Council planning record

Demolition of existing conservatory to be replaced by a rear single storey extension. Front and side single storey extension, conversion of existing garage and alterations to fenestrations.

94 OAKMOUNT ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 2LP

Decided PermitReference: H/26/101248Eastleigh Borough Council

Application location

94 OAKMOUNT ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 2LP

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
13 Apr 2026
Validated
27 Apr 2026
Determination deadline
22 Jun 2026
Local authority
Eastleigh Borough Council

Application overview

Demolition of existing conservatory to be replaced by a rear single storey extension. Front and side single storey extension, conversion of existing garage and alterations to fenestrations.

Proposal details

Reference
H/26/101248
Alternative references
14852955
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
NH Architects Ltd (Nick Hopper)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
H_26_101248 PL_Final DecisionDecision Notice · PDF22 Jun 2026View
Delegated Officer Report - PDF VersionOfficer Report · PDF22 Jun 2026View
AMENDED Proposed Elevations and Floor Plans · PDF21 Jun 2026View
SUPERSEDED Proposed Elevations and Floor PlansPlans · PDF27 Apr 2026View
AMENDED Proposed Site Layout PlanSite Layout Plan · PDF21 Apr 2026View
Existing Site Layout PlanSite Layout Plan · PDF21 Apr 2026View
Location PlanLocation Plan · PDF13 Apr 2026View
SUPERSEDED Proposed Elevations and Floor PlansElevations And Floor Plan · PDF13 Apr 2026View
Existing Elevations and Floor PlansElevations And Floor Plan · PDF13 Apr 2026View
SUPERSEDED Proposed Site PlanSite Layout Plan · PDF13 Apr 2026View
Application Form_RedactedApplication Form · PDF13 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_26_101248 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: NHA OR 001-P (Location Plan), NHA OR 005-P Rev A (Proposed site layout plan), NHA OR 006-P (B) Rev C (Proposed Elevations and Floor Plans), Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing dwelling. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. A precautionary working method must be used to prevent harm to wildlife that could be using this site, as follows: •All deliveries and construction materials need to be stored on pallets or hard standing (including) gravelled areas. •Any construction waste must either be kept in the proposed materials storage/skip or on pallets or hard standing and checked for the presence of reptiles and small mammals before disposal. •No fires can be lit on site. •Any footings that are to be left unfilled overnight need to be tightly covered so that nothing can fall into the holes left behind. Each morning the footings need to be inspected for any animals that may a have fallen in overnight. •All garden and vegetated areas where construction activities are likely are to be kept short, so not to form habitat that could be suitable for reptile and small mammals, this works should be carried out when and if necessary. •If any bushes, hedges and or trees are to be removed/managed then this work must be done outside of the bird nesting season which runs between March and August. Reason: To protect biodiversity.
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: Biodiversity enhancements are required in accordance with Local Plan policy DM11 and NPPF paragraphs 187d and 192b, and are recommended in the form of a bat box or a swift nest box on the existing building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight.
  7. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.