Application for Prior Approval for a single storey roof extension (rear part of building) to form 6 apartments, under Schedule 2, Part 20, Class AB of the Town and Country Planning (General Permitted Development) Order.
Application for Prior Approval for a single storey roof extension (rear part of building) to form 6 apartments, under Schedule 2, Part 20, Class AB of the Town and Country Planning (General Permitted Development) Order.
Proposal details
Reference
PN/24/98338
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
Tony Allen
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Part 20, Class AB, AB.2 (4) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
The development hereby permitted shall be implemented in accordance with the following plans numbered: • 23.1371/701 Rev. A (Location and Block Plans) • 23.1371/410 Rev. A (Proposed 2F Plan) • 23.1371/305 Rev. D (Elevations A and B) • 23.1371/506 Rev. B (SW and NE Elevations) • 23.1371/505 Rev. A (SE and NW Elevations) • 23.1371/415 (Proposed Section AA) Reason: For the avoidance of doubt and in the interests of proper planning.
No development shall start on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Planning Authority, which shall include: (a) A programme of and phasing of demolition (if any) and construction work; (b) The provision of long term facilities for contractor parking; (c) The arrangements for deliveries associated with all construction works; (d) Methods and phasing of construction works; (e) Access and egress for plant and machinery; (f) Protection of pedestrian routes during construction; (g) Location of temporary site buildings, compounds, construction material, and plant storage areas; (h) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e. wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process; (i) Measures to control dust, dirt and vibration generated by construction; (j) Details of hoarding and temporary lighting; (k) Construction hours of operation. Demolition and construction work shall only take place in accordance with the approved CEMP. Reason - In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality, in accordance with Policies DM1 and DM8 of the Eastleigh Borough Local Plan (2016-2036).
The development hereby approved shall be carried out in accordance with the recommendations and specifications set out in the Noise Impact Assessment prepared by DAA Group, dated 25th November 2024 (Issue 01), and the noise mitigation measures shall thereafter be retained. Reason: To ensure that future occupants are not adversely impacted by noise, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
Prior to commencement of the development hereby permitted, full details of the type and colour of tiles to be used for the mansard roof extension shall be submitted to and approved in writing by the Local Planning Authority. The roof extension shall thereafter be constructed in accordance with the approved details. Reason: In the interest of visual amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
Prior to occupation of the development hereby permitted, the 5 parking spaces shown on approved plan ref. 23.1371/701 Rev. A shall be provided and maintained thereafter for residential parking only. Reason: To ensure adequate parking provision to serve the residential use, and to prevent conflicts with commercial parking, in accordance with Policy DM14 of the Eastleigh Borough Local Plan (2016-2036).
Prior to occupation of the development hereby approved, cycle and refuse storage facilities shall be provided in accordance with the approved plans and thereafter retained for cycle and refuse storage purposes only. Reason: In the interest of amenity and to encourage the use of alternative means of transport to the private car, in accordance with Policies DM1 and DM13 of the Eastleigh Borough Local Plan (2016-2036).
Note to Applicant: If works are required within the nesting season (March to August inclusive) then a nesting bird survey should be undertaken by a suitably qualified ecologist no more than 48 hours in advance. If evidence of an active bird’s nest is found during construction, work must stop, and a 5m buffer must be erected around the nest to protect it from disturbance until after the chicks have fledged and left the nest.
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at I've found a bat during works - I'm working on a building with bats - Bat Conservation Trust. Swift nest boxes would be an appropriate biodiversity enhancement as there are records of swifts very close to this site.
Note to Applicant: It is a requirement that the applicant satisfies their obligations under Regulation 77 of the Conservation of Habitats and Species Regulations 2017 (as amended), in strict accordance with Article 3(1) of the Town and Country Planning (General Permitted Development) Order 2015 (as amended). Failure to comply with this will mean that the development will have been unlawfully implemented. In this instance appropriate mitigation is required to offset the development's impacts on the European Protected Site, in terms of additional recreational pressure (to the New Forest), and additional output of nutrients (nitrates and phosphates) arising from a net gain of residential accommodation. Development must not commence until the Local Planning Authority has given its written approval for the development and appropriate mitigation has been secured against the developments harmful impacts on the European Protected Site(s). Further information on Eastleigh Borough Council’s Schemes are available: Nitrates & Phosphates: https://www.eastleigh.gov.uk/planning-and-building/nutrient-offset-schemes#:~:text=The%20Council's%20nitrate%20offer,our%20legal%20and%20administrative%20costs. New Forest: https://www.eastleigh.gov.uk/media/5441/update-doc-4c-new-forest-interim-mitigation.pdf
Note to Applicant: The developer must notify the LPA of the completion of the development as soon as reasonably practicable after completion.
Note to applicant: Given the nature of the proposed development it is possible that a crane may be required during its construction. We would, therefore, draw the applicant’s attention to the requirement within CAP 1096 Airport Guidance to crane users on the crane notification process and obstacle lighting and marking.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.