Council planning record

Prior Notification Application Under Class AA for an additional storey on the principal dwelling only and new fenestration to front and rear elevations only.

14 TORWOOD GARDENS, BISHOPSTOKE, EASTLEIGH, SO50 8PD

Decided Prior Approval Not RequiredReference: PN/25/99571Eastleigh Borough Council

Last published check: 22 Sept 2026, 00:45. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Prior Approval Not Required
Application type
Prior notification
Received
17 Jun 2025
Validated
17 Jun 2025
Determination deadline
12 Aug 2025
Local authority
Eastleigh Borough Council

Application overview

Prior Notification Application Under Class AA for an additional storey on the principal dwelling only and new fenestration to front and rear elevations only.

Proposal details

Reference
PN/25/99571
Ward
Bishopstoke Ward
Parish
Bishopstoke CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

14 TORWOOD GARDENS, BISHOPSTOKE, EASTLEIGH, SO50 8PD

This record has no verified map location.

Documents 11 of 11

DocumentPublishedAction
PN_25_99571 PL_Final DecisionDecision Notice · PDF12 Aug 2025View
Officer ReportOfficer Report · PDF12 Aug 2025View
Application Form RedactedApplication Form · PDF17 Jun 2025View
Location planLocation Plan · PDF17 Jun 2025View
Existing 3D ViewsIllustration · PDF17 Jun 2025View
Proposed Floor PlansFloor Plan · PDF17 Jun 2025View
Proposed Elevations PlanElevations Plan · PDF17 Jun 2025View
Proposed 3D ViewsIllustration · PDF17 Jun 2025View
Site Layout PlanSite Layout Plan · PDF17 Jun 2025View
Existing Elevations PlanElevations Plan · PDF17 Jun 2025View
Existing Floor and Roof PlansFloor Plan · PDF17 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Prior Approval Not Required
PN_25_99571 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: LOC 01, DWG Plans 03795_ Rev B, DWG Plans 03976_ Rev B, DWG Plans 03797_ Rev B, DWG Plans 03798_ Rev B, DWG Plans 03799_ Rev B, DWG Plans 03794_ Rev B, DWG Plans 03793_ Rev B Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Schedule 2, Part 1, Class AA, of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The conditions set out within A.A, before beginning the development, the developer must provide the local planning authority with a report for the management of the construction of the development, which sets out the proposed development hours of operation and how any adverse impact of noise, dust, vibration and traffic on adjoining owners or occupiers will be mitigated.
  5. The developer must notify the local planning authority of the completion of the development as soon as reasonably practicable after completion; and(e)that notification must be in writing and include— (i)the name of the developer; (ii)the address of the dwellinghouse; and (iii)the date of completion.
  6. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.