Council planning record

Prior notification for the installation of 1,021 roof mounted photovoltaic panels on non-domestic building.

UNIT 2, STRATEGIC PARK, COMINES WAY, HEDGE END

Decided Prior Approval GrantedReference: PN/22/93982Eastleigh Borough Council

Last published check: 9 Oct 2026, 15:11. Check the council record for more recent changes.

Application location

UNIT 2, STRATEGIC PARK, COMINES WAY, HEDGE END

This record has no verified map location.

Application summary

Status
Decided Prior Approval Granted
Application type
Prior notification
Received
13 Oct 2022
Validated
14 Oct 2022
Determination deadline
25 Nov 2022
Local authority
Eastleigh Borough Council

Application overview

Prior notification for the installation of 1,021 roof mounted photovoltaic panels on non-domestic building.

Proposal details

Reference
PN/22/93982
Alternative references
11614660
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
Vision Architects (Mr Adrian Crees)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
PN-22-93982 Unit 2, Strategic Park, Comines WayOfficer Report · PDF15 Nov 2022View
PN_22_93982 PL_Final DecisionDecision Notice · PDF15 Nov 2022View
22009-A-PL-030-RevB (Proposed Site Layout-Roof Plan)Plan · PDF21 Oct 2022View
22009-A-PL-025-RevB (Existing Site Layout-Roof Plan)Plan · PDF21 Oct 2022View
22009-A-PL-036-RevA (Existing & Proposed Sections)Plan · PDF21 Oct 2022View
Proposed Site Layout-Roof PlanRoof Plan · PDF13 Oct 2022View
Existing Site Layout-Roof PlanRoof Plan · PDF13 Oct 2022View
Block PlanBlock Plan · PDF13 Oct 2022View
Proposed Elevations PlansElevations Plan · PDF13 Oct 2022View
Application Form RedactedApplication Form · PDF13 Oct 2022View
Location PlanLocation Plan · PDF13 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior Approval Granted
PN_22_93982 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: • Location Plan: 22009-A-PL-021 Rev A • Block Plan: 22009-A-PL-022 Rev A • Existing Site Layout/ Roof Plan: 22009-A-PL-025 Rev B • Proposed Site Layout/ Roof Plan: 22009-A-PL-030 Rev B • Proposed Elevations: 22009-A-PL-035 Rev A • Existing & Proposed Sections: 22009-A-PL-036 Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. No construction work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by construction works, including measures to prevent mud on the highway; b) a scheme for controlling noise a construction activities and implement Best Practicable Means of control ; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. Reason: To limit the impact the development has on the amenity of the locality
  3. In the event that the development hereby permitted becomes redundant or not required for the purpose permitted, then the development and all the associated equipment shall be removed from site within three months. Reason: In the interests of visual amenity.
  4. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.