Council planning record

Demolition and rebuilding to same size/footprint of outbuilding within grounds of listed house

148 CHURCH ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6DS

Decided Grant Listed Building ConsentReference: L/22/94321Eastleigh Borough Council

Last published check: 9 Oct 2026, 00:33. Check the council record for more recent changes.

Application location

148 CHURCH ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6DS

This record has no verified map location.

Application summary

Status
Decided Grant Listed Building Consent
Application type
Listed building
Received
2 Dec 2022
Validated
2 Dec 2022
Determination deadline
27 Feb 2023
Local authority
Eastleigh Borough Council

Application overview

Demolition and rebuilding to same size/footprint of outbuilding within grounds of listed house

Proposal details

Reference
L/22/94321
Alternative references
11739220
Ward
Bishopstoke Ward
Parish
Bishopstoke CP
Agent
Hall & Ensom Ltd (Mr David Ensom)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
Evidence of tree protection in place_RedactedTree Info · PDF15 Jun 2023View
Officer ReportOfficer Report · PDF27 Feb 2023View
Decision NoticeDecision Notice · PDF27 Feb 2023View
Arboricultural Impact AssessmentSupporting Documents · PDF3 Feb 2023View
TreesConsultation Response · PDF12 Jan 2023View
Historic EnglandConsultation Response4 Jan 2023View
Built Heritage ConsultantConsultation Response23 Dec 2022View
2021 Planning and Listed Building Consent applications requiring consultation with and notification to Historic EnglandSupporting Documents · PDF19 Dec 2022View
Proposed and Existing Outbuilding Reconstruction PlansElevations And Floor Plan · PDF2 Dec 2022View
Heritage Design and Access Statement - OutbuildingSupporting Documents · PDF2 Dec 2022View
Application Form RedactedApplication Form · PDF2 Dec 2022View
Structural Report_RedactedReport - Other · PDF2 Dec 2022View
Location and Site PlanLocation Plan · PDF2 Dec 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant Listed Building Consent
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 22.27.00 and 22.27.01 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 18 of the Planning [Listed Buildings and Conservation Areas] Act 1990.
  3. The development must accord with the arboricultural report reference MB230114-01. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  4. The approved rooflights to the outbuilding, as shown on plan 22.27.01, shall be set level with the finished roof surface. Reason: To reduce any potential negative impact to the setting of the house
  5. Note to applicant: Please be advised that although this is a listed building application and not a full application or a householder application, wildlife protection laws still apply. The Wildlife and Countryside Act (1981 as amended) is the primary legislation that protects wild animals, plants, and habitats in the UK. It lists the species which are protected by law along with their resting places and the non-native invasive species which must not be allowed to spread into the wild. It is your responsibility to implement the mitigation measures recommended by the ecological consultant in their reports. Please be aware of the following: ​​​​​In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-worksIf evidence of an active bird’s nest is found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the chicks have fledged and left the nest. A suitably qualified ecologist should be consulted for advice.To avoid harm to hibernating or active reptiles or amphibians any demolition and construction works must follow the precautionary working method for herptiles set out in Annex 5 of the report (Weymouth House Garage – Preliminary Roost Assessment (PRA) and Phase 2 Bat Survey UPDATED REPORT). This includes clearance of habitats only during the active season (mid-March through October under suitable temperatures) and under ecological supervision.
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.