Council planning record

Single storey rear and 2 storey side extension

10 ALLEN ROAD, HEDGE END, SOUTHAMPTON, SO30 4EX

Decided PermitReference: H/26/101518Eastleigh Borough Council

Application location

10 ALLEN ROAD, HEDGE END, SOUTHAMPTON, SO30 4EX

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
3 Jun 2026
Validated
4 Jun 2026
Determination deadline
30 Jul 2026
Local authority
Eastleigh Borough Council

Application overview

Single storey rear and 2 storey side extension

Proposal details

Reference
H/26/101518
Alternative references
14950624
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
CMC Design Architectural Services (Mr Chris McDermott)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
H_26_101518 PL_Final DecisionDecision · PDF28 Jul 2026View
H_26_101518 Decision notice informative leaflet - PERMITDecision · PDF28 Jul 2026View
H_26_101518 Delegated Officer ReportOfficer Report · PDF27 Jul 2026View
Town Council Consultation ResponseConsultation Response · PDF2 Jul 2026View
Amended Site PlanSite Layout Plan · PDF30 Jun 2026View
Ecology Consultation ResponseConsultee Response · PDF17 Jun 2026View
Elevation Plans - ProposedElevations Plan · PDF3 Jun 2026View
Location Plan and SUPERSEDED Site PlanLocation Plan · PDF3 Jun 2026View
Application Form REDACTEDApplication Form · PDF3 Jun 2026View
Elevation Plans - ExistingElevations Plan · PDF3 Jun 2026View
Floor and Roof Plans - ExistingFloor Plan · PDF3 Jun 2026View
Floor and Roof Plans - ProposedFloor Plan · PDF3 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_26_101518 PL_Final Decision H_26_101518 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 1057/05/100, 1057_100 Rev A, 1057/05/101, 1057/05/102, 1057/05/103, 1057/05/104 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used must match as closely as possible, in type, colour and texture to those listed in the materials section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im working-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to applicant: A precautionary working method must be used to prevent harm to wildlife that could be using this site. It should include: All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat. Any excavations must be covered at night or be fitted with a small animal escape ramp. No fires can be lit on site. Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. Any chemicals and fuels must be stored carefully and away from potential wildlife habitat. Any animals found on site should not be handled but be allowed to move away to a place of safety on their own.
  6. Note to applicant: Biodiversity enhancements will be required in accord with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat box and a swift nest box may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.wildaboutgardens.org.uk/sites/default/files/2022 03/WAG16%20Bats%20updated%202022%20WEB.pdf - Stars of the Night guide to attract bats into your garden https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/ www.bats.org.uk/resources/guidance-for-professionals/landscape-and-urban-design-for bats-and-biodiversity https://ptes.org/my-garden/ https://www.ukbutterflies.co.uk/foodplants.php
  7. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.