Council planning record

Prior Approval for the installation of Solar Photo Voltaic (SPV) arrays to the south-east and south-west facing roof slopes on a non-domestic office building

HIGHFIELD COURT, TOLLGATE, CHANDLER'S FORD, EASTLEIGH, SO53 3TY

Decided Prior Approval GrantedReference: PN/25/98855Eastleigh Borough Council

Last published check: 27 Sept 2026, 17:42. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Prior Approval Granted
Application type
Prior notification
Received
3 Feb 2025
Validated
3 Feb 2025
Determination deadline
31 Mar 2025
Local authority
Eastleigh Borough Council

Application overview

Prior Approval for the installation of Solar Photo Voltaic (SPV) arrays to the south-east and south-west facing roof slopes on a non-domestic office building

Proposal details

Reference
PN/25/98855
Alternative references
13746190
Ward
Eastleigh South Ward
Parish
Chandler's Ford CP
Agent
Fellows Planning Limited (Mrs Natalie Fellows)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

HIGHFIELD COURT, TOLLGATE, CHANDLER'S FORD, EASTLEIGH, SO53 3TY

This record has no verified map location.

Documents 8 of 8

DocumentPublishedAction
PN_25_98855 PL_Final DecisionDecision Notice · PDF27 Mar 2025View
PN_25_98855 Delegated Officer ReportOfficer Report · PDF26 Mar 2025View
Application Form RedactedApplication Form · PDF3 Feb 2025View
highfield noteSupporting Documents · PDF3 Feb 2025View
Location PlanLocation Plan · PDF3 Feb 2025View
Existing Site and Roof PlanPlans · PDF3 Feb 2025View
Highfield Court - Construction and Access Statement V1Supporting Documents · PDF3 Feb 2025View
Proposed Elevations and Roof PlanPlans · PDF3 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Prior Approval Granted
PN_25_98855 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 240001-A-PL-001_revP1, 240001-A-PL-005_revP1 & P3078-D-PV0001-01-JF. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. In the event that the development hereby permitted becomes redundant or not required for the purpose permitted, then the development and all the associated equipment shall be removed from site within three months. Reason: In the interests of visual amenity.
  3. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  4. Note to Applicant: Given the nature of the proposed development it is possible that a crane may be required during its construction. We would, therefore, draw the applicant’s attention to the requirement within the British Standard Code of Practice for the safe use of Cranes, for crane operators to consult the aerodrome before erecting a crane in close proximity to an aerodrome. This is explained further in Advice Note 4 – Cranes (available at https://www.aoa.org.uk/policy-campaigns/operations[1]safety/).
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.