Council planning record

Change of use from Commercial, Business and Service (use Class E) to Dwellinghouse (use Class C3).

25 SHAFTESBURY AVENUE, CHANDLER'S FORD, EASTLEIGH, SO53 3BR

Decided Prior Approval GrantedReference: PN/22/93015Eastleigh Borough Council

Application location

25 SHAFTESBURY AVENUE, CHANDLER'S FORD, EASTLEIGH, SO53 3BR

This record has no verified map location.

Application summary

Status
Decided Prior Approval Granted
Application type
Prior notification
Received
6 May 2022
Validated
30 May 2022
Determination deadline
25 Jul 2022
Local authority
Eastleigh Borough Council

Application overview

Change of use from Commercial, Business and Service (use Class E) to Dwellinghouse (use Class C3).

Proposal details

Reference
PN/22/93015
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
Unsted Design Ltd (Mr Michael Unsted)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
PN_22_93015 PL_Final DecisionDecision Notice · PDF19 Jul 2022View
PN-22-93015 25 Shaftesbury AvenueOfficer Report · PDF19 Jul 2022View
Proposed Elevations & Floor Plan · PDF30 May 2022View
Proposed Site Plan · PDF30 May 2022View
Application Form RedactedApplication Form · PDF6 May 2022View
Location PlanLocation Plan · PDF8 Oct 2021View
Existing Elevations & PlansElevations And Floor Plan · PDF8 Oct 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior Approval Granted
PN_22_93015 PL_Final Decision
Planning conditions
  1. No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) the arrangements for the routing/ turning of lorries and details for construction traffic access to the site; b) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); f) provision for storage, collection, and disposal of rubbish from the development during construction period; g) measures to prevent mud and dust on the highway during demolition and construction; h) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; i) temporary lighting; j) protection of pedestrian routes during construction; Reason: To limit the impact the development has on the amenity of the locality
  2. Prior to occupation, a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard surfacing and soft landscaping, including ecology enhancements, boundary treatments, and lighting and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard within 3 months of occupation. Reason: In the interests of amenity and to provide ecology enhancements on site.
  3. The development hereby permitted shall be implemented in accordance with the following plans numbered: • Existing Floor Plans and Elevations 001 OGDEN EX1306 • Location Plan 007 OGDEN LP-1306 • Site Plan 009 OGDEN SP-1306 • Proposed Floor Plans and Elevations (Natural Light Illustration0 010 OGDEN PR1306 Reason: For the avoidance of doubt and in the interests of proper planning.
  4. Note to Applicant: Development under Class MA is permitted subject to the condition that it must be completed within a period of 3 years starting with the prior approval date.
  5. Note to Applicant: It is a requirement that the applicant satisfies their obligations under Regulations 77 of the Conservation of Habitats and Species Regulations 2017 (as amended), in strict accordance with Article 3(1) of the Town and Country Planning (General Permitted Development) Order 2015 (as amended). Failure to comply with this will mean that the development will have been unlawfully implemented. In this instance appropriate mitigation is required to offset the development's impacts on the European Protected Site, in terms of additional recreational pressure (to the New Forest), and additional output of nutrients (nitrates and phosphates) arising from a net gain of residential accommodation. Development must not commence until the Local Planning Authority has given its written approval for the development and appropriate mitigation has been secured against the developments harmful impacts on the European Protected Site(s). Further information on Eastleigh Borough Council’s Schemes are available: Nitrates & Phosphates: https://www.eastleigh.gov.uk/planning-and-building/nutrient-offset-schemes#:~:text=The%20Council's%20nitrate%20offer,our%20legal%20and%20administrative%20costs. New Forest: https://www.eastleigh.gov.uk/media/5441/update-doc-4c-new-forest-interim-mitigation.pdf
  6. Note to Applicant: In the extremely unlikely event that a bat is found should permission be granted, works should stop immediately and Natural England informed: https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  7. Note to Applicant: The Council confirms that in assessing this planning application it has worked with the applicant in a positive and proactive way, in line with the requirements of paragraph 38 of the National Planning Policy Framework 2021.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.