Council planning record

Hybrid Planning Application - Outline application for development of the land adjacent to Southampton Airport to provide employment floorspace of up to 92,000 sqm (GIA) within Use Classes E(g) (ii & iii), B2 and B8 with ancillary offices and areas for service yards, car parking, landscaping, ancillary buildings and associated activities, and access from Wide Lane (all matters reserved except for access). Full planning application for initial infrastructure works and construction of new access road including site levelling and other engineering works. This application is subject to an Environmental Impact Assessment and is accompanied by an Environmental Statement.

Navigator Quarter, Eastleigh, SO18 2NL

ValidReference: O/25/99506Eastleigh Borough Council

Last published check: 13 Oct 2026, 04:25. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Valid
Application type
Outline planning
Received
5 Jun 2025
Validated
17 Jul 2025
Determination deadline
30 Jun 2026
Local authority
Eastleigh Borough Council

Application overview

Hybrid Planning Application - Outline application for development of the land adjacent to Southampton Airport to provide employment floorspace of up to 92,000 sqm (GIA) within Use Classes E(g) (ii & iii), B2 and B8 with ancillary offices and areas for service yards, car parking, landscaping, ancillary buildings and associated activities, and access from Wide Lane (all matters reserved except for access). Full planning application for initial infrastructure works and construction of new access road including site levelling and other engineering works. This application is subject to an Environmental Impact Assessment and is accompanied by an Environmental Statement.

Proposal details

Reference
O/25/99506
Alternative references
13865041-m/d
Ward
Eastleigh Central Ward;Eastleigh South Ward
Parish
Eastleigh Town CP
Agent
MSA (Mr Jamie Loxley)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Navigator Quarter, Eastleigh, SO18 2NL

This record has no verified map location.

Documents 443 of 443

DocumentPublishedAction
AMENDED Travel PlanSupporting Documents · PDF22 Jun 2026View
HCC Flood & WaterConsultation Response · PDF18 Jun 2026View
HCC Highways re: A335/ Wide Lane Junction - Signal Mitigation - Modelling Technical Note and Amended Framework Travel PlanConsultation Response · PDF9 Jun 2026View
National Highways - Travel PlanConsultation Response · PDF29 May 2026View
AMENDED Surface Water Calculations North Plot rev 3Drainage Report · PDF21 May 2026View
AMENDED Surface Water Calculations South Plot rev 3Drainage Report · PDF21 May 2026View
Response to Additional LLFA CommentsDrainage Report · PDF21 May 2026View
AMENDED Indicative Drainage Layout 2Drainage Plan · PDF21 May 2026View
AMENDED Proposed Catchment PlanDrainage Plan · PDF21 May 2026View
Covering email from Applicant's Transport Consultant with list of revisions to Framework Travel PlanSupporting Documents · PDF18 May 2026View
A335/ Wide Lane Junction - Signal Mitigation - Modelling Technical NoteSupporting Documents · PDF12 May 2026View
Geo-Environmental Assessment_redactedSupporting Documents · PDF11 May 2026View
Committee MinutesCommittee Report · PDF24 Apr 2026View
HCC Flood & WaterConsultation Response · PDF21 Apr 2026View
Committee Update SheetCommittee Report · PDF15 Apr 2026View
AMENDED Indicative Drainage LayoutDrainage Plan · PDF13 Apr 2026View
AMENDED Flood Risk Assessment and Drainage Strategy - Part 6Supporting Documents · PDF13 Apr 2026View
AMENDED Flood Risk Assessment and Drainage Strategy - Part 4Supporting Documents · PDF13 Apr 2026View
Natural EnglandConsultation Response · PDF13 Apr 2026View
SUPERSEDED Indicative Drainage Layout 2Drainage Plan · PDF13 Apr 2026View
AMENDED Flood Risk Assessment and Drainage Strategy - Part 1_redactedSupporting Documents · PDF13 Apr 2026View
AMENDED Flood Risk Assessment and Drainage Strategy - Part 2_redactedSupporting Documents · PDF13 Apr 2026View
AMENDED Flood Risk Assessment and Drainage Strategy - Part 5Supporting Documents · PDF13 Apr 2026View
AMENDED Flood Risk Assessment and Drainage Strategy - Part 3Supporting Documents · PDF13 Apr 2026View
Proposed Access Road: Future Northern ConnectionPlan · PDF10 Apr 2026View
National Highways_redactedConsultation Response · PDF10 Apr 2026View
Sustainable TransportConsultation Response · PDF7 Apr 2026View
EcologyConsultation Response · PDF7 Apr 2026View
Committee ReportCommittee Report · PDF7 Apr 2026View
LandscapeConsultation Response · PDF7 Apr 2026View
AMENDED Parameters PlanPlan · PDF2 Apr 2026View
AMENDED Illustrative Site Layout Plan 1Plan · PDF2 Apr 2026View
AMENDED Illustrative Site Layout Plan 2Plan · PDF2 Apr 2026View
Technical Note re: 20,000 sqm Unfettered Floorspace – Wide Lane Roundabout Junction Modelling AssessmentSupporting Documents · PDF2 Apr 2026View
Response from agent to Sustainable Transport consultation responseSupporting Documents · PDF1 Apr 2026View
Technical Note re: Pre-Committee Highways/Transport CommentsSupporting Documents · PDF1 Apr 2026View
Sustainable TransportConsultation Response · PDF30 Mar 2026View
Illustrative Masterplan Landscape Sections - Parameter ComparisonLandscape Plan · PDF27 Mar 2026View
Ecology Note re: reptile corridor_redactedSupporting Documents · PDF27 Mar 2026View
SUPERSEDED Parameters PlanPlan · PDF27 Mar 2026View
SUPERSEDED Illustrative Site Layout Plan 2Site Layout Plan · PDF27 Mar 2026View
SUPERSEDED Illustrative Site Layout Plan 1Site Layout Plan · PDF27 Mar 2026View
Ecology Note re: reptile corridor_redactedSupporting Documents · PDF27 Mar 2026View
LandscapeConsultation Response · PDF26 Mar 2026View
HCC HighwaysConsultation Response · PDF26 Mar 2026View
Urban DesignConsultation Response · PDF26 Mar 2026View
EcologyConsultation Response · PDF25 Mar 2026View
SUPERSEDED Surface Water Calculations NorthDrainage Report · PDF24 Mar 2026View
Response from agent to Ecology & Landscape commentsSupporting Documents · PDF24 Mar 2026View
HRA Appropriate AssessmentEnvironmental Assessment · PDF24 Mar 2026View
SUPERSEDED Indicative Drainage Layout 2Drainage Plan · PDF24 Mar 2026View
Response to Additional LLFA CommentsDrainage Report · PDF24 Mar 2026View
SUPERSEDED Surface Water Calculations South PlotDrainage Report · PDF24 Mar 2026View
SUPERSEDED Proposed Catchment PlanDrainage Plan · PDF24 Mar 2026View
Urban DesignConsultation Response · PDF20 Mar 2026View
LandscapeConsultation Response18 Mar 2026View
HCC Flood & WaterConsultation Response · PDF18 Mar 2026View
Southampton City CouncilConsultation Response · PDF17 Mar 2026View
Network RailConsultation Response · PDF12 Mar 2026View
EcologyConsultation Response · PDF12 Mar 2026View
HCC HighwaysConsultation Response · PDF6 Mar 2026View
TreesConsultation Response · PDF3 Mar 2026View
Natural EnglandConsultation Response · PDF2 Mar 2026View
Copy of Natural England's response of 20.11.25Consultation Response · PDF2 Mar 2026View
Environmental Health - Outline CEMPConsultation Response · PDF2 Mar 2026View
RamblersConsultation Response · PDF27 Feb 2026View
SUPERSEDED Flood Risk Assessment and Drainage Strategy - Part 1_redactedSupporting Documents · PDF18 Feb 2026View
AMENDED Detailed / Outline Boundary PlanPlan · PDF17 Feb 2026View
ADDITIONAL Environmental Statement Addendum (includes Outline CEMP) - February 2026 - Part 3Environmental Assessment · PDF17 Feb 2026View
AMENDED Mitchell Way Highway GA Sheet 1Plan · PDF17 Feb 2026View
SUPERSEDED Flood Risk Assessment and Drainage Strategy - Part 6Supporting Documents · PDF17 Feb 2026View
AMENDED Location PlanLocation Plan · PDF17 Feb 2026View
SUPERSEDED Flood Risk Assessment and Drainage Strategy - Part 3Supporting Documents · PDF17 Feb 2026View
AMENDED Mitchell Way Proposed Kerbing Layout Sheet 1Plan · PDF17 Feb 2026View
AMENDED Arboricultural Impact Assessment DrawingsSupporting Documents · PDF17 Feb 2026View
ADDITIONAL Planning and Design Addendum - February 2026_redactedSupporting Documents · PDF17 Feb 2026View
ADDITIONAL Existing Catchment PlanDrainage Plan · PDF17 Feb 2026View
AMENDED Illustrative Masterplan Landscape SectionsLandscape Plan · PDF17 Feb 2026View
Amended Application Form_RedactedApplication Form · PDF17 Feb 2026View
Mitchell Way Highway GA Sheet 3Plan · PDF17 Feb 2026View
SUPERSEDED Indicative Drainage LayoutDrainage Plan · PDF17 Feb 2026View
AMENDED Illustrative Masterplan Landscape ProposalsLandscape Plan · PDF17 Feb 2026View
SUPERSEDED Flood Risk Assessment and Drainage Strategy - Part 5Supporting Documents · PDF17 Feb 2026View
AMENDED Mitchell Way Proposed Finished Levels Sheet 1Plan · PDF17 Feb 2026View
AMENDED Mitchell Way Proposed Site Clearance Sheet 1Plan · PDF17 Feb 2026View
SUPERSEDED Flood Risk Assessment and Drainage Strategy - Part 2_redactedSupporting Documents · PDF17 Feb 2026View
AMENDED Mitchell Way Pavement Construction Sheet 1Plan · PDF17 Feb 2026View
AMENDED BNG Metric 13.02.26Environmental Assessment17 Feb 2026View
ADDITIONAL Ecology Response Letter - February 2026_redactedEcological Assessment · PDF17 Feb 2026View
ADDITIONAL Environmental Statement Addendum - February 2026 - Part 2Environmental Assessment · PDF17 Feb 2026View
SUPERSEDED Indicative Drainage Layout 2Drainage Plan · PDF17 Feb 2026View
SUPERSEDED Flood Risk Assessment and Drainage Strategy - Part 4Supporting Documents · PDF17 Feb 2026View
AMENDED Mitchell Way Pavement Construction Sheet 3Plan · PDF17 Feb 2026View
ADDITIONAL Environmental Statement Addendum - February 2026 - Part 1_redactedEnvironmental Assessment · PDF17 Feb 2026View
Active Travel EnglandConsultation Response · PDF3 Feb 2026View
Proposed Spitfire Roundabout Mitigation - Stage 1 Road Safety Audit_redactedSupporting Documents · PDF30 Jan 2026View
Covering email from Applicant's Transport Consultant with Stage 1 Road Safety Audits_redactedCorrespondence Incoming30 Jan 2026View
Ecology - Widening of Mitchell Way, Estate Road Alignment, Narrowing of Wildlife CorridorConsultation Response · PDF30 Jan 2026View
Ecology - Outline CEMPConsultation Response · PDF30 Jan 2026View
Proposed Wide Lane Junction Mitigation - Stage 1 Road Safety Audit_redactedSupporting Documents · PDF30 Jan 2026View
Environmental Health - NoiseConsultation Response · PDF28 Jan 2026View
Environmental Health - Air QualityConsultation Response · PDF28 Jan 2026View
Wide Lane Mitigation_SigFinal_v3 - Basic Results SummarySupporting Documents · PDF27 Jan 2026View
Ecology - Air QualityConsultation Response · PDF26 Jan 2026View
Covering email from agent re Noise LevelsSupporting Documents · PDF22 Jan 2026View
Additional information re: Noise LevelsSupporting Documents · PDF22 Jan 2026View
National Highways Holding Response (Redacted)Consultation Response · PDF15 Jan 2026View
31. Post Application Highways Transport Comments - Technical Response Appendix DD (M27 J5 Merge and Diverge Assessment Technical Note)_UpdatedSupporting Documents · PDF13 Jan 2026View
24. Post Application Highways Transport Comments - Technical Response Appendix W (Chickenhall Lane Connection - Layout and Specification)_UpdatedSupporting Documents · PDF13 Jan 2026View
18. Post Application Highways Transport Comments - Technical Response Appendix Q (Emergency Vehicle Access Route AGS)_UpdatedSupporting Documents · PDF13 Jan 2026View
9. Post Application Highways Transport Comments - Technical Response Appendix H (Departure from Standard – Mitchell Way South)_Updated_RedactedSupporting Documents · PDF13 Jan 2026View
11. Post Application Highways Transport Comments - Technical Response Appendix J (Stage 1 RSA 2 (September 2025))_Updated_RedactedSupporting Documents · PDF13 Jan 2026View
20. Post Application Highways Transport Comments - Technical Response Appendix S (Junction mitigation designs)_UpdatedSupporting Documents · PDF13 Jan 2026View
Southampton City CouncilConsultation Response · PDF12 Jan 2026View
7. Post Application Highways Transport Comments - Technical Response Appendix F (Wide Lane Bridge Improvement Drawings)Supporting Documents · PDF31 Dec 2025View
Stoneham Way / Wide Lane traffic signals and Mansbridge Road roundabout (J07) update PM_v02 - Linsig Basic Results SummarySupporting Documents · PDF24 Dec 2025View
Stoneham Way / Wide Lane traffic signals and Mansbridge Road roundabout (J07) update AM_v02 - Linsig Basic Results SummarySupporting Documents · PDF24 Dec 2025View
Modelling Technical Note for Southampton City Council - 24 Dec 2025Supporting Documents · PDF24 Dec 2025View
10. Post Application Highways Transport Comments - Technical Response Appendix I (Stage 1 Road Safety Audit (RSA) 1 (June 2025))_RedactedSupporting Documents · PDF23 Dec 2025View
12. Post Application Highways Transport Comments - Technical Response Appendix K (Stage 1 RSA 3 (November 2025))_RedactedSupporting Documents · PDF23 Dec 2025View
Urban Design - alternative additional car parking provisionConsultation Response · PDF23 Dec 2025View
28. Post Application Highways Transport Comments - Technical Response Appendix AA_10 (App I Proposed Masterplan Highway)Supporting Documents · PDF23 Dec 2025View
14. Post Application Highways Transport Comments - Technical Response Appendix M (Updated Masterplan Highways Drawings)Supporting Documents · PDF23 Dec 2025View
15. Post Application Highways Transport Comments - Technical Response Appendix N (Internal Masterplan Swept Path Analysis)Supporting Documents · PDF23 Dec 2025View
3. Post Application Highways Transport Comments - Technical Response Appendix B (Additional PIA Location Details and Data)Supporting Documents · PDF23 Dec 2025View
17. Post Application Highways Transport Comments - Technical Response Appendix P (MSA Technical Note on New Estate Road)Supporting Documents · PDF23 Dec 2025View
SUPERSEDED 28. Post Application Highways Transport Comments - Technical Response Appendix AA_1 (Updated Travel Plan)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_7 (App O)Supporting Documents · PDF23 Dec 2025View
29. Post Application Highways Transport Comments - Technical Response Appendix BB (Mitchell Way East Airport Car Note (Nov 2025)Supporting Documents · PDF23 Dec 2025View
13. Post Application Highways Transport Comments - Technical Response Appendix L (Mitchell Way S-bend Swept Path Analysis)Supporting Documents · PDF23 Dec 2025View
28. Post Application Highways Transport Comments - Technical Response Appendix AA_6 (App E Wide Bridge Lane Bridge Alignment)Supporting Documents · PDF23 Dec 2025View
19. Post Application Highways Transport Comments - Technical Response Appendix R (Itchen Way Access – Ecological Constraints)Supporting Documents · PDF23 Dec 2025View
16. Post Application Highways Transport Comments - Technical Response Appendix O (Example Layouts of Pedestrian Access)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_1 (Highways Modelling Technical Note)Supporting Documents · PDF23 Dec 2025View
28. Post Application Highways Transport Comments - Technical Response Appendix AA_4 (App C Mitchell Way Alignment)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_5_b (App M part 2)Supporting Documents · PDF23 Dec 2025View
4. Post Application Highways Transport Comments - Technical Response Appendix C (Stoneham Lane Route Assessment)Supporting Documents · PDF23 Dec 2025View
25. Post Application Highways Transport Comments - Technical Response Appendix X (MSA Note on Draft Land Use)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_2_a (App E part 1)Supporting Documents · PDF23 Dec 2025View
21. Post Application Highways Transport Comments - Technical Response Appendix T (Correspondence with HCC ITS Team)Supporting Documents · PDF23 Dec 2025View
6. Post Application Highways Transport Comments - Technical Response Appendix E (Healthy Streets Approach and Report)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_4 (Apps I,J,K,L)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_6_a (App N part 1)Supporting Documents · PDF23 Dec 2025View
27. Post Application Highways Transport Comments - Technical Response Appendix Z (TEMPro Factor Email Correspondence)Supporting Documents · PDF23 Dec 2025View
28. Post Application Highways Transport Comments - Technical Response Appendix AA_3 (App B MRF Site Layout)Supporting Documents · PDF23 Dec 2025View
30. Post Application Highways Transport Comments - Technical Response Appendix CC: Network Rail (ASPRO) Correspondence regarding Active Travel LinksSupporting Documents · PDF23 Dec 2025View
28. Post Application Highways Transport Comments - Technical Response Appendix AA_8 (App G Proposed Mitchell Way Improvements)Supporting Documents · PDF23 Dec 2025View
28. Post Application Highways Transport Comments - Technical Response Appendix AA_7 (App F Public Rights of Way)Supporting Documents · PDF23 Dec 2025View
26. Post Application Highways Transport Comments - Technical Response Appendix Y (Stoneham Lane Route Assessment)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_5_a (App M part 1)Supporting Documents · PDF23 Dec 2025View
28. Post Application Highways Transport Comments - Technical Response Appendix AA_5 (App D Mitchell Way Highway Boundary)Supporting Documents · PDF23 Dec 2025View
8. Post Application Highways Transport Comments - Technical Response Appendix G_2Supporting Documents · PDF23 Dec 2025View
2. Post Application Highways Transport Comments - Technical Response Appendix A_2 (Highway General Arrangement Option 6)Supporting Documents · PDF23 Dec 2025View
22. Post Application Highways Transport Comments - Technical Response Appendix U (PV² Assessment of Spitfire Roundabout)Supporting Documents · PDF23 Dec 2025View
5. Post Application Highways Transport Comments - Technical Response Appendix D (Updated GIS Catchment Maps)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_6_b (App N part 2)Supporting Documents · PDF23 Dec 2025View
2. Post Application Highways Transport Comments - Technical Response Appendix A_1 (Illustrative Site Plan - Layout Plan 2)Supporting Documents · PDF23 Dec 2025View
8. Post Application Highways Transport Comments - Technical Response Appendix G_1 (Mitchell Way (South) Improvement Drawings)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_3 (Apps F,G,H)Supporting Documents · PDF23 Dec 2025View
23. Post Application Highways Transport Comments - Technical Response Appendix V_2_b (App E part 2)Supporting Documents · PDF23 Dec 2025View
28. Post Application Highways Transport Comments - Technical Response Appendix AA_9 (App H Proposed Masterplan primary Spine Road Drawing)Supporting Documents · PDF23 Dec 2025View
1. Post Application Highways Transport Comments - Technical Response (inc ES Conformity Note)_RedactedSupporting Documents · PDF23 Dec 2025View
8. Post Application Highways Transport Comments - Technical Response Appendix G_3Supporting Documents · PDF23 Dec 2025View
Impact Plan for Great Crested Newt District Licensing (dated 2.10.25)Supporting Documents · PDF19 Dec 2025View
NatureSpace Best Practice Principles for Great Crested Newts District Licensing Scheme - March 2021Supporting Documents · PDF19 Dec 2025View
NatureSpace Great Crested Newt District Licence ReportSupporting Documents · PDF19 Dec 2025View
HCC Highways - Outline CEMPConsultation Response · PDF18 Dec 2025View
HCC Highways - Emergency AccessConsultation Response · PDF16 Dec 2025View
Policy - Alternative Airport ParkingConsultation Response · PDF15 Dec 2025View
Response from agent re: need for widening of Mitchell Way to westSupporting Documents · PDF11 Dec 2025View
Airport Car Park NoteSupporting Documents · PDF8 Dec 2025View
Environmental Health - Air QualityConsultation Response · PDF8 Dec 2025View
Hampshire and Isle of Wight Fire & Rescue ServiceConsultation Response5 Dec 2025View
Hampshire and Isle of Wight Fire & Rescue Service advice in respect of HMOs and of Planning Applications not involving higher risk premisesConsultation Response5 Dec 2025View
Response from agent re: potential for southern access roadSupporting Documents · PDF5 Dec 2025View
Post Application National Highways Comments – Technical Response - Appendix G (2)Supporting Documents27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App GSupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App C6Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix G (1)Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix B (1)Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix ESupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App C4Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App C2Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix F (3)Supporting Documents27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix D App 2Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App F_FutureSupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix ASupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App C1Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App FSupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix DSupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App BSupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix CSupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App C3Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App DSupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix F (2)Supporting Documents27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App C5Supporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical ResponseSupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix F (1)Supporting Documents27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix C - App ASupporting Documents · PDF27 Nov 2025View
Post Application National Highways Comments – Technical Response - Appendix D App 1Supporting Documents · PDF27 Nov 2025View
ADDITIONAL Emergency Access NoteSupporting Documents · PDF26 Nov 2025View
National Highways - Outline CEMPConsultation Response26 Nov 2025View
TreesConsultation Response · PDF26 Nov 2025View
Email correspondence from agent re: alternative pedestrian & cycle accesses_redactedSupporting Documents25 Nov 2025View
Natural England - Outline CEMPConsultation Response · PDF20 Nov 2025View
Natural England - Annex A NE General AdviceConsultation Response · PDF20 Nov 2025View
Environmental Health - Outline CEMPConsultation Response · PDF11 Nov 2025View
ADDITIONAL New Estate Road Alignment NoteSupporting Documents · PDF10 Nov 2025View
ADDITIONAL Itchen Navigation Access NoteSupporting Documents · PDF10 Nov 2025View
AMENDED ES (Volume 3) Technical Annex H - Outline Construction and Environmental Management Plan - November 2025Environmental Assessment · PDF6 Nov 2025View
Environmental Health - NoiseConsultation Response · PDF5 Nov 2025View
LandscapeConsultation Response · PDF24 Oct 2025View
RamblersConsultation Response · PDF23 Oct 2025View
National Highways_RedactedConsultation Response · PDF23 Oct 2025View
HCC Highways re: Outline CEMPConsultation Response · PDF21 Oct 2025View
ADDITIONAL Air Quality Technical Note - Version 1Supporting Documents · PDF20 Oct 2025View
AMENDED Noise Impact Assessment rev 2Noise Report · PDF20 Oct 2025View
HCC Flood & WaterConsultation Response · PDF14 Oct 2025View
NatureSpaceConsultation Response9 Oct 2025View
HSE Consultation 2Consultation Response · PDF6 Oct 2025View
SUPERSEDED ES (Volume 3) Technical Annex H - Outline Construction and Environmental Management Plan - October 2025Environmental Assessment · PDF6 Oct 2025View
HSE Consultation 1Consultation Response · PDF6 Oct 2025View
EcologyConsultation Response · PDF1 Oct 2025View
Natural EnglandConsultation Response · PDF29 Sept 2025View
National Highways - revised Outline CEMPConsultation Response · PDF23 Sept 2025View
Environmental Health - Air QualityConsultation Response · PDF19 Sept 2025View
HCC Highways - Outline CEMPConsultation Response · PDF18 Sept 2025View
AMENDED Information for Habitat Regulations Assessment_RedactedSupporting Documents · PDF17 Sept 2025View
Southern Gas NetworkConsultation Response · PDF15 Sept 2025View
Southern Gas NetworkConsultation Response · PDF10 Sept 2025View
Environmental Health - Outline CEMPConsultation Response · PDF9 Sept 2025View
SGN - Safe working near high pressure gas pipelines guidelinesConsultation Response · PDF8 Sept 2025View
SGN (2)Consultation Response · PDF8 Sept 2025View
SGN (1)Consultation Response · PDF8 Sept 2025View
Eastleigh Town CouncilConsultation Response5 Sept 2025View
Southampton City CouncilConsultation Response · PDF5 Sept 2025View
Urban DesignConsultation Response · PDF4 Sept 2025View
Applicant's Response to LLFA CommentsDrainage Report · PDF2 Sept 2025View
SUPERSEDED Flood Risk Assessment and Drainage Strategy v5_RedactedFlood Risk Assessment · PDF2 Sept 2025View
ADDITIONAL Highways information re TEMPro factors assumptionsSupporting Documents · PDF2 Sept 2025View
AMENDED Proposed Link Road Drainage - Sheet 2Drainage Plan · PDF2 Sept 2025View
ADDITIONAL Existing Surface Water Flow RouteDrainage Plan · PDF2 Sept 2025View
ADDITIONAL Flood Exceedance PlanDrainage Plan · PDF2 Sept 2025View
SUPERSEDED Indicative Drainage LayoutDrainage Plan · PDF2 Sept 2025View
TreesConsultation Response · PDF2 Sept 2025View
Environmental Health - NoiseConsultation Response · PDF29 Aug 2025View
Economic DevelopmentConsultation Response · PDF19 Aug 2025View
Active Travel EnglandConsultation Response · PDF15 Aug 2025View
ADDITIONAL Navigator Quarter Modelling Technical Note_Post-Submission Version_2025 survey_FINAL_comments removedSupporting Documents · PDF14 Aug 2025View
HCC Countryside ServicesConsultation Response · PDF14 Aug 2025View
ADDITIONAL Documents Issued from Steer Aug 2025 to address National Highways commentsSupporting Documents · PDF14 Aug 2025View
Southampton AirportConsultation Response · PDF14 Aug 2025View
ADDITIONAL M27 Junction 5 Westbound Offslip HAS009 - As BuiltPlan · PDF13 Aug 2025View
ADDITIONAL Traffic Survey Data 16367 Southampton Queues Site 4 onlySupporting Documents13 Aug 2025View
ADDITIONAL Traffic Signals Stoneham Way / Gyratory As-Built Sheet 2 of 3Plan · PDF13 Aug 2025View
ADDITIONAL Traffic Survey Data - 16367 - Southampton CTC - Site 4 Stoneham InterchangeSupporting Documents13 Aug 2025View
ADDITIONAL LinSig M27-J5 - Basic Results Summary - WordSupporting Documents13 Aug 2025View
ADDITIONAL Traffic Signals M27 Eastbound Off Slip / Gyratory As-Built - Sheet 1 of 3Plan · PDF13 Aug 2025View
ADDITIONAL LinSig M27 Jct 5_ResultsSummary - ExcelSupporting Documents13 Aug 2025View
ADDITIONAL Traffic Survey Data 16367 Southampton Signals Times Survey Site 4Supporting Documents13 Aug 2025View
ADDITIONAL Traffic Survey Data 16367 Southampton Sat Flows Site 4Supporting Documents13 Aug 2025View
ADDITIONAL Interserve Construction As Built Traffic Signals General Arrangement - Sheet 1 of 2 (M27 J5)Plan · PDF13 Aug 2025View
ADDITIONAL Traffic Signals A335 Wide Lane / Gyratory Sheet 3 of 3Plan · PDF13 Aug 2025View
ADDITIONAL M27 Junction 5 E-Bnd Off-Slip / Stoneham Way / A335 Wide Lane - Eastleigh Site HAS008Supporting Documents · PDF13 Aug 2025View
ADDITIONAL M27 Junction 5 - Site Reference A202-A203Plan · PDF13 Aug 2025View
ADDITIONAL M27 Junction 5 Westbound Off Slip (HAS009)Supporting Documents · PDF13 Aug 2025View
ADDITIONAL Interserve Construction As Built Traffic Signals General Arrangement - Sheet 2 of 2 (M27 J5)Plan · PDF13 Aug 2025View
Natural EnglandConsultation Response · PDF11 Aug 2025View
HCC Flood & WaterConsultation Response · PDF11 Aug 2025View
HCC Countryside ServiceConsultation Response · PDF8 Aug 2025View
Environmental Health - Contaminated LandConsultation Response · PDF8 Aug 2025View
HCC HighwaysConsultation Response · PDF8 Aug 2025View
HeritageConsultation Response · PDF7 Aug 2025View
Network Rail_redactedConsultation Response · PDF7 Aug 2025View
Network Rail Asset Protection InformativesConsultation Response · PDF7 Aug 2025View
NatureSpace re: Great Crested NewtsConsultation Response · PDF4 Aug 2025View
National Highways_redactedConsultation Response1 Aug 2025View
PolicyConsultation Response · PDF31 Jul 2025View
Neighbourhoods and Green Spaces - Public Open SpacesConsultation Response · PDF31 Jul 2025View
HCC Minerals & WasteConsultation Response · PDF28 Jul 2025View
Southern Water - key to mapConsultation Response25 Jul 2025View
Lineseach Initial EnquiryConsultation Response · PDF23 Jul 2025View
ToobConsultation Response23 Jul 2025View
SSE Networks - Guide to InterpretingConsultation Response · PDF23 Jul 2025View
Southern WaterConsultation Response · PDF23 Jul 2025View
SSE Networks MapsConsultation Response · PDF23 Jul 2025View
Covering email from SSE NetworksConsultation Response23 Jul 2025View
SGNConsultation Response23 Jul 2025View
SSE Networks Safety AdviceConsultation Response · PDF23 Jul 2025View
Southern Water MapConsultation Response · PDF23 Jul 2025View
SSE Networks LetterConsultation Response · PDF23 Jul 2025View
Public ArtConsultation Response · PDF21 Jul 2025View
HCC ArchaeologyConsultation Response · PDF18 Jul 2025View
SUPERSEDED BNG Metric 150725Ecological Assessment17 Jul 2025View
BNG Condition Assessment Sheet - Row 17 Other B-L Woodland PoorEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 12 Mixed Scrub PoorEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 2 Bare Ground 202507Ecological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 8 Hawthorn Scrub PoorEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 21 Wet Woodland ModerateEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 13 Modified Grassland PoorEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 18 Reedbeds ModerateEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 14 ONG ModerateEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 15 ONG PoorEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 11 Mixed Scrub ModerateEcological Assessment15 Jul 2025View
BNG On-site Baseline Habitats locationsEcological Assessment · PDF15 Jul 2025View
BNG Condition Assessment Sheet - Row 4 Blackthorn Scrub PoorEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 3 Blackthorn Scrub ModerateEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 23 Other BL Woodland GoodEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 10 Mixed Scrub GoodEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 20 Rud Eph ModerateEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 16 Other B-L Woodland ModerateEcological Assessment15 Jul 2025View
BNG Condition Assessment Sheet - Row 19 Reedbeds PoorEcological Assessment15 Jul 2025View
SUPERSEDED Detailed / Outline Boundary PlanPlan · PDF2 Jul 2025View
Drawing Schedule 02.07.25Supporting Documents · PDF2 Jul 2025View
Topographical Survey and Utility SurveyPlans · PDF27 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 1Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 6Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 9Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 14Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 4Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 5Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 15Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 18Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 12Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 7Environmental Assessment · PDF20 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 3Environmental Assessment · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 9Supporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex C -Archaeology Part 1 _RedactedEnvironmental Assessment · PDF5 Jun 2025View
Highway General Arrangement Option 5Plan · PDF5 Jun 2025View
BREEAM Communities Pre-Assessment Report rev 02Supporting Documents · PDF5 Jun 2025View
Mitchell Way Highway GA Sheet 3Plan · PDF5 Jun 2025View
ES (Volume 3) Technical Annex F - Landscape and Visual Impact Assessment Part 7Environmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex F - Landscape and Visual Impact Assessment Part 1Environmental Assessment · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 10Supporting Documents · PDF5 Jun 2025View
Proposed Link Road Levels Sheet 1Plan · PDF5 Jun 2025View
Mitchell Way Proposed Kerbing Layout Sheet 2Plan · PDF5 Jun 2025View
Tree Survey & Constraints PlanSupporting Documents · PDF5 Jun 2025View
Mitchell Way Pavement Construction Sheet 2Plan · PDF5 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 16Environmental Assessment · PDF5 Jun 2025View
Proposed Link Road Drainage Sheet 1Plan · PDF5 Jun 2025View
Proposed Link Road Levels Sheet 2Plan · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 8Supporting Documents · PDF5 Jun 2025View
Statement of Community Engagement_redactedSupporting Documents · PDF5 Jun 2025View
Proposed S106 Heads of TermsSupporting Documents · PDF5 Jun 2025View
Proposed Link Road Visibility Splays Sheet 1Plan · PDF5 Jun 2025View
Bird Hazard Management Plan_RedactedSupporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex E - Ecology Part 4_RedactedEnvironmental Assessment · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 4Supporting Documents · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 7Supporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex E - Ecology Part 6_RedactedEnvironmental Assessment · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 2_RedactedSupporting Documents · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 12Supporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex C -Archaeology Part 2Environmental Assessment · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 4Supporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex F - Landscape and Visual Impact Assessment Part 5Environmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex C - Archaeology Part 5Environmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 10Environmental Assessment · PDF5 Jun 2025View
Minerals Resource AssessmentSupporting Documents · PDF5 Jun 2025View
Outline Waste Management & Recycling StatementSupporting Documents · PDF5 Jun 2025View
SUPERSEDED Mitchell Way Pavement Construction Sheet 1Plan · PDF5 Jun 2025View
Application Form_RedactedApplication Form · PDF5 Jun 2025View
SUPERSEDED Illustrative Masterplan Landscape SectionsLandscape Plan · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 6Supporting Documents · PDF5 Jun 2025View
SUPERSEDED Proposed Link Road Drainage Sheet 2Drainage Plan · PDF5 Jun 2025View
SUPERSEDED Mitchell Way Highway GA Sheet 1Plan · PDF5 Jun 2025View
SUPERSEDED Mitchell Way Proposed Site Clearance Sheet 1Plan · PDF5 Jun 2025View
Utility SurveyPlan · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 2Supporting Documents · PDF5 Jun 2025View
Cover Letter_RedactedSupporting Documents · PDF5 Jun 2025View
SUPERSEDED Mitchell Way Proposed Finished Levels Sheet 1Plan · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 1_RedactedSupporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex B - Air QualityEnvironmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex C - Archaeology Part 4Environmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex F - Landscape and Visual Impact Assessment Part 3Environmental Assessment · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 3Supporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex F - Landscape and Visual Impact Assessment Part 2Environmental Assessment · PDF5 Jun 2025View
Proposed Plateau LevelsPlan · PDF5 Jun 2025View
Proposed Link Road Visibility Splays Sheet 3Plan · PDF5 Jun 2025View
Proposed Link Road Site Clearance Sheet 1Plan · PDF5 Jun 2025View
Preliminary Risk Assessment Part 3Supporting Documents · PDF5 Jun 2025View
Preliminary Risk Assessment Part 5Supporting Documents · PDF5 Jun 2025View
Mitchell Way Proposed Kerbing Layout Sheet 3Plan · PDF5 Jun 2025View
Proposed Wide Lane Bridge ImprovementsPlan · PDF5 Jun 2025View
Design and Access Statement_CompressedSupporting Documents · PDF5 Jun 2025View
Landscape and Ecological Management PlanSupporting Documents · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 5Supporting Documents · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 7Supporting Documents · PDF5 Jun 2025View
SUPERSEDED Indicative Drainage LayoutDrainage Plan · PDF5 Jun 2025View
SUPERSEDED Mitchell Way Proposed Kerbing Layout Sheet 1Plan · PDF5 Jun 2025View
Proposed Link Road Swept Path Analysis Sheet 2Plan · PDF5 Jun 2025View
SUPERSEDED Illustrative Masterplan Landscape ProposalsLandscape Plan · PDF5 Jun 2025View
Preliminary Risk Assessment Part 6Supporting Documents · PDF5 Jun 2025View
Preliminary Risk Assessment Part 4Supporting Documents · PDF5 Jun 2025View
Mitchell Way Proposed Site Clearance Sheet 2Plan · PDF5 Jun 2025View
Planning StatementPlanning Statement · PDF5 Jun 2025View
SUPERSEDED Habitats Regulation Assessment (HRA)_RedactedSupporting Documents · PDF5 Jun 2025View
SUPERSEDED Tree Survey & Arboricultural Impact Assessment rev A_RedactedSupporting Documents · PDF5 Jun 2025View
Preliminary Risk Assessment Part 1_RedactedSupporting Documents · PDF5 Jun 2025View
Obtrusive Lighting StrategySupporting Documents · PDF5 Jun 2025View
Mitchell Way Proposed Finished Levels Sheet 3Plan · PDF5 Jun 2025View
ES (Volume 3) Technical Annex F - Landscape and Visual Impact Assessment Part 4Environmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex E - Ecology Part 1_RedactedEnvironmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex C - Archaeology Part 3Environmental Assessment · PDF5 Jun 2025View
Proposed Link Road Site Clearance Sheet 2Plan · PDF5 Jun 2025View
Proposed Link Road Pavement Construction Sheet 2Plan · PDF5 Jun 2025View
Preliminary Risk Assessment Part 7Supporting Documents · PDF5 Jun 2025View
Wide Lane Bridge Vehicle TrackingPlan · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 6Supporting Documents · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 5Supporting Documents · PDF5 Jun 2025View
Proposed Link Road Visibility Splays Sheet 4Plan · PDF5 Jun 2025View
Proposed Link Road Kerbing Sheet 2Plan · PDF5 Jun 2025View
ES (Volume 3) Technical Annex E - Ecology Part 2Environmental Assessment · PDF5 Jun 2025View
SUPERSEDED Illustrative Site Layout PlanSite Layout Plan · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 1_RedactedSupporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex D - Climate ChangeEnvironmental Assessment · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 3Supporting Documents · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 11Supporting Documents · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 11Supporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 13Environmental Assessment · PDF5 Jun 2025View
Preliminary Risk Assessment Part 2Supporting Documents · PDF5 Jun 2025View
Mitchell Way Highway GA Sheet 2Plan · PDF5 Jun 2025View
Mitchell Way Proposed Site Clearance Sheet 3Plan · PDF5 Jun 2025View
Proposed Link Road Visibility Splays Sheet 2Plan · PDF5 Jun 2025View
Proposed Link Road Pavement Construction Sheet 1Plan · PDF5 Jun 2025View
ES (Volume 3) Technical Annex A - Scoping _RedactedEnvironmental Assessment · PDF5 Jun 2025View
Preliminary Sources Study Report (inc. UXO Report) Part 10Supporting Documents · PDF5 Jun 2025View
Geo-Environmental Assessment _RedactedSupporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex I - External Lighting StrategyEnvironmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex E - Ecology Part 3_RedactedEnvironmental Assessment · PDF5 Jun 2025View
Preliminary Risk Assessment Part Part 9Supporting Documents · PDF5 Jun 2025View
Preliminary Risk Assessment Part 8Supporting Documents · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 8Supporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex F - Landscape and Visual Impact Assessment Part 6Environmental Assessment · PDF5 Jun 2025View
Mitchell Way Proposed Finished Levels Sheet 2Plan · PDF5 Jun 2025View
Proposed Link Road Kerbing Sheet 1Plan · PDF5 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 11Environmental Assessment · PDF5 Jun 2025View
Environmental Statement (Volume 1) - Non-Technical StatementEnvironmental Assessment · PDF5 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 2Environmental Assessment · PDF5 Jun 2025View
Public Art StrategySupporting Documents · PDF5 Jun 2025View
ES (Volume 3) Technical Annex G - Transport Part 8Environmental Assessment · PDF5 Jun 2025View
Historic Environment Desk Based Assessment_RedactedSupporting Documents · PDF5 Jun 2025View
Proposed Link Road Swept Path Analysis Sheet 1Plan · PDF5 Jun 2025View
SUPERSEDED Flood Risk Assessment & Drainage Strategy - Part 9Supporting Documents · PDF5 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Not yet determined
Planning conditions
  1. The development within the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan” for which full planning permission is hereby permitted shall begin no later than the expiration of three years from the date of this permission. The development of the remainder of the site, for which outline permission is hereby permitted, shall begin no later than the expiration of three years from the date of this permission or no later than the expiration of two years from the date of approval of the first of the reserved matters to be approved, whichever is the later. Reason: To comply with Section 92 of the Town and Country Planning Act 1990.
  2. With the exception of development within the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan”, no development of any phase shall start until details of the: a) layout of the site; b) scale of the buildings; c) external appearance of the buildings; and d) landscaping of the site [hereafter called "the reserved matters"] for that phase have been submitted to and approved in writing by the Local Planning Authority. Application for the approval of the first reserved matters shall be made within three years of the date of this permission. The development shall accord with the approved details. Reason: To comply with Section 92 of the Town and Country Planning Act 1990.
  3. The development within the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan” for which full planning permission is hereby granted shall be carried out in accordance with the following plans numbered: XX The development of the remainder of the site shall be carried out in general accordance with the following plans numbered: XX Reason: For the avoidance of doubt and in the interests of proper planning and in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 (as amended).
  4. No development shall take place within the areas shown on the approved Parameters Plan (drawing NQ-MSA-SI-XX-SDR-A-2001 rev PL08) for strategic landscaping and safeguarded for the future potential route for Chickenhall Lane Link Road. Reason: For the avoidance of doubt and in the interests of proper planning and in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 (as amended).
  5. Within the height consultation zone of the North Plot, as detailed on the approved Parameters Plan (drawing NQ-MSA-SI-XX-SDR-A-2001 rev PL08), no unit shall be constructed taller than 30.8m AOD unless a Detailed Landscape and Visual Impact Assessment, demonstrating the acceptability of the unit(s) height to the satisfaction of the Local Planning Authority, has been submitted to and approved in writing by the Local Planning Authority. The Landscape and Visual Impact Assessment shall be submitted with the relevant reserved matters application. Reason: In the interests of the visual amenity of the locality.
  6. Within the height consultation zone of the South Plot, as detailed on the approved Parameters Plan (drawing NQ-MSA-SI-XX-SDR-A-2001 rev PL08), no unit shall be constructed taller than 28.5m AOD unless a Detailed Landscape and Visual Impact Assessment, demonstrating the acceptability of the unit(s) height to the satisfaction of the Local Planning Authority, has been submitted to and approved in writing by the Local Planning Authority. The Landscape and Visual Impact Assessment shall be submitted with the relevant reserved matters application. Reason: In the interests of the visual amenity of the locality.
  7. The total amount of employment floorspace provided at the site shall not exceed 92,000 sq m (Gross Internal Area). Reason: In the interests of highway safety.
  8. Any future reserved matters application for the siting and layout of a building shall be supported by an updated noise modelling report regarding the aircraft operation noise, taking into account the height, design, materials and siting of that proposed building and any other buildings already approved on site. Reason: In the interests of the residential amenities of neighbouring properties.
  9. Any future reserved matters applications including the construction of buildings shall be supported by sufficient information necessary to demonstrate that there will be no adverse impact on the retained habitats and adjacent SAC and SSSI habitats due to excessive shading. Details to be submitted shall: a. Identify, including on a plan, all retained habitats and ecological buffer areas that are sensitive to changes in temperature and light availability; b. Demonstrate that the proposed development, by virtue of its siting, scale and design would avoid changes in temperature and light availability that would adversely affect the ecological function of the retained and adjoining habitats; c. Demonstrate that shading effects would not adversely affect the integrity of the adjacent SAC and SSSI habitats and all retained habitats Reason: In the interests of protecting retained habitats, ecological buffer areas and adjacent designated sites from adverse shading effects.
  10. The employment uses hereby permitted shall not exceed the following floorspaces: a) 27,600 sq m (GIA) of Class E(g)(ii), (iii) and/or B2 Use (of which no more than 13,800 sq m (GIA) is for Class E(g)(ii), (iii)) b) 64,400 sq m (GIA) of Class B8 Use (of which no more than 9,200 sq m(GIA) is for parcel distribution) Reference to Classes E(g)(ii), (iii), B2 and B8 are references to Classes within the Town and Country Use Classes Order 1987 (as amended) [or in any provision equivalent to that/those Class[es] in any statutory instrument revoking and re-enacting that Order with or without modification]). Reason: In the interests of highway safety.
  11. Prior to the first occupation of any employment unit hereby permitted, details of the occupier and intended Use Class for that unit shall be submitted in writing to the Local Planning Authority. The relevant unit shall not be first occupied until such time as written approval of the intended Use Class has been provided by the Local Planning Authority, having regard to the range of Use Classes (E (g)(ii)&(iii), B2 and B8) allowed by this permission and the floorspace caps specified n Condition XX. The units once occupied shall only be used for the purpose approved under this condition, and for no other use within the Schedule to the Town and Country Use Classes Order 1987 (as amended) [or in any provision equivalent to that/those Class[es] in any statutory instrument revoking and re-enacting that Order with or without modification]). Reason: In the interests of highway safety.
  12. No storage or industrial processes shall take place outside of the buildings. Reason: In the interests of highway safety, to protect the amenity of the area and neighbouring residents; and to safeguard the local environment.
  13. Prior to the submission of any reserved matters applications a Design Code shall be submitted to and approved in writing by the Local Planning Authority. The Design Code shall include, inter alia, details of the overall design approach, materials, roof forms, building heights, landscaping and public realm, lighting, parking provision, micro mobility hubs (to include seating and bike maintenance facilities), electric vehicle charging, use of sustainable energy sources and potential locations for a connection to the Itchen Navigation on the eastern boundary of the site. All reserved matters applications shall be in accordance with the contents of the approved Design Code. Reason: To ensure and cohesive and comprehensive development in the interests of the visual appearance of the area.
  14. No work shall commence in any phase on site, including within the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan”, until the following has been submitted to, and approved in writing, by the Local Planning Authority for that phase: a. An updated report of a site investigation (including coverage of the entire development site - not only the access road), including delineation of hydrocarbon contamination in soils and groundwater – potential off-site plume from the rail depot, risk assessment to human health and controlled waters; and a complete ground gas risk assessment in accordance with UK Land contamination risk management (LCRM) national guidance, and BS10175:2011+A2:2017, and BS 8576:2013 and as agreed with the Local Planning Authority; and b. Detailed site-specific scheme for remedial works and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed and proposals for future maintenance and monitoring. Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Development shall be carried out in accordance with the approved details. Reason: To minimise the risk from land contamination for the safety of the future users of the development and to protect controlled waters.
  15. No phase of the development hereby permitted shall be occupied / brought into use until there has been submitted to the Local Planning Authority verification by the competent person approved under the provisions of condition XX (remediation) that any remediation scheme required for that phase and approved under the provisions of condition XX (remediation) has been implemented fully in accordance with the approved details (unless varied with the written permission of the Local Planning Authority in advance of implementation). Unless agreed in writing with the Local Planning Authority such verification shall comply with UK Land contamination risk management (LCRM) and any other relevant guidance. Typically such a report would comprise: a. A description of the site and its background, and summary of relevant site information; b. a description of the remediation objectives and remedial works carried out; c. verification data, including – data (sample locations/analytical results, as-built drawings of the implemented scheme, photographs of the remediation work in progress, etc. d. Certificates demonstrating that imported and/or material left in situ is free from contamination, confirmation of material removal, gas/vapour membranes have been installed correctly. Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved under condition XX (remediation). Reason: To minimise the risk from land contamination for the safety of the future site users and to protect controlled waters.
  16. Any imported soils required for the development hereby permitted should be demonstrated to be suitable for its intended end use and meet the approval of the Local Planning Authority prior to use on site. Reason: To minimise the risk from land contamination for the safety of the future site users.
  17. No construction or demolition work shall take place in any phase, until a detailed Construction Environmental Management Plan for that phase has been submitted to, and approved in writing by, the Local Planning Authority. The detailed management plan shall be prepared in accordance with the information and principles provided in the submitted Framework Construction Environmental Management Plan rev 4, dated February 2026, Demolition and construction work shall only take place in accordance with the approved management plan. Reason: To limit the impact the development has on the amenity of the locality and in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 (as amended).
  18. The development must accord with Hayden’s Arboricultural Consultants’ “Tree Survey and Arboricultural Impact Assessment in accordance with BS5837:2012” (reference 12216, dated 15th January 2026) and drawings 12216-D1-AIA rev A, 12216-D2-AIA, 12216-D3-AIA rev A and 12216-D4-AIA. Reason: To minimise tree losses and protect the retained trees, which form an important part of the amenity of the locality.
  19. No excavation, demolition or development related works shall take place in any phase on site until a detailed Arboricultural Method Statement and Tree Protection Plan for that phase have been submitted to and approved in writing by the Local Planning Authority. The approved arboricultural documents must be adhered to in full, and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees, which form an important part of the amenity of the locality.
  20. No development shall take place in any phase until a Landscape and Ecological Management Plan for that phase has been submitted to a approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: To ensure the provision of suitable ecological protection and enhancement.
  21. No development hereby permitted shall take place except in accordance with the terms and conditions of the Council’s Organisational Licence (WML-OR134, or a ‘Further Licence’) and with the proposals detailed on plan “Navigator Quarter: Impact plan for great crested newt District Licensing (Version 1)”, dated 2nd October 2025. Reason: In order to ensure that adverse impacts on great crested newts are adequately mitigated and to ensure that site works are delivered in full compliance with the Organisational Licence (WML OR134, or a ‘Further Licence’), section 15 of the National Planning Policy Framework, Circular 06/2005 and the Natural Environment and Rural Communities Act 2006.
  22. No development hereby permitted shall take place unless and until a certificate from the Delivery Partner (as set out in the District Licence WML-OR134, or a ‘Further Licence’), confirming that all necessary measures regarding great crested newt compensation have been appropriately dealt with, has been submitted to and approved in writing by the Local Planning Authority and the authority has provided authorisation for the development to proceed under the district newt licence. The delivery partner certificate must be submitted to this Local Planning Authority for approval prior to the commencement of the development hereby approved. Reason: In order to adequately compensate for negative impacts to great crested newts, and in line with section 15 of the National Planning Policy Framework, Circular 06/2005 and the Natural Environment and Rural Communities Act 2006.
  23. For the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan”, no development shall start until details of a sustainable drainage system for that phase have been submitted to and approved in writing by the Local Planning Authority. Any future reserved matters applications for the remainder of the site shall be supported by details of foul drainage and a sustainable drainage system for that phase. The details submitted for all phases of development shall be in accordance with Burrows Graham’s “Flood Risk Assessment and Drainage Strategy” (reference 30228-BGL-XX-XX-RP-D-00001, Version 7, dated 27th March 2026) and include a timetable for its implementation and a management / maintenance plan for the lifetime of the development [including the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the effective operation of the sustainable drainage system throughout its lifetime]. The system shall be implemented and thereafter managed and maintained in accordance with the approved details. Reason: To ensure satisfactory drainage for the development to prevent flooding and pollution; to protect and enhance biodiversity and in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 (as amended).
  24. Prior to the commencement of development, a detailed Air Quality Mitigation Strategy shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall demonstrate how the development will ensure that nitrogen deposition and associated pollutant concentrations at the River Itchen SSSI/SAC woodland and grassland features are reduced to levels that avoid further exceedance of the 1% critical level/load. The Strategy shall include (but not be limited to): Identification and implementation of measures to minimise operational traffic emissions (e.g. electric vehicle charging, fleet management, travel planning).Mitigation of construction phase dust and traffic impacts in accordance with IAQM guidance, secured through a Construction Environmental Management Plan (CEMP).Monitoring and reporting requirements to demonstrate compliance. The development shall thereafter be implemented in accordance with the approved Strategy, with all mitigation maintained and retained for the lifetime of the development. Reason: To limit the impact the development has on the amenity of the locality.
  25. No development shall take place within any phase until the developer has secured the implementation of a programme of archaeological assessment in accordance with a Written Scheme of Investigation (WSI) for that phase that has been submitted to and approved in writing by the Local Planning Authority in order to recognise, characterise and record any archaeological features and deposits that may exist on site. Reason: To ensure the archaeological interest of the site is properly safeguarded and recorded.
  26. No development shall take place in any phase until the developer has secured the implementation of a programme of archaeological mitigation of impact, based on the results of the trial trenching, in accordance with a Written Scheme of Investigation for that phase that has been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure the archaeological interest of the site is properly safeguarded and recorded.
  27. Following completion of archaeological fieldwork a report shall be produced in accordance with an approved programme submitted to and approved in writing by the Local Planning Authority setting out and securing appropriate post-excavation assessment, specialist analysis and reports, publications and public engagement. Reason: To ensure the archaeological interest of the site is properly safeguarded and recorded.
  28. No development shall take place until details of the measures to protect or divert the public water supply main located within the site have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: In the interests of protecting the public infrastructure.
  29. No development within any phase shall commence until a mineral recovery plan for the management of resources recovered incidentally from excavation work throughout the construction of that phase has been submitted to and approved in writing by the Local Planning Authority. The mineral recovery plan shall include details of methods for ensuring that all minerals that can be viably recovered during construction are put to beneficial use on site as part of the development, or dispatched off site for processing for future use. A method to record the recovery of minerals shall also be included within the plan. Development shall be carried out in accordance with the approved details. On the 1st April of each year following commencement of development, the tonnes of minerals extracted, quantity re-used on site, and if exported from site the location of processing, shall be reported to the Mineral Planning Authority. The reporting of such information shall be required until such time as the development is considered to be completed by the Local Planning Authority. Reason: To ensure that minerals can be viably recovered during construction are recovered and put to beneficial use in accordance with Policy 15 (Safeguarding – mineral resources) of the adopted Hampshire Minerals and Waste Plan (2013).
  30. Notice shall be given to the Local Planning Authority when: a) Habitat creation and enhancement works as set out in the approved HMMP have commenced. b) Habitat creation and enhancement works as set out in the approved HMMP have been completed. Monitoring reports shall be submitted to Local Planning Authority in writing in accordance with the methodology and frequency specified in the approved Habitat Management and Monitoring Plan. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and Eastleigh Borough Local Plan 2016-2036 Policy DM11.
  31. No development shall take place within any phase until plans, including cross sections, to show proposed ground levels, finished floor levels and their relationship to existing levels and retained habitats within the site and on immediately adjoining land have been submitted to and approved in writing by the Local Planning Authority for that phase. Development shall be carried out in accordance with approved details. Reason: To limit the impact the development has areas of ecological interest and to ensure a high quality design in the interest of visual and residential amenity.
  32. Prior to commencement of development details of the noise barrier shown on the illustrative site layout plans (drawings NQS-MSA-SI-XX-DR-A-2002 rev PL11 and NQS-MSA-SI-XX-DR-A-2005 rev PL06) shall be submitted to and approved in writing by the Local Planning Authority. The noise barrier shall be in accordance with the details provided via email from Michael Sparks Associates dated 22.1.26 and details to be submitted shall include measures to allow for movement of wildlife and an ongoing maintenance schedule. The noise barrier shall be installed prior to development commencing, be built and maintained in accordance with the approved details and retained thereafter. Reason: In the interests of the residential amenity of neighbouring properties.
  33. No development shall commence on site until an Overall Biodiversity Gain Plan has been submitted to and approved in writing by the Local Planning Authority. The Overall Biodiversity Gain Plan shall be prepared in accordance with the submitted Biodiversity Net Gain Metric dated 13.2.26 and Biodiversity Net Gain Report (reference 31/26-3D, dated 27.6.25). No development shall commence within each phase until a Detailed Phase Biodiversity Gain Plan for that phase, in accordance with the approved Overall Biodiversity Gain Plan, has been submitted to and approved in writing by the Local Planning Authority. Development shall be implemented in accordance with the approved Detailed Phase Biodiversity Gain Plans and written evidence of the purchase of any required off-site credits shall be provided to the Local Planning Authority prior to commencement of that phase. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and Eastleigh Borough Local Plan 2016-2036 Policy DM11.
  34. No development shall commence within each phase until a Habitat Management and Monitoring Plan (HMMP) for that phase, prepared in accordance with the approved Detailed Phase Biodiversity Gain Plan, has been submitted to and agreed in writing by the Local Planning Authority along with a timetable for implementation. Thereafter those habitats shall be managed and maintained in accordance with the approved details for a minimum period of 30 years following completion. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and Eastleigh Borough Local Plan 2016-2036 Policy DM11.
  35. With the exception of development within the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan”, no development above slab level within each phase shall start until a landscaping scheme for that phase has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping, including trees and boundary treatments, and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  36. For the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan”, no development shall take place above binder course until a landscape / open space management plan and maintenance schedule for that phase has been submitted to and approved in writing by the Local Planning Authority. For the remainder of the site, no development above slab level shall take place in any phase until a landscape / open space management plan and maintenance schedule for that phase has been submitted to and approved in writing by the Local Planning Authority. The landscape / open space shall thereafter be managed in accordance with the approved details. Reason: In the interests of the visual amenities of the locality.
  37. Prior to development above slab level in each phase, details of a technology and communication strategy for the provision of broadband, fibre optic and audio-visual technology for that phase shall be submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved, with the infrastructure provided for use upon first occupation of each building and retained thereafter. Reason: To support economic development.
  38. Prior to its installation in any phase, details of all streetlighting for that phase shall be submitted to and agreed in writing by the Local Planning Authority. The lighting strategy shall include details of colour, temperature and wavelength and be designed to minimise spillage and avoid impacting on flight corridors used by bats. Development shall be carried out in accordance with the approved details. Reason: In the interests of highway safety and the protection of local biodiversityand in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 (as amended).
  39. In relation to all roads, footways and cycleways to be provided on site the following requirements shall be met: a) Prior to construction of any road, footway or cycleway in any phase a plan showing the extent of the roads, footways and cycleways to be adopted and unadopted in that phase shall be submitted to and approved in writing by the Local Planning Authority; b) All roads, footways and cycleways in each phase, whether to be adopted or otherwise, shall be built to Hampshire County Council’s current adoptable construction standards and completed prior to occupation of the penultimate building in that phase; and c) A verification report by a suitably qualified engineer confirming that all unadopted roads, footways and cycleways in that phase have been built to Hampshire County Council’s current adoptable construction standards shall be provided to the Local Planning Authority on completion of the final road surface or prior to occupation of the penultimate building within that phase, whichever is earlier. The report shall include the relevant construction details that the roads, footways and cycleways have been built to and details of the professional qualifications of the person providing the verification. Reason: To ensure that the development is provided to an appropriate standard.
  40. A delivery and servicing strategy shall be provided as part of any future reserved matters application. Reason: To ensure appropriate servicing of the site and in the interests of highway safety.
  41. The approved sustainable drainage scheme shall be fully implemented: a. For the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan”, prior to binder course; and b. For each phase within the remainder of the site, prior to the first occupation of any building in that phase The approved sustainable drainage scheme shall thereafter retained, maintained and managed in accordance with the approved management and maintenance details. Within 3 months of the completion of the binder course in the road area as shown on drawing NQS-MSA-SA-ZZ-DR-A-2000 rev PL05 “Detailed / Outline Boundary Plan”, and within 3 months of first occupation of any building in any other phase a verification report, prepared by the installers of the drainage system for that phase, shall be submitted to the Local Planning Authority for approval. The report shall confirm the implementation of the drainage scheme in accordance with the approved details. Reason: To ensure satisfactory drainage for the development to prevent flooding and pollution and to protect and enhance biodiversity and in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 (as amended).
  42. Prior to the first occupation of each building a BREEAM New Construction Post Construction certificate at "Excellent" standard shall be submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of sustainability.
  43. Within 28 days of first operation of any fixed plant or machinery related to the proposed development, a cumulative post-installation noise assessment shall be undertaken by a suitably qualified acoustic consultant. The assessment shall confirm that the cumulative noise level from all fixed plant and machinery does not exceed Daytime (07:00-23:00) LAr,1hour 33 dB and Night-time (23:00-07:00) LAr,15minutes 30 dB when assessed in accordance with BS 4142:2014+A1:2019, as measured at the nearest noise-sensitive receptor. Where the assessment identifies non-compliance, a scheme of mitigation measures shall be submitted to and approved in writing by the Local Planning Authority and implemented prior to continued operation of the plant. Reason: In the interests of the residential amenities of neighbouring properties.
  44. The blast screen shall be installed at the end of the runway prior to the opening of the access road, footway and cycleways to the general public, in accordance with details that have first been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: In the interests of public amenity.
  45. For a period of no less than 10 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenities of the locality.
  46. The development shall be managed and maintained in accordance with EPR’s “Bird Hazard Management Plan” (reference 3136-6B, dated 29 May 2025) submitted in support of the application. Reason: In the interests of airport safety.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.