DM1 of the Eastleigh Borough Local Plan 2016 – 2036.
  7. Highway details Prior to the first occupation of the development hereby approved, details of measures to address highway matters within the site shall be submitted to and approved in writing by the Local Planning Authority. Such details shall include: Measures to prevent parking which would obstruct internal access roads, junctions, turning areas and refuse/emergency vehicle routes;Any necessary parking controls or signage within the private estate;Provision of dropped kerbs where required to facilitate pedestrian movement and refuse collection; andMeasures to ensure that landscaping and other features do not impede areas required for vehicle manoeuvring, including vehicle overhang. The approved measures shall be implemented prior to first occupation. The development shall thereafter be retained and maintained in accordance with the approved details. Reason: To ensure that satisfactory access, manoeuvring, parking management and pedestrian connectivity are provided and maintained in the interests of highway safety and in the interests of the amenity of future residents in accordance with Policies DM1, DM13 and DM14 of the Eastleigh Borough Local Plan 2016 – 2036.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.