Prior Notification for the creation of 1.no 1-bedroom flat and 1.no studio flat at first floor from Class E with the retention of Class E at the ground floor under Schedule 2, Part 3, Class G of the Town and Country Planning (General Permitted Development) Order 2015

55-57 MARKET STREET, EASTLEIGH, SO50 5RF

Decided Prior Approval GrantedReference: PN/26/101581Eastleigh Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Prior Approval Granted
Application type
Prior notification
Received
12 Jun 2026
Validated
25 Jun 2026
Determination deadline
10 Sept 2026
Local authority
Eastleigh Borough Council

Application overview

Prior Notification for the creation of 1.no 1-bedroom flat and 1.no studio flat at first floor from Class E with the retention of Class E at the ground floor under Schedule 2, Part 3, Class G of the Town and Country Planning (General Permitted Development) Order 2015

Proposal details

Reference
PN/26/101581
Alternative references
15007381
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP
Agent
Rob Wiles

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

55-57 MARKET STREET, EASTLEIGH, SO50 5RF

This record has no verified map location.

Documents 15 of 15

DocumentPublishedAction
PN_26_101581 Delegated Officer ReportOfficer Report · PDF1 Sept 2026View
PN_26_101581 PL_Final DecisionDecision Notice · PDF1 Sept 2026View
Pollution Control updateConsultation Response · PDF25 Aug 2026View
Consultation Response Letter from Hampshire HighwaysConsultation Response · PDF24 Aug 2026View
ENVIRONMENTAL NOISE ASSESSMENT FOR CONVERSION OF EXISTING BUILDING REDACTEDNoise Report · PDF18 Aug 2026View
Eastleigh Town CouncilConsultation Response11 Aug 2026View
Proposed elevations and floor plans with dimensionsElevations And Floor Plan · PDF9 Jul 2026View
Southampton AirportConsultation Response · PDF8 Jul 2026View
Pollution ControlConsultation Response · PDF1 Jul 2026View
SUPERSEDED Proposed elevations and floor plans with dimensionsElevations And Floor Plan · PDF25 Jun 2026View
Existing Block and Location PlansPlans · PDF12 Jun 2026View
Application Form RedactedApplication Form · PDF12 Jun 2026View
Proposed Block and Location PlansPlans · PDF12 Jun 2026View
SUPERSEDED Proposed Elevations, Floor, Roof PlansPlans · PDF12 Jun 2026View
Existing Elevations, Floor and Roof PlansPlans · PDF12 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Prior Approval Granted
PN_26_101581 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: A101, A102, A103, A104 Rev B Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development shall be constructed and operated in accordance with the noise mitigation measures and recommendations identified within the submitted Noise Assessment Ian Sharland noise report dated 17 August 2026 reference M6091 titled 55 - 57 Market Street. The approved noise mitigation measures shall be implemented in full prior to the occupation/use of the development and shall thereafter be retained and maintained for the lifetime of the development. Reason: In accordance with policy DM8 of the Eastleigh Borough Local Plan (2016-2036)
  3. Prior to the first occupation of the development, a post-construction noise assessment shall be undertaken by a suitably qualified, experienced and competent acoustic consultant to verify that the development has been constructed and operates in accordance with the noise mitigation measures and noise performance requirements identified within the approved Noise Assessment Ian Sharland noise report dated 17 August 2026 reference M6091 titled 55 - 57 Market Street. The assessment shall include a noise survey and be undertaken within 6 weeks of completion of the relevant works and the findings shall be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of the development. The post-construction noise assessment report shall identify any measures necessary to achieve compliance with the approved noise criteria. Where the assessment identifies that the required noise or sound insulation standards have not been achieved, appropriate remedial measures shall be implemented and further testing undertaken by a suitably qualified, experienced and competent acoustic consultant to demonstrate compliance prior to occupation of the affected part of the development. Reason: In accordance with policy DM8 of the Eastleigh Borough Local Plan (2016-2036)
  4. Note to Applicant: It is a requirement that the applicant satisfies their obligations under Regulations 77 of the Conservation of Habitats and Species Regulations 2017 (as amended), in strict accordance with Article 3(1) of the Town and Country Planning (General Permitted Development) Order 2015 (as amended). Failure to comply with this will mean that the development will have been unlawfully implemented. In this instance appropriate mitigation is required to offset the development's impacts on the European Protected Site, in terms of additional recreational pressure (to the New Forest), and additional output of nutrients (nitrates and phosphates) arising from a net gain of residential accommodation. Development must not be occupied until the Local Planning Authority has given its written approval for the development and appropriate mitigation has been secured against the developments harmful impacts on the European Protected Site(s). Further information on Eastleigh Borough Council’s Schemes are available: Nitrates & Phosphates: https://www.eastleigh.gov.uk/planning-and-building/nutrient-offset-schemes New Forest: https://www.eastleigh.gov.uk/planning-and-building/recreational-disturbance
  5. Note to Applicant: Given the nature of the proposed development it is possible that a crane may be required during its construction. We would, therefore, draw the applicant’s attention to the requirement within the British Standard Code of Practice for the safe use of Cranes, for crane operators to consult the aerodrome before erecting a crane in close proximity to an aerodrome.
  6. Note to Applicant: Where the noise consultant has identified a mitigation measure or made a recommendation within the approved noise assessment, this should be treated as a requirement of the development and not merely a suggestion.
  7. Note to Applicant: Future residents will not be eligible for permits for parking in the Controlled Parking Zone within which the site sits as this is a ‘converted development’.
  8. Note to Applicant: In accordance with paragraph DM3 1.a of the National Planning Policy Framework (August 2026), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.