Council planning record

Change of use of Class E office floor space to 4 x residential flats (Class C3) under Part 3, Class MA of the General Permitted Development Order

SEAFIRE HOUSE, SOUTH POINT, ENSIGN WAY, HAMBLE-LE-RICE, SOUTHAMPTON, SO53 4RF

Decided Prior Approval GrantedReference: PN/25/99086Eastleigh Borough Council

Last published check: 22 Sept 2026, 07:33. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Prior Approval Granted
Application type
Prior notification
Received
18 Mar 2025
Validated
21 Mar 2025
Determination deadline
16 May 2025
Local authority
Eastleigh Borough Council

Application overview

Change of use of Class E office floor space to 4 x residential flats (Class C3) under Part 3, Class MA of the General Permitted Development Order

Proposal details

Reference
PN/25/99086
Alternative references
13863333 manual d/l
Ward
Hamble & Netley Ward
Parish
Hamble-le-Rice CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

SEAFIRE HOUSE, SOUTH POINT, ENSIGN WAY, HAMBLE-LE-RICE, SOUTHAMPTON, SO53 4RF

This record has no verified map location.

Documents 18 of 18

DocumentPublishedAction
Discharge of conditions 2b and 3 of PN.25.99086 100626Discharge Of Conditions Decision Notice · PDF10 Jun 2026View
Consultation Response Letter from Natural EnglandConsultation Response · PDF19 Jan 2026View
Discharge of condition 2a and 4 of permission PN.25.9086 Unit 9 Southpoint 310725 · PDF31 Jul 2025View
PN_25_99086 Decision notice informative leaflet - PERMITDecision · PDF8 May 2025View
PN_25_99086 PL_Final DecisionDecision Notice · PDF8 May 2025View
Officer ReportOfficer Report · PDF8 May 2025View
Environmental Health further noise commentsConsultation Response · PDF6 May 2025View
Car parking plan · PDF1 May 2025View
Acoustic Report_RedactedReport - Other · PDF1 May 2025View
Parish Council commentsConsultation Response · PDF30 Apr 2025View
Highway Authority responseConsultation Response · PDF1 Apr 2025View
Environmental Health comments South PointConsultation Response · PDF26 Mar 2025View
Updated Block and Location PlanPlans · PDF21 Mar 2025View
Existing Floor PlansFloor Plan · PDF20 Mar 2025View
Proposed Floor PlansFloor Plan · PDF20 Mar 2025View
Industrial Units as permittedPlans · PDF18 Mar 2025View
Application Form RedactedApplication Form · PDF18 Mar 2025View
Existing Site Plan LayoutSite Layout Plan · PDF18 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Prior Approval Granted
Discharge of conditions 2b and 3 of PN.25.99086 100626 PN_25_99086 Decision notice informative leaflet - PERMIT PN_25_99086 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: • AE47.SK03A (Block and Location Plan) • AE47.SK01A (Plans as existing) • AE47.SK02A (Plans as proposed) Reason: For the avoidance of doubt and in the interests of proper planning.
  2. a) Prior to commencement of the development hereby approved, full details of an acoustic enclosure to be constructed around the plant and equipment at Units 6 and 7 South Point, shall be submitted to and approved in writing by the Local Planning Authority; b) Prior to occupation of the development, the acoustic enclosure shall be installed in accordance with the approved details and updated noise measurements shall be submitted to and approved in writing by the Local Planning Authority to demonstrate that the existing noise levels at the site façade achieves acceptable noise criteria from British Standard 4142:2014+A1:2019, as set out in the Environmental Noise Impact Assessment prepared by Sound Advice Acoustics Ltd, ref. SA-8025, April 2025. Reason: To safeguard the amenities of future occupiers, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  3. Prior to first occupation of the development hereby approved, a post completion noise assessment shall be carried out by a suitably qualified acoustic consultant and submitted to and approved in writing by the Local Planning Authority, to demonstrate that the glazing and ventilation (MVHR) solutions set out in the Environmental Noise Impact Assessment report prepared by Sound Advice Acoustics Ltd, ref. SA-8025, April 2025, achieve the noise criteria specified in the report. Reason: To safeguard the amenities of future occupiers, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  4. a) Prior to commencement of the development hereby approved, a scheme for sound insulation between the adjoining party wall between the site and the adjoining commercial unit shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall ensure that the airborne sound insulation performance meets or exceeds the standards outlined in Approved Document E of the Building Regulations (2015 as amended) for refurbishments. b) the sound insulation scheme shall be fully implemented prior to first occupation of the residential units and permanently retained thereafter. Reason: To safeguard the amenities of future occupiers, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  5. Prior to first occupation of the dwellings hereby permitted, the 8 parking spaces shown on the approved plans shall be provided and maintained thereafter for residential parking only. Reason: To ensure adequate parking provision to serve the residential use and to prevent conflicts with commercial parking, in accordance with Policy DM14 of the Eastleigh Borough Local Plan (2016-2036).
  6. Prior to first occupation of the dwellings hereby permitted, cycle storage (at least 1 space per unit) shall be provided in accordance with details that have first been submitted to and approved in writing by the Local Planning Authority. The cycle storage shall thereafter be retained for cycle storage purposes only. Reason: To encourage the use of alternative means of transport to the private car, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  7. Note to Applicant: Development under Class MA is permitted subject to the condition that it must be completed within a period of 3 years starting with the prior approval date.
  8. Note to Applicant: It is a requirement that the applicant satisfies their obligations under Regulation 77 of the Conservation of Habitats and Species Regulations 2017 (as amended), in strict accordance with Article 3(1) of the Town and Country Planning (General Permitted Development) Order 2015 (as amended). Failure to comply with this will mean that the development will have been unlawfully implemented. In this instance appropriate mitigation is required to offset the development's impacts on the European Protected Sites, in terms of additional recreational pressure (to the Solent and New Forest), and additional output of nutrients (nitrates) arising from a net gain of residential accommodation. Development must not commence until the Local Planning Authority has given its written approval for the development and appropriate mitigation has been secured against the developments harmful impacts on the European Protected Site(s). Further information on Eastleigh Borough Council’s Schemes are available: Nitrates: Nutrient Neutrality Solent and New Forest recreation mitigation: Recreational disturbance
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.