Council planning record

Outline application: Erection of 1.no 3-bedroom dwelling with associated parking following the demolition of existing outbuildings. Access from Kanes Hill to rear of ‘Cherry Trees’. (All matters reserved).

CHERRY TREES, KANES HILL, SOUTHAMPTON, SO19 6AH

ValidReference: O/26/101904Eastleigh Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Valid
Application type
Outline planning
Received
10 Aug 2026
Validated
17 Aug 2026
Determination deadline
12 Oct 2026
Local authority
Eastleigh Borough Council

Application overview

Outline application: Erection of 1.no 3-bedroom dwelling with associated parking following the demolition of existing outbuildings. Access from Kanes Hill to rear of ‘Cherry Trees’. (All matters reserved).

Proposal details

Reference
O/26/101904
Alternative references
15093568
Ward
West End South Ward
Parish
West End CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

CHERRY TREES, KANES HILL, SOUTHAMPTON, SO19 6AH

This record has no verified map location.

Documents 12 of 12

DocumentPublishedAction
Environmental HealthConsultation Response · PDF7 Oct 2026View
NE Response 558205 O_26_101904Consultation Response · PDF29 Sept 2026View
AMENDED Indicative Site Layout PlanSite Layout Plan · PDF14 Sept 2026View
Ecology response 8 9 26 for O 26 101904 CHERRY TREES, KANES HILL, SOUTHAMPTON, SO19 6AHConsultee Response · PDF8 Sept 2026View
Consultation Response Letter from Hampshire HighwaysConsultation Response · PDF7 Sept 2026View
Habitat Regulation AssessmentSupporting Documents · PDF2 Sept 2026View
Ecology response for O 26 101904 CHERRY TREES, KANES HILL, SOUTHAMPTON, SO19 6AHConsultee Response · PDF2 Sept 2026View
Ecology response for O 26 101904 CHERRY TREES, KANES HILL, SOUTHAMPTON, SO19 6AHConsultee Response · PDF1 Sept 2026View
Cherry Trees - Nutrient_Calculator_Solent_Maritime_V_03_01_3Supporting Documents15 Aug 2026View
Location PlanLocation Plan · PDF10 Aug 2026View
Location PlanLocation Plan · PDF10 Aug 2026View
Application Form REDACTEDApplication Form · PDF10 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Not yet determined
Planning conditions
  1. No development shall start on site until the access, including the footway and/or verge crossing shall be widened to a minimum of 4.8m to enable two-way vehicle flows in and out of the site. Reason: To provide satisfactory access and in the interests of highway safety.
  2. No development shall start on site until a construction site management plan has been submitted to and approved in writing by the Planning Authority, which shall include: (a) A programme of and phasing of demolition (if any) and construction work; (b) The provision of long term facilities for contractor parking; (c) The arrangements for deliveries associated with all construction works; (d) Access and egress for plant and machinery; (e) Protection of pedestrian routes during construction; (f) Location of temporary site buildings, compounds, construction material, and plant storage areas; (g) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e. wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process. Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.