The development hereby permitted shall be implemented in accordance with the following plans numbered: P02, P03, P05, P01,P07,P04 and P06 Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
The first floor window on the east facing elevation [as marked on the approved plan] shall either be: a) obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening toplight: OR b) positioned at least 1.7 metres above the floor of the room in which [it is/ they are] installed. Once installed the window[s] shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
No excavation, demolition or development related works, including placement of goods, chemicals, fuels, soil or other materials, shall take place within the calculated Root Protection Area – defined as a distance of 12 times the diameter of the stem (as measured at 1.5m) – of any tree protected under Tree Preservation Order legislation. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.