Council planning record

Prior notification for the erection of single storey rear extension following removal of existing extension and conservatory. Depth 5.8 metres. Maximum height 3.9 metres. Eaves height 2.3 metres.

1 MONTROSE CLOSE, BOTLEY, SOUTHAMPTON, SO30 2RJ

Decided Prior Approval Not RequiredReference: PN/23/96034Eastleigh Borough Council

Last published check: 3 Oct 2026, 05:27. Check the council record for more recent changes.

Application location

1 MONTROSE CLOSE, BOTLEY, SOUTHAMPTON, SO30 2RJ

This record has no verified map location.

Application summary

Status
Decided Prior Approval Not Required
Application type
Prior notification
Received
15 Sept 2023
Validated
15 Sept 2023
Determination deadline
27 Oct 2023
Local authority
Eastleigh Borough Council

Application overview

Prior notification for the erection of single storey rear extension following removal of existing extension and conservatory. Depth 5.8 metres. Maximum height 3.9 metres. Eaves height 2.3 metres.

Proposal details

Reference
PN/23/96034
Alternative references
12458902
Ward
Botley Ward
Parish
Botley CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
PN_23_96034 PL_ PD Final DecisionDecision Notice · PDF19 Oct 2023View
2023 LE5 proposed side rear plan viewsElevations And Floor Plan15 Sept 2023View
Proposed ImageIllustration15 Sept 2023View
Existing 2023 LE4 current side rear plan viewsElevations And Floor Plan15 Sept 2023View
2022 LE3 Site Plan Proposed Single storey extensionSite Layout Plan15 Sept 2023View
2022 LE2 Site Plan Existing and proposedSite Layout Plan15 Sept 2023View
Existing ImageIllustration15 Sept 2023View
ApplicationFormRedactedApplication Form · PDF15 Sept 2023View
Location plan 1to2500 scaleLocation Plan15 Sept 2023View
existing location plan - 1to1250 scaleLocation Plan15 Sept 2023View
Existing block plan 1to500 scaleBlock Plan15 Sept 2023View
2023 LE1 Site Plan ExistingSite Layout Plan15 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior Approval Not Required
PN_23_96034 PL_ PD Final Decision
Planning conditions
  1. Subject to due compliance with the following conditions: a) The development shall only be carried out in accordance with the application and drawings submitted to the Local Planning Authority on 15 September 2023. b) The materials used in any exterior work (other than materials used in the construction of a conservatory) shall be of a similar appearance to those used in the construction of the exterior of the existing dwelling house.
  2. Note to applicant: Please be advised that wildlife protection laws apply. The Wildlife and Countryside Act (1981 as amended) is the primary legislation that protects wild animals, plants, and habitats in the UK. It lists the species which are protected by law along with their resting places and the non-native invasive species which must not be allowed to spread into the wild. If you suspect that protected or invasive species may be affected by your development, it is your responsibility to get an ecology survey and implement the recommended mitigation measures. The following resources may be helpful: The Wildllife Trusts https://www.wildlifetrusts.org/uk-wildlife-law Bat Conservation Trust https://www.bats.org.uk/ CIEEM https://cieem.net/i-need/finding-a-consultant/ Crown Prosecution Service Wildlife Offences available at: https://www.cps.gov.uk/legal-guidance/wildlife-offences
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.