Council planning record

Alterations and additions to include single storey front extension and porch, infilling of front dormers, rear dormer extension, existing conservatory to be raised with new flat roof, small rear canopy together with fenestration changes and new external materials.

BIRCH SPINNEY, HUNGERFORD, BURSLEDON, SOUTHAMPTON, SO31 8DE

Decided PermitReference: H/26/101707Eastleigh Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Householder planning
Received
6 Jul 2026
Validated
13 Jul 2026
Determination deadline
7 Sept 2026
Local authority
Eastleigh Borough Council

Application overview

Alterations and additions to include single storey front extension and porch, infilling of front dormers, rear dormer extension, existing conservatory to be raised with new flat roof, small rear canopy together with fenestration changes and new external materials.

Proposal details

Reference
H/26/101707
Alternative references
15059193
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP
Agent
Philip Laurenson

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

BIRCH SPINNEY, HUNGERFORD, BURSLEDON, SOUTHAMPTON, SO31 8DE

This record has no verified map location.

Documents 12 of 12

DocumentPublishedAction
H_26_101707 Delegated Officer ReportOfficer Report · PDF7 Sept 2026View
H_26_101707 PL_Final DecisionDecision Notice · PDF7 Sept 2026View
Material ScheduleSupporting Documents · PDF14 Aug 2026View
Updated Proposed Elevations and Floor PlansElevations And Floor Plan · PDF14 Aug 2026View
Ecology response 12 8 26 for H 26 101707 BIRCH SPINNEY, HUNGERFORD, BURSLEDONConsultee Response · PDF12 Aug 2026View
Site Layout PlanSite Layout Plan · PDF10 Jul 2026View
Existing Elevations and Floor PlansPlans · PDF10 Jul 2026View
PhotoPhotographs · PDF10 Jul 2026View
Design and access statementDesign And Access Statement · PDF6 Jul 2026View
Sections PlansSection Plan · PDF6 Jul 2026View
Application Form RedactedApplication Form · PDF6 Jul 2026View
Location PlanLocation Plan · PDF6 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
H_26_101707 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: L01 Rev A, 01 Rev B, 02 Rev B, 03 Rev B, and 04 Rev A. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The external materials and finishes used in the development shall be in accordance with the approved Material Schedule (ref: 2106) for Birch Spinney, including white render, anthracite-grey aluminium cladding, anthracite-grey aluminium windows and matching external doors, grey uPVC fascias and soffits and black rainwater goods. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  4. The development hereby permitted shall be carried out in accordance with the mitigation and habitat enhancement measures set out in the Bat Emergence Survey Report prepared by Wessex Ecology dated August 2026. The habitat enhancement features shall be installed before completion of the development and retained thereafter. Where a European Protected Species licence requires alternative bat mitigation measures, the licensed measures shall prevail. Reason: To safeguard protected species and secure appropriate ecological mitigation and enhancement.
  5. All demolition, site clearance and construction works shall be carried out in full accordance with the approved Construction Environmental Management Plan (CEMP) prepared by Ross Consulting. The measures contained within the approved CEMP shall be implemented throughout the construction period. Reason: To limit the impact the development has on the amenity of the locality.
  6. Note to Applicant: The applicant is advised that a soprano pipistrelle bat roost has been confirmed within the dwelling. A European Protected Species mitigation licence from Natural England must be obtained before any works capable of affecting the confirmed bat roost commence. The grant of planning permission does not authorise any activity that would otherwise constitute an offence under the Conservation of Habitats and Species Regulations 2017 or the Wildlife and Countryside Act 1981, as amended. The applicant should liaise with a suitably qualified and licensed ecologist and ensure that all relevant works are undertaken in accordance with the Natural England licence and the approved ecological mitigation measures.
  7. Note to Applicant: No external lighting installed as part of the development shall directly illuminate the confirmed bat-roost access points or any replacement-roost or bat-habitat enhancement feature. Any such lighting shall be positioned and directed away from those features and shall be maintained as such thereafter.
  8. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  9. Note to Applicant: In accordance with Policy DM3(1)(a) of the National Planning Policy Framework (August 2026), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.