Council planning record

Two storey side extension, first floor extension above existing garage, single storey rear extension, front porch and extension to dropped kerb.

55 ARDINGLY CRESCENT, HEDGE END, SOUTHAMPTON, SO30 2TE

Decided PermitReference: H/26/101827Eastleigh Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
24 Jul 2026
Validated
14 Aug 2026
Determination deadline
9 Oct 2026
Local authority
Eastleigh Borough Council

Application overview

Two storey side extension, first floor extension above existing garage, single storey rear extension, front porch and extension to dropped kerb.

Proposal details

Reference
H/26/101827
Ward
Hedge End North Ward
Parish
Hedge End CP
Agent
Luke Richards

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

55 ARDINGLY CRESCENT, HEDGE END, SOUTHAMPTON, SO30 2TE

This record has no verified map location.

Documents 32 of 32

DocumentPublishedAction
H_26_101827 Delegated Officer ReportOfficer Report · PDF5 Oct 2026View
H_26_101827 PL_Final DecisionDecision Notice · PDF5 Oct 2026View
Certificate B_RedactedSupporting Documents · PDF9 Sept 2026View
AMENDED Proposed South East ElevationElevations Plan · PDF7 Sept 2026View
AMENDED Proposed North West ElevationElevations Plan · PDF7 Sept 2026View
AMENDED Proposed Site PlanElevations Plan · PDF7 Sept 2026View
Town Council Consultation ResponseConsultation Response · PDF3 Sept 2026View
Consultation Response Letter from Hampshire HighwaysConsultation Response · PDF24 Aug 2026View
Consultation Response Letter from Southern WaterConsultation Response · PDF17 Aug 2026View
Consultation Response from Southern Water GIS Map printConsultation Response · PDF17 Aug 2026View
Ecology Consultation ResponseConsultee Response · PDF17 Aug 2026View
Location and Block PlansPlans · PDF14 Aug 2026View
Location and Proposed Block Plans AMENDEDLocation Plan · PDF14 Aug 2026View
Existing Elevation PlanElevations Plan · PDF6 Aug 2026View
Proposed North East Elevation PlanElevations Plan · PDF6 Aug 2026View
Existing Location and Block PlanPlans · PDF6 Aug 2026View
Existing Elevation PlanElevations Plan · PDF27 Jul 2026View
SUPERSEDED Proposed North West Elevation PlanElevations Plan · PDF27 Jul 2026View
Proposed Roof PlanRoof Plan · PDF27 Jul 2026View
Existing Floor PlanFloor Plan · PDF27 Jul 2026View
SUPERSEDED Proposed South East Elevation PlanElevations Plan · PDF27 Jul 2026View
Planning StatementPlanning Statement · PDF27 Jul 2026View
Proposed Ground Floor PlanFloor Plan · PDF27 Jul 2026View
Proposed South West Elevations PlanElevations Plan · PDF27 Jul 2026View
SUPERSEDED Proposed Site and Street Scene PlansPlans · PDF27 Jul 2026View
Existing Floor PlanFloor Plan · PDF27 Jul 2026View
Existing Site and Street Scene PlansSite Layout Plan · PDF27 Jul 2026View
Proposed First Floor PlanFloor Plan · PDF27 Jul 2026View
Existing Roof PlanRoof Plan · PDF27 Jul 2026View
Sun Study Existing and ProposedSupporting Info · PDF27 Jul 2026View
Existing Elevation PlanElevations Plan · PDF27 Jul 2026View
Existing South East Elevation PlanElevations Plan · PDF27 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_26_101827 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: P001, P001 proposed, P002, P003 V2, P004, P005, P006, P007, P008, P009, P010, P011 V2, P012, P013 V2, P014, P015, P016, P017 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the adjoining building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to applicant: Subsequent to any planning permission that may be forthcoming from EBC as Local Planning Authority, a secondary permission will be required from HCC as Local Highway Authority in order to actually undertake works on the highway.
  5. Note to applicant: Due to legislative changes, certain Southern Water sewers are not comprehensively mapped. There are no public sewers recorded within the site boundary. However, the relevant requirements, conditions and application associated with the build-over/close-to a public sewer are available at Southern Water's Get Connected service: https://developerservices.southernwater.co.uk. Please note, surface water should not be disposed of into a public foul sewer and must comply with the Hierarchy of H3 of the Building Regulations. For more details, refer to the Drainage and Waste Disposal: Approved Document H on the GOV.UK website. Any new connections to the public sewerage system will require a New Sewer Connection application (also known as a Section 106) to be submitted and approved by Southern Water. Due to legislative changes effective from 1st October 2011 regarding the ownership of sewers, it is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  6. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im working-on-a-building-with-bats/ive-found-a-bat-during-works. A precautionary working method must be used to prevent harm to wildlife that could be using this site. It should include: All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat. Any excavations must be covered at night or be fitted with a small animal escape ramp. No fires can be lit on site. Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. Any chemicals and fuels must be stored carefully and away from potential wildlife habitat. Any animals found on site should not be handled but be allowed to move away to a place of safety on their own. Biodiversity enhancements will be required in accordance with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat box and a swift nest box may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm)
  7. Note to Applicant: In accordance with paragraph 1 of policy DM3 within the National Planning Policy Framework (August 2026), Eastleigh Borough Council takes a positive manner to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.