Council planning record

Listed Building Consent: Proposed new first floor offices. Replacement of canopy

BOTLEY MILLS, MILL HILL, BOTLEY

Decided Grant Listed Building ConsentReference: L/22/94391Eastleigh Borough Council

Last published check: 9 Oct 2026, 13:58. Check the council record for more recent changes.

Application location

BOTLEY MILLS, MILL HILL, BOTLEY

This record has no verified map location.

Application summary

Status
Decided Grant Listed Building Consent
Application type
Listed building
Received
6 Oct 2022
Validated
19 Oct 2022
Determination deadline
16 Jan 2023
Local authority
Eastleigh Borough Council

Application overview

Listed Building Consent: Proposed new first floor offices. Replacement of canopy

Proposal details

Reference
L/22/94391
Ward
Botley Ward;Botley Ward
Parish
Botley CP;Botley CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 19 of 19

DocumentPublishedAction
L_22_94391 Delegated Officer ReportOfficer Report · PDF16 Jan 2023View
L_22_94391 PL_Final DecisionDecision Notice · PDF16 Jan 2023View
ParishConsultation Response12 Jan 2023View
Built Heritage ConsultantConsultation Response23 Dec 2022View
2021 Planning and Listed Building Consent applications requiring consultation with and notification to Historic EnglandSupporting Documents · PDF19 Dec 2022View
Proposed First Floor PlanFloor Plan · PDF27 Oct 2022View
South and North Elevation PlansElevations Plan · PDF20 Oct 2022View
East and West Elevation PlansElevations Plan · PDF20 Oct 2022View
Site PlanSite Layout Plan · PDF20 Oct 2022View
Existing Ground Floor PlanFloor Plan · PDF19 Oct 2022View
Existing Elevation PlansElevations Plan · PDF19 Oct 2022View
Heritage Statement Rev 2Supporting Info · PDF11 Oct 2022View
Design Statement Rev 2Supporting Documents · PDF11 Oct 2022View
Proposed Block PlanBlock Plan · PDF6 Oct 2022View
Ground Floor PlanFloor Plan · PDF6 Oct 2022View
Application Form RedactedApplication Form · PDF6 Oct 2022View
SUPERSEDED Proposed First Floor PlanFloor Plan · PDF6 Oct 2022View
Site Location PlanLocation Plan · PDF6 Oct 2022View
Proposed Elevations (3D) PlanElevations Plan · PDF6 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant Listed Building Consent
L_22_94391 PL_Final Decision
Planning conditions
  1. The works hereby consented shall start no later than three years from the date of this permission. Reason: To comply with Section 18 of the Planning [Listed Buildings and Conservation Areas] Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 110, 111, 112 Rev A, 113, 114 Rev A, 115 Rev B, 116 Rev A, 117, 118, and 119 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.