Council planning record

Erection of an outbuilding (Retrospective).

ALLINGTON MANOR FARM, ALLINGTON MANOR, ALLINGTON LANE, WEST END, SOUTHAMPTON, SO50 7DE

Decided PermitReference: H/26/101410Eastleigh Borough Council

Application location

ALLINGTON MANOR FARM, ALLINGTON MANOR, ALLINGTON LANE, WEST END, SOUTHAMPTON, SO50 7DE

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
15 May 2026
Validated
2 Jul 2026
Determination deadline
27 Aug 2026
Local authority
Eastleigh Borough Council

Application overview

Erection of an outbuilding (Retrospective).

Proposal details

Reference
H/26/101410
Alternative references
14903666
Ward
West End North Ward
Parish
West End CP
Agent
Mark Hayes

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
H_26_101410 PL_Final DecisionDecision Notice · PDF24 Aug 2026View
H_26_101410 Delegated Officer Report (1)Officer Report · PDF20 Aug 2026View
Proposed Details Garden Store · PDF2 Jul 2026View
Proposed block plan · PDF29 Jun 2026View
Existing block plan · PDF29 Jun 2026View
Location PlanLocation Plan · PDF15 May 2026View
Application Form RedactedApplication Form · PDF15 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_26_101410 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 240/DP/001 240/DP/003 dated June 2026 240/DP/004 dated June 2026. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. Note to Applicant: Biodiversity enhancements are required in accordance with NDMP N2 1.a of the NPPF and Policy DM11 of the Local Plan, and are recommended in the form of a bat box or a swift nest box on the existing building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight.
  3. Note to Applicant: In accordance with Policy DM3 1.a of the National Planning Policy Framework (August 2026), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.