Council planning record

Installation of 870no. photovoltaic panels on roof.

UNIT 1, STRATEGIC PARK, COMINES WAY, HEDGE END, SOUTHAMPTON, SO30 4DA

Decided Prior Approval GrantedReference: PN/22/93517Eastleigh Borough Council

Application location

UNIT 1, STRATEGIC PARK, COMINES WAY, HEDGE END, SOUTHAMPTON, SO30 4DA

This record has no verified map location.

Application summary

Status
Decided Prior Approval Granted
Application type
Prior notification
Received
27 Jul 2022
Validated
8 Aug 2022
Determination deadline
3 Oct 2022
Local authority
Eastleigh Borough Council

Application overview

Installation of 870no. photovoltaic panels on roof.

Proposal details

Reference
PN/22/93517
Alternative references
11426273
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
Vision Architects (Mr Adrian Crees)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
ParishConsultation Response8 Sept 2022View
PN_22_93517 Delegated Officer ReportOfficer Report · PDF6 Sept 2022View
PN_22_93517 PL_Final DecisionDecision Notice · PDF6 Sept 2022View
Southampton AirportConsultation Response30 Aug 2022View
Tree OfficerConsultation Response18 Aug 2022View
Environmental HealthConsultation Response15 Aug 2022View
Proposed ElevationsElevations Plan · PDF8 Aug 2022View
Existing Site Layout-Roof PlanSite Layout Plan · PDF8 Aug 2022View
Proposed Site LayoutSite Layout Plan · PDF27 Jul 2022View
Block PlanBlock Plan · PDF27 Jul 2022View
Location PlanLocation Plan · PDF27 Jul 2022View
Application Form RedactedApplication Form · PDF27 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior Approval Granted
PN_22_93517 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 22012-A-PL-001 Rev A, 22012-A-PL-002 Rev A, 22012-A-PL-008 Rev A, 22012-A-PL-010 Rev A and 22012-A-PL-015 Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. In the event that the development hereby permitted becomes redundant or not required for the purpose permitted, then the development and all the associated equipment shall be removed from site within three months. Reason: In the interests of visual amenity.
  3. No construction work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by construction works, including measures to prevent mud on the highway; b) a scheme for controlling noise a construction activities and implement Best Practicable Means of control ; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. Reason: To limit the impact the development has on the amenity of the locality
  4. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.