Council planning record

Installation of 1,044 solar panels across 5no. buildings contained within the Utilita Bowl venue.

UTILITA BOWL, MARSHALL DRIVE, WEST END, SOUTHAMPTON, SO30 3XH

Decided Prior Approval GrantedReference: PN/24/96850Eastleigh Borough Council

Last published check: 30 Sept 2026, 09:36. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Prior Approval Granted
Application type
Prior notification
Received
7 Feb 2024
Validated
19 Mar 2024
Determination deadline
12 Jun 2024
Local authority
Eastleigh Borough Council

Application overview

Installation of 1,044 solar panels across 5no. buildings contained within the Utilita Bowl venue.

Proposal details

Reference
PN/24/96850
Alternative references
12772259
Ward
West End South Ward
Parish
West End CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

UTILITA BOWL, MARSHALL DRIVE, WEST END, SOUTHAMPTON, SO30 3XH

This record has no verified map location.

Documents 44 of 44

DocumentPublishedAction
PN-24-96850 Utilita Bowl, Botley RoadOfficer Report · PDF30 May 2024View
PN_24_96850 PL_Final DecisionDecision Notice · PDF30 May 2024View
4a_Utilita Bowl Floor Plans existing proposed-19-04-2024Plan · PDF23 Apr 2024View
3c_Utilita Stand-Existing proposed Elevations-23-04-2024Plan · PDF23 Apr 2024View
3aa_Utilita Bowl Hotel PV-Existing proposed Elevations-23-04-2024Plan · PDF23 Apr 2024View
3b_Utilita Stand-Existing proposed Elevations-23-04-2024Plan · PDF23 Apr 2024View
4b_East West Stand Roof Plans existing proposed-19-04-2024Plan · PDF23 Apr 2024View
AMENDED Location PlanLocation Plan · PDF19 Mar 2024View
Existing and Proposed East and West Stand Roof PlansRoof Plan · PDF18 Mar 2024View
Existing and Proposed West Stand ElevationsElevations Plan · PDF18 Mar 2024View
Existing and Proposed Arthur Holt ElevationsElevations Plan · PDF18 Mar 2024View
Existing and Proposed Well Being Centre front and rear ElevationsElevations Plan · PDF18 Mar 2024View
Block PlanBlock Plan · PDF18 Mar 2024View
Existing and Proposed Arthur Holt ElevationsElevations Plan · PDF18 Mar 2024View
Existing and Proposed West Stand ElevationsElevations Plan · PDF18 Mar 2024View
Existing and Proposed ElevationsElevations Plan · PDF18 Mar 2024View
Location PlanLocation Plan · PDF18 Mar 2024View
Existing and Proposed Arthur Holt Roof PlansRoof Plan · PDF18 Mar 2024View
Existing and Proposed East Stand ElevationsElevations Plan · PDF18 Mar 2024View
Existing and Proposed Roof PlansRoof Plan · PDF18 Mar 2024View
Existing and Proposed Well Being Centre ElevationsElevations Plan · PDF18 Mar 2024View
Existing and Proposed Hotel ElevationsElevations Plan · PDF18 Mar 2024View
Existing and Proposed Hotel Roof PlansRoof Plan · PDF18 Mar 2024View
Block Plan Arthur Holt Pavilion and Well Being CentreBlock Plan · PDF18 Mar 2024View
Utilita Bowl/Hotel Existing and Proposed ElevationsElevations Plan · PDF5 Mar 2024View
Arthur Holt Existing and Proposed ElevationsElevations Plan · PDF5 Mar 2024View
West Stand Existing and Proposed ElevationsElevations Plan · PDF5 Mar 2024View
Arthur Holt Existing and Proposed Roof PlanRoof Plan · PDF5 Mar 2024View
Wellbeing Centre Existing and Proposed ElevationsElevations Plan · PDF5 Mar 2024View
East and West Stand - Existing and Proposed Roof PlanRoof Plan · PDF5 Mar 2024View
Location PlanLocation Plan · PDF5 Mar 2024View
Wellbeing Centre Existing and Proposed Roof PlanRoof Plan · PDF5 Mar 2024View
East Stand Existing and Proposed ElevationsElevations Plan · PDF5 Mar 2024View
Hotel Existing and Proposed Roof PlanRoof Plan · PDF5 Mar 2024View
Block PlanBlock Plan · PDF5 Mar 2024View
240131_UB_Solar PV Equipment_Application StatementSupporting Documents · PDF7 Feb 2024View
Framing System DetailsSupporting Documents · PDF7 Feb 2024View
Application FormApplication Form · PDF7 Feb 2024View
GL-EN-TwinPlus-T-182-108-10BB-Black FrameSupporting Documents · PDF7 Feb 2024View
Indicative Layout HotelPhotographs · PDF7 Feb 2024View
Indicative Stadium LayoutPhotographs · PDF7 Feb 2024View
Solar PV LayoutSite Layout Plan · PDF7 Feb 2024View
Solar PV Layout - Arthur Holt Pavilion & Wellbeing CentreSite Layout Plan · PDF7 Feb 2024View
Solar layoutSite Layout Plan · PDF7 Feb 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Prior Approval Granted
PN_24_96850 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: • Location Plan PV-1 • Utilita Bowl/ Hotel Existing/ Proposed Elevations PV-3a Rev P02 • Hotel Existing Proposed Roof Plan PV-4a Rev P04 • East West Existing Proposed Roof Plan PV-4b Rev P04 • East Stand Existing/ Proposed Elevation PV-3c Rev P04 • East Stand Existing/ Proposed Elevations PV-3cc Rev P01 • West Stand Existing/ Proposed Elevations PV-3bb Rev P01 • West Stand Existing/ Proposed Elevations PV-3b Rev P04 • Wellbeing Existing Proposed Roof Plan PV-4d • Wellbeing Centre Existing/ Proposed Elevations PV-3e • Wellbeing Centre Existing/ Proposed Elevations PV-3ee • Arthur Holt Existing proposed Roof Plan PV-4c • Arthur Holt Existing/ Proposed Elevations PV-3d • Arthur Holt Existing/ Proposed Elevations PV-3dd • Utilita Bowl, Southampton – Glint & Glare Assessment (Dated 17 May 2024) Reason: For the avoidance of doubt and in the interests of proper planning.
  2. In the event that the development hereby permitted becomes redundant or not required for the purpose permitted, then the development and all the associated equipment shall be removed from site within three months. Reason: In the interests of visual amenity.
  3. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  4. Note to Applicant: Given the nature of the proposed development it is possible that a crane may be required during its construction. We would, therefore, draw the applicant’s attention to the requirement within the British Standard Code of Practice for the safe use of Cranes, for crane operators to consult the aerodrome before erecting a crane in close proximity to an aerodrome. This is explained further in Advice Note 4 – Cranes (available at https://www.aoa.org.uk/policy-campaigns/operations[1]safety/).
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.