Council planning record

Erection of timber framed garden room with raised platform and veranda (Retrospective Application)

10 BOWCOMBE, NETLEY ABBEY, SOUTHAMPTON, SO31 5GP

Decided PermitReference: H/26/101326Eastleigh Borough Council

Application location

10 BOWCOMBE, NETLEY ABBEY, SOUTHAMPTON, SO31 5GP

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
28 Apr 2026
Validated
11 May 2026
Determination deadline
6 Jul 2026
Local authority
Eastleigh Borough Council

Application overview

Erection of timber framed garden room with raised platform and veranda (Retrospective Application)

Proposal details

Reference
H/26/101326
Alternative references
14881073
Ward
Hamble & Netley Ward
Parish
Hound CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
H_26_101326 Delegated Officer ReportOfficer Report · PDF3 Jul 2026View
H_26_101326 PL_Final DecisionDecision Notice · PDF3 Jul 2026View
Consultation Response Letter from Southern WaterConsultation Response · PDF20 May 2026View
Consultation Response from Southern Water GIS Map printConsultation Response · PDF20 May 2026View
As-built Roof PlanRoof Plan · PDF11 May 2026View
As-built Side (Left) Elevation PlanElevations Plan · PDF11 May 2026View
As-built Side (Right) Elevation PlanElevations Plan · PDF11 May 2026View
As-built Front Elevation PlanElevations Plan · PDF11 May 2026View
As-built Floor PlanFloor Plan · PDF11 May 2026View
As-built Rear Elevation PlanElevations Plan · PDF11 May 2026View
Cover LetterSupporting Documents · PDF28 Apr 2026View
Location PlanLocation Plan · PDF28 Apr 2026View
Application Form RedactedApplication Form · PDF28 Apr 2026View
Block PlanBlock Plan · PDF28 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_26_101326 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans: Location Plan, Block Plan, As-built Front Elevation Plan, As-built Side (Left) Elevation Plan, As-built Side (Right) Elevation Plan, As-built Rear Elevation Plan, As-built Floor Plan, and As-built Roof Plan. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. Note to Applicant: The applicant is advised that any new connection to the public sewer will require the approval of Southern Water. Surface water should not be discharged into the public foul sewer. If previously unidentified public sewers are encountered during any future works, Southern Water should be contacted before works proceed.
  3. Note to Applicant: This decision is made in accordance with Section 73A of the Town and Country Planning Act 1990 (as amended), which allows for the granting of planning permission for development that has been commenced and/or been completed.
  4. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.