Council planning record

Erection of front porch, replacement front steps with landing area and UPVC window on the ground floor above garage roof (part retrospective). Amended description.

18 TADBURN CLOSE, CHANDLER'S FORD, EASTLEIGH, SO53 2NF

Decided PermitReference: H/26/101377Eastleigh Borough Council

Application location

18 TADBURN CLOSE, CHANDLER'S FORD, EASTLEIGH, SO53 2NF

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
8 May 2026
Validated
8 Jul 2026
Determination deadline
2 Sept 2026
Local authority
Eastleigh Borough Council

Application overview

Erection of front porch, replacement front steps with landing area and UPVC window on the ground floor above garage roof (part retrospective). Amended description.

Proposal details

Reference
H/26/101377
Alternative references
14921166
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 24 of 24

DocumentPublishedAction
H_26_101377 Delegated Officer Report FinalOfficer Report · PDF12 Aug 2026View
H_26_101377 PL_Final DecisionDecision Notice · PDF12 Aug 2026View
AMENDED Proposed Front ElevationElevations Plan · PDF10 Aug 2026View
Ecology Consultation ResponseConsultee Response · PDF28 Jul 2026View
Porch Details and MeasurementsSupporting Documents · PDF23 Jul 2026View
Consultation Response from Southern Water GIS Map printConsultation Response · PDF13 Jul 2026View
Consultation Response Letter from Southern WaterConsultation Response · PDF13 Jul 2026View
ELEMENT REMOVED Proposed Wall CladdingElevations Plan · PDF9 Jul 2026View
ELEMENT REMOVED Proposed Cladding ImageSupporting Documents · PDF8 Jul 2026View
Existing and Proposed Section DrawingPlan · PDF8 Jul 2026View
SUPERSEDED Proposed Front Elevation PlanElevations Plan · PDF8 Jul 2026View
Porch Elevation Plan 1Elevations Plan · PDF8 Jul 2026View
Existing Front Elevation PlanElevations Plan · PDF8 Jul 2026View
Existing and Proposed Roof PlansRoof Plan · PDF8 Jul 2026View
ELEMENT REMOVED Cladding Details 2Supporting Documents · PDF8 Jul 2026View
Porch Elevation Plan 3Elevations Plan · PDF8 Jul 2026View
Porch Elevation Plan 2Elevations Plan · PDF8 Jul 2026View
Existing Floor PlansFloor Plan · PDF8 Jul 2026View
Block PlanBlock Plan · PDF8 Jul 2026View
ELEMENT REMOVED Cladding DetailsSupporting Documents · PDF8 Jul 2026View
Proposed Ground Floor PlanFloor Plan · PDF8 Jul 2026View
Photo - House FrontPhotographs8 May 2026View
Application Form RedactedApplication Form · PDF8 May 2026View
Location PlanLocation Plan · PDF8 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_26_101377 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: Proposed Front Elevation, Porch Schedule, Section, Elevation 1, Elevation 2, Existing and Proposed Roof, Proposed G Floor Plan, Elevation 3 and Block Plan. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used must match as closely as possible, in type, colour and texture to those listed in materials section of the application form and the Porch Schedule. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im working-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to applicant: Biodiversity enhancements will be required in accord with Local Plan policy DM 11 and NPPF (December 2024) paragraphs 187d and 192 b. A bat box and a swift nest box may be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm)
  6. Note to applicant: The gravity sewer (diameter unknown) requires a clearance of 3 metres on either side of the gravity sewer to protect it from construction works and to allow for future maintenance access. No development or tree planting should be carried out within 3 metres of the external edge of the public gravity sewer without consent from Southern Water. All existing infrastructure should be protected during the course of construction works. Please refer to: https://www.southernwater.co.uk/media/st5orjvm/stand-off-distances.pdf
  7. Note to applicant: In order to protect public sewers, Southern Water requests that the developer must agree with Southern Water, prior to commencement of the development, the measures to be taken to protect the public sewers.
  8. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.