Council planning record

Demolition of existing single storey rear extension and conservatory and replacement with a single storey rear extension. Erection of a new enclosed front porch following removal of existing porch. Interior refurbishment and landscaping works.

8 FIR TREE CLOSE, HORTON HEATH, EASTLEIGH, SO50 7BZ

Decided PermitReference: H/26/101307Eastleigh Borough Council

Application location

8 FIR TREE CLOSE, HORTON HEATH, EASTLEIGH, SO50 7BZ

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
22 Apr 2026
Validated
18 May 2026
Determination deadline
13 Jul 2026
Local authority
Eastleigh Borough Council

Application overview

Demolition of existing single storey rear extension and conservatory and replacement with a single storey rear extension. Erection of a new enclosed front porch following removal of existing porch. Interior refurbishment and landscaping works.

Proposal details

Reference
H/26/101307
Alternative references
14878245
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
GRK Architecture (Michael Kelly)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 17 of 17

DocumentPublishedAction
Ecology response 13 7 26 for H 26 101307 8 FIR TREE CLOSE, HORTON HEATHConsultee Response · PDF13 Jul 2026View
H_26_101307 PL_Final DecisionDecision Notice · PDF13 Jul 2026View
H_26_101307 Delegated Officer ReportOfficer Report · PDF13 Jul 2026View
Parish response H_26_101307Parish Response · PDF29 May 2026View
Ecology response for H 26 101307 8 FIR TREE CLOSE, HORTON HEATHConsultee Response · PDF28 May 2026View
Tree Officer response – 8 FIR TREE CLOSE, HORTON HEATHConsultee Response · PDF27 May 2026View
Existing and Proposed Landscape PlansLandscape Plan · PDF18 May 2026View
Location PlanLocation Plan · PDF13 May 2026View
Existing Elevations PlansElevations Plan · PDF13 May 2026View
Proposed Block PlanBlock Plan · PDF13 May 2026View
Existing and Proposed Parking Allocation PlansPlans · PDF13 May 2026View
Proposed Elevations PlansElevations Plan · PDF13 May 2026View
Proposed Floor and Roof Plans · PDF13 May 2026View
Existing Block PlanBlock Plan · PDF13 May 2026View
Existing Floor and Roof PlansPlans · PDF13 May 2026View
CIL Form, Community Infrastructure LevySupporting Documents · PDF22 Apr 2026View
Application Form RedactedApplication Form · PDF22 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_26_101307 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 158/100 Rev P2, 158/101 Rev P2, 158/102 Rev P2,158/103 Rev P2, 158/104 Rev P2, 158/105 P2, 158/106 Rev P2, 158/108, and 158/108 P2. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In order to minimise the impact of the development upon local wildlife and their habitats, the following measures are recommended: All building materials shall be stored on hard standing or on pallets, as far as practicable from hedgerows, scrub or potential habitat; Any excavations must be covered at night or fitted with a small animal escape ramp; No fires shall be lit on site; Any waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife; Any animals found on site should not be handled but be allowed to move away to a place of safety on their own.
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-work
  6. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.