Installation of 504.28 kWp Solar PV system comprising of 862 solar panels across two buildings: SP1 (128.12 kWp, 219 solar panels) and SP2 (376.16 kWp, 643 solar panels).

SOUTH POINT 1 AND 2, SOUTH POINT, ENSIGN WAY, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4RF

Decided Prior Approval GrantedReference: PN/24/97951Eastleigh Borough Council

Last published check: 28 Sept 2026, 23:53. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Prior Approval Granted
Application type
Prior notification
Received
2 Aug 2024
Validated
19 Aug 2024
Determination deadline
14 Oct 2024
Local authority
Eastleigh Borough Council

Application overview

Installation of 504.28 kWp Solar PV system comprising of 862 solar panels across two buildings: SP1 (128.12 kWp, 219 solar panels) and SP2 (376.16 kWp, 643 solar panels).

Proposal details

Reference
PN/24/97951
Alternative references
13290295
Ward
Hamble & Netley Ward
Parish
Hamble-le-Rice CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

SOUTH POINT 1 AND 2, SOUTH POINT, ENSIGN WAY, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4RF

This record has no verified map location.

Documents 11 of 11

DocumentPublishedAction
PN_24_97951 Delegated Officer ReportOfficer Report · PDF25 Sept 2024View
PN_24_97951 PL_Final DecisionDecision Notice · PDF25 Sept 2024View
Southampton Airport updateConsultation Response · PDF9 Sept 2024View
Solar Panel Detail View - with dimensionsPlan · PDF6 Sept 2024View
Mono-facial moduleSupporting Info · PDF6 Sept 2024View
CooperVision Roof PhotosPhotos · PDF6 Sept 2024View
Environmental HealthConsultation Response · PDF2 Sept 2024View
Southampton AirportConsultation Response · PDF21 Aug 2024View
Location PlanLocation Plan · PDF19 Aug 2024View
Block PlanBlock Plan · PDF19 Aug 2024View
Application FormApplication Form · PDF2 Aug 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Prior Approval Granted
PN_24_97951 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: CV-SP1-2-PV-001.2 Rev A, CV-SP1-2-PV-002.2 Rev A and Detail View Reason: For the avoidance of doubt and in the interests of proper planning.
  2. No development shall take place until a glint and glare assessment has been submitted to and approved in writing by the Local Planning Authority. The works shall thereafter be carried out in accordance with the approved details. No subsequent alterations to the approved renewable energy scheme are to take place unless submitted to and approved in writing by the Local Planning Authority. Reason: Due to the potential for reflection from Solar Photovoltaic (SPV) Systems to cause glare, dazzling pilots or leading them to confuse reflections with aeronautical lights.
  3. In the event that the development hereby permitted becomes redundant or not required for the purpose permitted, then the development and all the associated equipment shall be removed from site within three months. Reason: In the interests of visual amenity.
  4. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.