Council planning record

1 no. Poplar (T1)- crown reduce/pollard by up to 10m all round The tree is about 30-35m tall and is growing about 15m from the adjacent railway line. The tree was storm damaged in 2021 and has lost part of its upper crown. The tree significantly overhangs the neighbouring rear garden. One large branch has already failed and fallen into the same rear garden; and there is a large open wound on the side of the stem. The tree is nearing the end of its safe useful life expectancy and there is a genuine risk the tree, or part of it, will fall onto the railway line and/or the neighbouring rear gardens without intervention/ management.

ORCHARD HILL, SALTERNS LANE, BURSLEDON, SOUTHAMPTON, SO31 8DH

Decided Raise No Objection ToReference: NC/22/94412Eastleigh Borough Council

Last published check: 8 Oct 2026, 18:23. Check the council record for more recent changes.

Application location

ORCHARD HILL, SALTERNS LANE, BURSLEDON, SOUTHAMPTON, SO31 8DH

This record has no verified map location.

Application summary

Status
Decided Raise No Objection To
Application type
Notification of proposed works to trees in conservation areas
Received
20 Dec 2022
Validated
4 Jan 2023
Determination deadline
15 Feb 2023
Local authority
Eastleigh Borough Council

Application overview

1 no. Poplar (T1)- crown reduce/pollard by up to 10m all round The tree is about 30-35m tall and is growing about 15m from the adjacent railway line. The tree was storm damaged in 2021 and has lost part of its upper crown. The tree significantly overhangs the neighbouring rear garden. One large branch has already failed and fallen into the same rear garden; and there is a large open wound on the side of the stem. The tree is nearing the end of its safe useful life expectancy and there is a genuine risk the tree, or part of it, will fall onto the railway line and/or the neighbouring rear gardens without intervention/ management.

Proposal details

Reference
NC/22/94412
Alternative references
11740200
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP
Agent
THAC (Mr Trevor Heaps)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 4 of 4

DocumentPublishedAction
NC_22_94412 PL_Final DecisionDecision Notice · PDF30 Jan 2023View
Officer Report CS94412Officer Report · PDF27 Jan 2023View
ApplicationFormRedacted.pdf · PDF20 Dec 2022View
Sketch Plan for Orchard Hill.jpgLocation Plan20 Dec 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Raise No Objection To
NC_22_94412 PL_Final Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.